Amendment 0003 Revised Q A regarding bid submission and removed attachment 6

View the file

Other files for this federal contract opportunity

Other files attached to Repair High Voltage Transformers, newest first.
File Type Posted
FA2521-13-B-0002_0002.pdf PDF
Record_of_Attendance_4_June_2013.pdf PDF
FA2521-13-B-0002_0001.pdf PDF
Atch_7_Question_and_Answer_Template.docx DOCX document
Atch_4_DBA_WD_FL130001_20130405__FL1.docx DOCX document
Atch_5_Haz_Waste_Form.doc DOC document
Atch_2_Drawings.pdf PDF
Atch_3_Recovered_Materials.pdf PDF
Atch_1_Specifications.pdf PDF
Atch_6_CECC_Form_3052.xls XLS spreadsheet
IFB__FA2521-13-B-0002.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DBEH 13-1735

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

A. Revise government's answ er to question regarding lump sum pricing and cost breakdow n.

B. Remove Attachment #6, "CECC Form 3052."

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jun-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA2521-13-B-0002

X 9B. DATED (SEE ITEM 11)

16-May-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jun-2013

CODE

45 CONS/LGCAC

14640 HANGAR ROAD

CCAFS 1704 ROOM 2102B MS2037

PATRICK AFB FL 32925-2206

FA2521 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA2521-13-B-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

QUESTIONS AND ANSWERS

DBEH 13-1735, Repair High Voltage Transformers

FA2521-13-B-0002

QUESTION AND ANSWER

RFP Section Drawings Paragraph NA

SOW/Technical Specification/Drawings paragraph/page SHEET E2

Other (Specify) NA

Question: SPECIFIC NOTE (H) WORK ASSOCIATED WITH FACILITY #80505

IS IN A RESTRICTED AREA. WILL ESCORTS BE PROVIDED TO THE CONTRACTOR

WHILE WORK IS ONGOING IN THIS AREA DURING NORMAL WORK HOURS AS

WELL AS NIGHTS AND WEEKENDS?

Answer: NO escorts will be provided. Contractor will have to provide their own escorts.

Contractor will not be able to access MSA 2 before 7am and will have to leave before 3pm.

RFP Section Drawings Paragraph NA

SOW/Technical Specification/Drawings paragraph/page SHEET E2

Other (Specify) NA

Question: FLAG NOTE (E) SAYS GENERATOR SUPPORT IS TO BE

PROVIDED. WILL THIS BE NECESSARY IF IT IS DONE OUTSIDE OF FACILITY

WORKING HOURS, BECAUSE THE DURATION FOR THIS TRANSFORMER SWAP

WILL BE MINIMAL.

Answer: Facility 80505: will need a generator to be on standby 150w

Facility 67210: will not require a generator

Facility 1641: No generator is required if contractor replaces each transformer on two separate power outages (one transformer per power outage)

Facility 1663: will not require a generator No generator is required if contractor replaces each transformer on two separate power outages (one transformer per power outage)

SOW/Technical Specification/Drawings paragraph/page SHEET E1

Other (Specify) NA

Question: GENERAL NOTE (17) SAYS TRANSFORMER OIL SHALL BE

TESTED FOR PCB’S. IF TRANSFORMERS ARE PCB FREE WILL THEY BECOME THE

PROPERTY OF THE CONTRACTOR FOR DISPOSAL.

Answer: If the intent is to reuse the transformer the contractor can take the transformer with the oil at < 50 parts per mil. Contractor has to make sure the transformer is safely transported with no oil spills. Anything over 50 the government will dispose of the oil.

Other (Specify) NA

Question: GENERAL NOTE (14) SAYS WHERE LEAD CABLE IS CUT IT IS TO

BE PROPERLY SEALED. IS IT ANTISIPATED THAT WE WILL INCOUNTER LEAD

CABLE?

