Statement of Work (SOW)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Brand_Name_FBO.pdf | ||
| Local_Floor_Plans.xlsx | XLSX spreadsheet | |
| SC-1017ProductColorChart_LR.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
14 April 2017 From 920 MSG/RA
To Whom It May Concern
Subject Statement of Work – Part 2 of 920 SFS Locker Project
Requirement for Mobile Personal Duty Lockers provided for in this requirement are a complete turnkey solution.
The system will include assembly of rails and platforms to be placed on top of the existing floor with no structural modifications. The project includes the assembly, configuration, and stabilization of the carriages and shelving system. Seamless/100% compatible with the locker systems previously installed and currently in use.
This is a Level 2 Installation which requires professional, trained personnel (above the capabilities of the end user) to ensure proper assembly and functionality, validation of system in expected working condition free of any defects and commencement of manufacturer’s warranty. This level includes most Mobile Systems. No modifications to the facility structure are required.
The solution includes ALL material and equipment, shipping, and full turn-key installation services.
• The area of installation must be cleared and ready for the new Storage System.
• The storage system will be installed and tested as specified in the design layout.
• Full training of all equipment is included if applicable.
The services listed above ensure proper handling, placement, function and utilization of the system at time of receipt. Warranty is activated at that time.
If relocation or removal is desired, system can be easily uninstalled and the facility structure will be unchanged from its original state prior to system installation. Simple installation will allow this space to be returned to the same condition prior to this project with removal of all products at the user level.