Attch_3_GLEN17-1002_AF_Form_66.xls
XLS spreadsheet 130 KB Posted
- Attached to
- Repair by Replace Chillers, B712 GLEN 17-1002 Federal contract opportunity
- Solicitation number
- FA2550-17-R-1018
About this file
Attch 3 - AF Form 66 Submittal Registry
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| GLEN171002_MD-101.dwg | DWG drawing | |
| GLEN171002_E-601.pdf | ||
| GLEN171002_ED-101.pdf | ||
| GLEN171002_M-001.dwg | DWG drawing | |
| Attch_2_GLEN17-1002_Specifications.pdf | ||
| GLEN171002_MD-101.pdf | ||
| GLEN171002_E-001.dwg | DWG drawing | |
| GLEN171002_E-101.pdf | ||
| GLEN171002_Drawings.pdf | ||
| GLEN171002_E-101.dwg | DWG drawing | |
| SOW_GLEN17-1002_1_May_17.pdf | ||
| GLEN171002_G-001.pdf | ||
| GLEN171002_M-101.dwg | DWG drawing | |
| GLEN171002_E-001.pdf | ||
| GLEN171002_M-101.pdf | ||
| GLEN171002_M-001.pdf | ||
| GLEN171002_M-601.pdf | ||
| GLEN171002_G-001.dwg | DWG drawing | |
| GLEN171002_E-601.dwg | DWG drawing | |
| GLEN171002_M-601.dwg | DWG drawing | |
| GLEN171002_ED-101.dwg | DWG drawing |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal 1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT NAME | SOLICITATION /CONTRACT NUMBER | |||||||||||||||||||
| GLEN 17-1002 | Repair by Replace Chillers, B712 | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| LINE NUMBER | Note: Submittal to be sent electronically. | CERTIFICATE OF COMPLIANCE | SHOP DRAWINGS | COLOR SELECTION | MANUFATURUR'S RECOMMENDATION | CATALOG DATA | O&M RECOMMENDATIONS | CALCULATIONS | WARRANTY | DRAWINGS | REPORT | TEST RESULTS | REQUIRED SUBMISSION DATE | DATE TO CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | APPROVED | DISAPPROVED | CONTRACTOR SUBMITTAL | FINAL APPROVAL | REMARKS |
| GENERAL | ||||||||||||||||||||||
| 1 | Specification Section 01 00 00 para. 1.5.10.1.b: AF Form 3064, Contract Progress Schedule | X | NTP+10 Days | |||||||||||||||||||
| 2 | Specification Section 01 00 00 para. 1.5.10.1.b: AF Form 3065, Contract Progress Report | X | Per Contract | |||||||||||||||||||
| 3 | Specification Section 01 35 29 para. 1.2.1.1.a and b: Accident Prevention Plan and Activity Hazard Analysis | X | Prior to Project Start | |||||||||||||||||||
| 4 | Specification Section 01 57 20.00 10, Appendix A, Contractor Hazardous Material Approval Form | X | Prior to Project Start | |||||||||||||||||||
| 5 | Specification Section 01 57 20.00 10, Appendix B: Green Products Determination Form | X | Prior to Project Start | |||||||||||||||||||
| 6 | Specification Section 01 57 20.00 10, Appendix C:Recovered Materials Estimate and Certification Form | X | Prior to Project Start | |||||||||||||||||||
| CONCRETE | ||||||||||||||||||||||
| 7 | Specification Section 03 30 00 para. 2.3.1: Concrete mix design | X | NTP+15 Days | |||||||||||||||||||
| 8 | Specification Section 03 30 00 para. 3.9.2: Concrete testing | X | Prior to Closeout | |||||||||||||||||||
| MECHANICAL | ||||||||||||||||||||||
| 9 | Specification Section 23 07 00 para. 2.2: Pipe Insulation | X | NTP+15 Days | |||||||||||||||||||
| 10 | Specification Section 23 64 10 para. 2.4: Chillers | X | NTP+15 Days | |||||||||||||||||||
| 11 | Specification Section 23 64 26 para. 2.2: Chilled water piping | X | NTP+15 Days | |||||||||||||||||||
| 12 | Specification Section 23 64 26 para. 3.5: Training | X | Prior to Closeout | |||||||||||||||||||
| ELECTRICAL | ||||||||||||||||||||||
| 13 | Specification Section 26 05 19.00 10 para. 2.1: Wiring and conduit | X | NTP+15 Days | |||||||||||||||||||
| CLOSEOUT | ||||||||||||||||||||||
| 14 | Specification Section 01 57 20.00 10 para. 2.6.3:Recycling Reports | X | Prior to Closeout | |||||||||||||||||||
| 15 | Specification Section 01 78 00 para 2: As-Built Drawings | X | Prior to Closeout | |||||||||||||||||||
| 16 | Specification Section 01 78 00 para 2.4: O&M Manuals | X | Prior to Closeout |