Answer: Yes, we expect the contractor to run into lead cable

Other (Specify) NA

Question: GENERAL NOTE (16) SAYS TESS ENGINEERING WILL TEST

EXISTING CONCRETE STRUCTURES FOR ASBESTOS. IF ASBESTOS IS

INCOUNTERED WILL THIS BE A CHANGE TO THE CONTRACTOR FOR

ABATEMENT?

Answer: Design contractor tested concrete for asbestos, and no asbestos was found.

SOW/Technical Specification/Drawings paragraph/page SHEET E3

Other (Specify) NA

Question: SPECIFIC NOTE (C) SAYS TO PROVIDE A CONCRETE PULL BOX.

WHAT TRAFFIC RATING IS THE COVER TO BE?

Answer: Traffic rating shall be H-20

Other (Specify) NA

Question: SPECIFIC NOTE (D) SAYS TO INTERCEPT CONDUIT TO MH838.

IS THIS JUST A CONDUIT OR IS IT A CONCRETE ENCASED DUCT BANK? IF IT IS A

DUCT BANK WILL IT NEED TO BE CONRETE INCASED TO THE NEW LOCATION?

Answer: A Concrete encased duct bank and it will need to be concert incased to the new equipment.

Other (Specify) NA

Question: SPECIFIC NOTE (G) WORK ASSOCIATED WITH FACILITY #67210

IS IN A RESTRICTED AREA. WILL ESCORTS BE PROVIDED TO THE CONTRACTOR

WHILE WORK IS ONGOING IN THIS AREA DURING NORMAL WORK HOURS AS

WELL AS NIGHTS AND WEEKENDS?

Answer: No escorts will be provided. Contractor will have to provide their own escorts.

Other (Specify) NA

Question: FLAG NOTE (H) SAYS GENERATOR SUPPORT IS TO BE

PROVIDED. WILL THIS BE NECESSARY IF IT IS DONE OUTSIDE OF FACILITY

WORKING HOURS?

Answer: Facility 80505: will need a generator to be on standby 150w

Facility 67210: will not require a generator

Facility 1641: No generator is required if contractor replaces each transformer on two separate power outages (one transformer per power outage)

SOW/Technical Specification/Drawings paragraph/page SHEET E3,E4

Other (Specify) NA

Question: BECAUSE THE LENGTHS OF 15KV CABLE ARE SO SHORT AND

WILL REQUIRE A MINIMUM ORDER WILL THE GOVERNMET PROVIDE THIS

CABLE, OR SET A 10,000’ MINIMUM OF EACH SIZE FOR EACH CONTRACTOR TO

PURCHASE AND TURN OVER THE EXCESS AT THE END OF THE CONTRACT?

Answer: Contractor will need to purchase 10,000 LNFT and turn the excess into the government.

Other (Specify) NA

Question: WHAT TYPE AND SIZE IS THE EXISTING 15KV CABLE IN MH 833

WE ARE TO SPLICE ON TO? AND CAN THE NEW CABLE TO TRANSFORMER MC19

BE 4/0 INSTEAD OF #2 SO WE CAN PURCHASE ONLY ONE SIZE OF CABLE FOR THIS

PROJECT, BECAUSE OF MINIMAL ORDERS FOR PURCHASE.

Answer: The new cable is spliced to the existing cable in MH 838. The cable from MH 838 to the existing switch MCIV9 is 4/0 lead cable. The new cable can be 4/0 from the MH 838 to the new transformer.

SOW/Technical Specification/Drawings paragraph/page SHEET E4

Other (Specify) NA

Question: WHAT TYPE AND SIZE IS THE EXISTING 15KV CABLE IN THE

MH WE ARE TO SPLICE ON TO?

Answer: manhole survey (2002) shows 3-1/C #4/0 15KV EPR cable. Contractor to verify

Other (Specify) NA

Question: SPECIFIC NOTE (L) WORK ASSOCIATED WITH FACILITY #01641

IS IN A RESTRICTED AREA. WILL ESCORTS BE PROVIDED TO THE CONTRACTOR

WHILE WORK IS ONGOING IN THIS AREA, DURING NORMAL WORK HOURS AS

WELL AS NIGHTS AND WEEKENDS?

