Attch_3_GLEN17-1002_AF_Form_66.xls

XLS spreadsheet 130 KB Posted

Attached to
Repair by Replace Chillers, B712 GLEN 17-1002 Federal contract opportunity
Solicitation number
FA2550-17-R-1018
Issued by
Department of the Air Force Space Command

About this file

Attch 3 - AF Form 66 Submittal Registry

View the file

Other files for this federal contract opportunity

Other files attached to Repair by Replace Chillers, B712 GLEN 17-1002, newest first.
File Type Posted
GLEN171002_MD-101.dwg DWG drawing
GLEN171002_E-601.pdf PDF
GLEN171002_ED-101.pdf PDF
GLEN171002_M-001.dwg DWG drawing
Attch_2_GLEN17-1002_Specifications.pdf PDF
GLEN171002_MD-101.pdf PDF
GLEN171002_E-001.dwg DWG drawing
GLEN171002_E-101.pdf PDF
GLEN171002_Drawings.pdf PDF
GLEN171002_E-101.dwg DWG drawing
SOW_GLEN17-1002_1_May_17.pdf PDF
GLEN171002_G-001.pdf PDF
GLEN171002_M-101.dwg DWG drawing
GLEN171002_E-001.pdf PDF
GLEN171002_M-101.pdf PDF
GLEN171002_M-001.pdf PDF
GLEN171002_M-601.pdf PDF
GLEN171002_G-001.dwg DWG drawing
GLEN171002_E-601.dwg DWG drawing
GLEN171002_M-601.dwg DWG drawing
GLEN171002_ED-101.dwg DWG drawing
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal 1

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT NAMESOLICITATION /CONTRACT NUMBER
GLEN 17-1002Repair by Replace Chillers, B712
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERNote: Submittal to be sent electronically.CERTIFICATE OF COMPLIANCESHOP DRAWINGSCOLOR SELECTIONMANUFATURUR'S RECOMMENDATIONCATALOG DATAO&M RECOMMENDATIONSCALCULATIONSWARRANTYDRAWINGSREPORTTEST RESULTSREQUIRED SUBMISSION DATEDATE TO CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSAPPROVEDDISAPPROVEDCONTRACTOR SUBMITTALFINAL APPROVALREMARKS
GENERAL
1Specification Section 01 00 00 para. 1.5.10.1.b: AF Form 3064, Contract Progress ScheduleXNTP+10 Days
2Specification Section 01 00 00 para. 1.5.10.1.b: AF Form 3065, Contract Progress ReportXPer Contract
3Specification Section 01 35 29 para. 1.2.1.1.a and b: Accident Prevention Plan and Activity Hazard AnalysisXPrior to Project Start
4Specification Section 01 57 20.00 10, Appendix A, Contractor Hazardous Material Approval FormXPrior to Project Start
5Specification Section 01 57 20.00 10, Appendix B: Green Products Determination FormXPrior to Project Start
6Specification Section 01 57 20.00 10, Appendix C:Recovered Materials Estimate and Certification FormXPrior to Project Start
CONCRETE
7Specification Section 03 30 00 para. 2.3.1: Concrete mix designXNTP+15 Days
8Specification Section 03 30 00 para. 3.9.2: Concrete testingXPrior to Closeout
MECHANICAL
9Specification Section 23 07 00 para. 2.2: Pipe InsulationXNTP+15 Days
10Specification Section 23 64 10 para. 2.4: ChillersXNTP+15 Days
11Specification Section 23 64 26 para. 2.2: Chilled water pipingXNTP+15 Days
12Specification Section 23 64 26 para. 3.5: TrainingXPrior to Closeout
ELECTRICAL
13Specification Section 26 05 19.00 10 para. 2.1: Wiring and conduitXNTP+15 Days
CLOSEOUT
14Specification Section 01 57 20.00 10 para. 2.6.3:Recycling ReportsXPrior to Closeout
15Specification Section 01 78 00 para 2: As-Built DrawingsXPrior to Closeout
16Specification Section 01 78 00 para 2.4: O&M ManualsXPrior to Closeout