Lap_pool_requirements_(002)_Brief_SOW.pdf

PDF 66 KB Posted

Attached to
Pool Heater Installation Federal contract opportunity
Solicitation number
FA252118QB164
Issued by
Department of the Air Force Space Command

About this file

SOW

View the file

Other files for this federal contract opportunity

Other files attached to Pool Heater Installation, newest first.
File Type Posted
18QB164_Combined_Synopsis_Solicitationrv1.pdf PDF
18QB164_Combined_Synopsis_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Here are the requirements for the Lap Pool Heater

1 lap pool heater that is at least a 1.8 million BTU heater powered by natural gas to heat 250,000 gallons of chorine water to a temperature of at least 78 degrees Fahrenheit

All fittings/pipes need to be made of galvanized metals since they will be exposed to the climate

Unit must be able to connect to existing piping located above ground level

Unit requires a ventilation kit

A new breaker to support new unit must be installed in an existing breaker box by the contractor

All labor, installation and delivery must be handled by contractor

A warranty of at least 1 year on labor and unit from date of install

Installers must be able to gain access to PAFB through for install. Security Forces will check backgrounds.

File details come from the government source that posted it.