Answer: No escorts will be provided. Contractor will have to provide their own escorts.

SOW/Technical Specification/Drawings paragraph/page SHEET E5

Other (Specify) NA

Question: CAN HEAT SHRINK SPLICES BE PROVIDED IN LIEU OF PRE-

MOLDED AS DETAILED?

Answer: No Heat Shrink Splices. Must be cold shrink splice.

RFP Section 26 05 13 Paragraph 3.2

SOW/Technical Specification/Drawings paragraph/page NA

Other (Specify) NA

Question: ARE WE REQUIRED TO USE AN INDEPENDENT TESTING

ORGANIZATION FOR TRANSFORMER TESTING OR CAN THE CONTRACTOR SELF

PERFORM THESE TEST?

Answer: Must use an independent contractor for transformer testing.

RFP Section 26 12 00 Paragraph 3.2

Other (Specify) NA

Question: ARE WE REQUIRED TO USE AN INDEPENDENT TESTING

ORGANIZATION FOR CABLE TESTING OR CAN THE CONTRACTOR SELF PERFORM

THESE TEST?

Answer: Must use an independent contractor for Cable testing.

RFP Section NA Paragraph NA

Other (Specify) SOLICITATION

Question: ARE WE TO PROVIDE PRICING IN LUMP SUM AS SHOWN ON

PAGE 3 OF THE SOLICITATION (SECTION B- Supplies or Services and Prices) OR A FULL

BREAKDOWN AS REQUIRED BY Atch #6 CECC form?

Answer: In accordance with Section L-4 “BID SUBMISSION,” offerors are to provide pricing in lump sum in Section B under Amount. Attachment #6 has been removed from solicitation.

SOW/Technical Specification/Drawings paragraph/page SHEET E6

Other (Specify) NA

Question: SPECIFIC NOTE (C) REFERS TO A COUNTERPOISE TYING TO

THE GROUND ROD IN THE PULL BOX DETAL. NO COUNTERPOISE IS SHOWN FOR

THE SECONDARY CONDUIT FROM THE TRANSFORMER. IS ONE REQUIRED?

Answer: This is a general note for the use of exothermic weld to connect the ground rod to the ground wire or counterpoise. In this case refers to the ground wire, no counterpoise is required

Other (Specify) NA

Question: SPECIFIC NOTE (B) STATES TO RELOCATE METERING

EQUIPMENT CONDUIT. BUT NOTE (J) STATES PROVIDE NEW METER. FOR WHAT

PURPOSE IS THE RELOCATION OF THE EXISTING METER CONDUIT?

Answer: Disregard the relocation of the metering on note B, provide new meter and channel support as per note J. Please indicate CT ratio on new meter faceplate.

Other (Specify) NA

Question: THE ONE LINE SHOWS AN EXISTING FACILITY #01641

GENERATOR. WILL THE CONTRACTOR NEED TO PROVIDE ADDITIONAL

GENERATOR BACKUP FOR THIS FACILITY?

Answer: No generator is required if contractor replaces each transformer on two separate power outages (one transformer per power outage)

Other (Specify) NA

Question: ON THE WALK DOWN MANHOLE 838 COULD NOT BE LOCATED

BUT MANHOLE 833 WAS. SHOULD WE FIGURE PULLING NEW CABLE TO MH833

AND SPLICING THERE?

Answer: No. Manhole 838 is located just outside the fence on the East side of the road. The new cable shall be spliced to the existing in this manhole. Assume a distance of 150 FT to transformers for bid calculations.

