Q&A.pdf

PDF 35 KB Posted

Attached to
Construct HV Duct Bank, Trident MACA Federal contract opportunity
Solicitation number
FA252119BA018
Issued by
Department of the Air Force Space Command

About this file

This document contains a pre-solicitation notice and questions and answers related to solicitation number FA252119BA018 for the Construct HV Duct Bank, Trident MACA project. The work involves upgrading the existing Trident and MACA area medium voltage underground distribution system and Trident area lighting feeders. Services required include replacing an existing switch with a new switch, constructing an underground duct bank between switches, installing sectionalizing cabinets along the route, reconnecting existing feeders, and providing new feeders from an existing panel to light fixtures. The estimated value is between $1,000,000 and $5,000,000. The performance period is 260 calendar days from notice to proceed. The acquisition is 100% set aside for women-owned small businesses. The invitation for bid will be available on May 1, 2019 through the Federal Business Opportunities website. Offerors must register in the System for Award Management to be eligible for award. Payments will be made through the Wide Area Workflow system, and contractors must register in WAWF. The place of performance is Cape Canaveral Air Force Station, Florida, and the agency is the Department of the Air Force Space Command.

Q&A

View the file

Other files for this federal contract opportunity

Other files attached to Construct HV Duct Bank, Trident MACA, newest first.
File Type Posted
19BA018_Abstract_of_Offers.pdf PDF
Precon_05-Badge_Request_45_SFS_Form,_V11_25Jul18.pdf PDF
Form_3052_-_Constr_Cost_Est_Breakdown_w_cont.xls XLS spreadsheet
RMD_Fm_(5.29.19).pdf PDF
Haz_Waste_Form.doc DOC document
19BA018_Sol_Approved.pdf PDF
DBEH_14-1510,_Specifications.pdf PDF
DBEH_14-1510,_Drawings_Compressed.pdf PDF
WD_051019.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers

Solicitation: FA252119BA018

Title: Construct HV Duct Bank, Trident MACA

1. Question: What facilities will require temporary generators?

Answer: It depends on the duration of the outage. If outage is less than two hours only the two lift stations on transformer TRIF7 will need generator support. If over two hours TRIF7 and transformer TRIF3 will need generators. Outages will need to be coordinated when a boat is not at the Trident Wharf.

2. Question: What size generator will be required for each facility requiring temporary generators?

Answer: TRIF7 can use 100KW generator. TRIF3 can use 600KW.