SOW_Tiles_Sag_B5.pdf
PDF 136 KB Posted
- Attached to
- Remove Tiles in Sagamore Bldg 5 Federal contract opportunity
- Solicitation number
- FA2835-18-R-0011
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA2835-18-R-0011.pdf | ||
| Drawing.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
For
Remove Tiles in Computer Rooms
Location Building: Sagamore Hill 5
By: Lenore Gerossie
WORK ORDER NUMBER: 67211
DATED: 17 May 2018
GENERAL INFORMATION:
This project is intended to remove tiles in Sagamore Hill’s Bldg. 5 in accordance with all applicable National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the
Commonwealth of Massachusetts Building Code and Massachusetts General Law requirements, Unified Facilities Criteria (UFC), state and federal codes, base standards and manufacturer’s instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply. Effective immediately: Due to safety concerns the use of manhole fixed ladders on Hanscom AFB for the purpose of entry or egress is prohibited. The use of an alternative means of entry/egress (i.e. appropriate portable ladder/personnel lowering device) is authorized.
SCOPE: Remove the existing tile in Bldg. 5 Operations and Maintenance area.
Remove two desks and associated cabinetry, one computer workstation, one workbench, three toolboxes and one Refrigerator in the Maintenance area in way of carpet removal. (8 Inergen
Gas Bottles shall remain).
Remove and dispose of approximately 1300 square feet of tiles (Flooring under Equipment
Racks, Inergen Gas Bottles and in UPS room shall remain).
Remaining electronics/furniture to be wrapped in ESD proof plastic or similar dust proof wrapping
Provide 8’x20’ Conex box for storage
See attached drawing for location
Prep concrete flooring
Shot blast flooring with Hepa Filter discharge hose to be placed outside away from openings
Negative air machine(s) to create negative pressure in room to be discharged outside away from opening to prevent re-contamination of room
Floor will be leveled with manufactures approved leveling compound
Ridge at doorway between floor rooms to feathered so transitions in plane with both rooms
Testing to be done to check moisture in flooring according to ASTM F 2170 Standard Testing
Method for determining relative humidity in concrete flooring Slabs using situ Probes. Surface
Ph of the concrete should be range between 7 and 9. If the test results exceed the limitations must not proceed until problem has been corrected
Provide submittals for floor adhesive and leveling agent.
Copper grounding strips (.003)approximately2 feet long and attached to wall sockets to be covered by from top of cove base to electrical outlet boxes
At least one grounding strip is required for every 500 square foot of tile Approximately 2 grounding strips in Operation area and 2 grounding strips in the Maintenance area
Note: All horizontal copper strips runs will be under 6” cove base. Only vertical will be directly under existing box to be connected to.
Install new non-conductive Armstrong floor tile ESD-Static Control 12” x 12” x 1/8” Vinyl
Tile Flooring, Fossil Gray, Part Number 51956 (Must have same lot numbers for color match
Remove tile by entryway
Prep floor and install waterhog mat in approved manufacturers specifications
Apply touch-up painting where required.
Install nonconductive transition strips as needed
Install new Gray Cove Base in areas of new flooring.
Trim doors as needed
Reinstall all office furniture in way of new flooring installation.
GENERAL REQUIREMENTS:
Work includes, but is not limited to the following:
a. Provide resolutions of any technical problems that arise during the construction.
b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.
c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.
d. The Contractor is solely responsible for compliance with the Occupational Safety and
Health Act of 1974 (OSHA) and the protection of their employees and all sub-contractor employees. In performing work under this contract on a Government installation, the contractor shall report any accidents involving Air Force property/equipment damage, or contractor personnel injuries occurring on the job or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the contracting officer within five days.
e. Complete the “builder data inventory and assessment sheet” for newly installed assets, ensuring the bar code number is attached to the new equipment. Transfer bar codes from any removed equipment to the builder assessment ½ sheet form.
f. Provide three (3) copies of O & M manuals and warranty letter.
g. Period of Performance 60 days after award of contract.
ADMINISTRATION:
Points of Contact (POC):
POC: Lenore Gerossie Phone Number. (781) 225-2960
Alternate POC: Bill Neice Phone Number. (781) 225-6157