SOW/Technical Specification/Drawings paragraph/page SHEET E2,E4

Other (Specify) NA

Question: EXISTING TRANSFORMERS TVCF2, TVIF3, MRTBIF AND XFMR

SHOW US RECONNECTING THE EXISTING 15KV CABLE AND ELBOWS TO THE NEW

TRANSFORMERS. ON THE WALK DOWN IT WAS MENTIONED THAT NEW LOAD

BREAK ELBOWS WERE DESIRABLE. SHOULD THEY BE ADDED?

Answer: Yes new load break elbows should be added to bid as well as MCOV 8.4 kV Duty

Cycle voltage rating 10 kV arrestors

SOW/Technical Specification/Drawings paragraph/page SOLICITATION

Other (Specify) NA

Question: CAN NAMES AND CONTACT INFORMATON OF APPROVED

ESCORT COMPANIES BE PROVIDED THAT CAN BE USED FOR ALL SECURE AREAS?

Answer: Government does not recommend or endorse any specific contractor however past projects have used SOS and Pinkerton. It is the contractor’s responsibility to ensure that the subcontractor has the right escort privileges before entering into an agreement with subcontractor.

Other (Specify) NA

Question: IS TRANSFORMER TVIF3 TO BE 112.5KVA AS SHOWN ON THE

MODIFIED ONE-LINE OR 225KVA AS SHOWN IN SPECIFIC NOTE (B)?

Answer: Transformer TVIF3 and TVCF2 are 112.5 KVA

Other (Specify) NA

Question: IS TRANSFORMER TVCF2 TO BE 112.5KVA AS SHOWN ON THE

MODIFIED ONE-LINE OR 225KVA AS SHOWN IN SPECIFIC NOTE (A)?

Answer: Transformer TVIF3 and TVCF2 are 112.5 KVA

RFP Section __________ Paragraph 1.8.1

SOW/Technical Specification/Drawings paragraph/page SPEC SECTION 01 11 00.00 55

Other (Specify) ___________________________

Question: PLEASE CONFIRM APPROXIMATE LOCATION OF STORAGE AREA(S) AND

OFFICE TRAILER SPACE (AND UTILITIES AVAILABLE) SO THAT TRANSPORTATION

COSTS CAN BE ESTIMATED.

Answer: For MRTBIF and MCI9 Trailers and lay down areas will be outside of MSA 2’s fence in the parking lot away from the road. XYI3 and XYI1 will be in the east side of the parking lot.

For TVIF3 and TVF2 any area away from the building.

RFP Section __________ Paragraph 3.9

Other (Specify) ___________________________

Question: _PLEASE CONFIRM THE REQUIREMENT THAT THE CONTRACTOR’S

SUPERINTENDENT “SHALL BE ON THE JOB SITE AT ALL TIMES WHEN WORK IS

TAKING PLACE…”

Answer: Contractor’s Superintendent or designated alternate needs to be on site at all times during construction. Some POC that can speak for the contractor needs to be on site for safety and emergency situations

RFP Section __________ Paragraph 3.8.2

Other (Specify) ___________________________

Question: _PLEASE CONFIRM THE REQUIREMENT THAT THE CONTRACTOR’S

QUALITY CONTROL MANAGER “SHALL BE A DIFFERENT INDIVIDUAL THAN THE

PROJECT SUPERINTENDENT” AND “SHALL BE AVAILABLE DURING NORMAL

DUTY WITHIN THIRTY (30) MINUTES AFTER NOTIFICATION TO MEET WITH THE

CONTRACTING OFFICER…”

Answer: Contractor’s Project Manager can also serve as the Quality Control Manager but not the superintendent.

RFP Section __________ Paragraph 2.1.1.3

SOW/Technical Specification/Drawings paragraph/page SPEC SECTION 26 12 00.00 40

Other (Specify) ___________________________

Question: _PLEASE CONFIRM THE REQUIREMENT FOR 304L STAINLESS STEEL

TRANSFORMER ENCLOSURES AND BASES.

Answer: Transformer enclosures and bases are 304 Stainless Steel

RFP Section __________ Paragraph _________

SOW/Technical Specification/Drawings paragraph/page G2

Other (Specify) NOTE #1

Question: Haven’t found the catalog numbers for the equipment needed, is the contract documents with the solicitation?

Answer: This information is not provided.

RFP Section __________ Paragraph _________

SOW/Technical Specification/Drawings paragraph/page ___________

Other (Specify) ___________________________

Question: _____ Question: where are to place the bollards for the relocation of new panels and transformer?___________________________________________________________________

Answer: Any existing bollards leave in place. No new bollards are to be installed. If you have to remove the bollards to place the transformers or switches the bollards will need to be reinstalled. Removed bollards can be kept on site until reinstalled.

QUESTIONS FROM SITE VISIT

Question 1: What type and size of cable is in manhole feeding transformer MCI9?

Answer 1: The cable is 4/0 lead cable.

Question 2: Where is the new pull-box located at MCI9?

Answer 2: Where the old transformer is currently located.

Question 3: Where is concrete disposal?

Answer 3: You must dispose all materials off-base.

Question 4: Will government test for asbestos on concrete pad currently holding switch at

MCI9? (Ref E1 note)

Answer 4: During Design Concrete was tested for asbestos. No asbestos was found.

Question 5: How far is manhole from MCI9 Transformer?

Answer 5: The manhole is labeled correctly as 838 and is located just outside the fence to the east. Assume 150LNFT away from transformers for bid calculations

Question 6: Will you allow hot shrink splicing?

Answer 6: no, cold shrink splicing only.

Question 7: Is drawing E3 mislabeled regarding manhole 838?

Answer 7: No, manhole 838 is located just outside of the facility fence.

Question 8: If it is required to reroute conduit, what are restrictions on digging through road at

MCI9 site?

Answer 8: If the street is cut or damaged it would have to be repaired to the condition it was in or better than before the cut. Following is our guidelines for utility cut repairs

Provide 12” of Stabilized Subbase compacted to 95% Modified Proctor Density, Min LBR 40

Provide 9” Limerock Base compacted to 95% Modified Proctor Density, Min LBR 100. New limerock area is to overlap undisturbed subbase by at least 6”.

Provide 2” asphalt concrete pavement Type SP-12.5 (in lieu of information below.)New asphalt pavement is to overlap existing base by at least 12”.

Width of patch should be approximately 5’ wide, however less or more than 5’ may be required depending on width of undisturbed subbase and base.

Question 9: Are new elbow arrestors required on transformers?

Answer 9: Yes new MCOV 8.4 kV Duty Cycle voltage rating 10 kV arrestors

Question 10: What is the minimum generator size needed for each site?

Answer 10: Facility 80505: will need a generator to be on standby 150kw

Facility 67210: will not require a generator

Facility 1641: No generator is required if contractor replaces each transformer on two separate power outages (one transformer per power outage)

Question 11: How long willl generator need to run at each site?

Answer 11: Facility 80505: will need a generator to be on standby 150kw. In emergency it will need to run the duration of the outage. If not just be on standby.

Question 12: Are diesel generators authorized?

Answer 12: Yes

Question 13: Contractor required to provide escorts at secure sites. What are recommended companies?

Answer 13: Government does not recommend or endorse any specific contractor however past projects have used SOS or Pinkerton. It is the contractors responsibility to ensure that the subcontractor has the right escort privileges before entering into an agreement with subcontractor.

Question 14: Will Transformer XYI3 be transported to base shop by contractor?

Answer 14: YXI3 will be given back to the electrical shop. Government will transport.

Contractor will need to set it on the trailer for transport.

Question 15: How deep is concrete slab, and how deep does conduit need to be set into concrete slab at XYI1/XYI3 transformer site?

Answer 15: From field investigation pictures the slab looks at least 12 inches. The conduits should be deep enough in the slab to provide a cover of 2 inches.

Question 16: What sites require escorts?

Answer 16: Facility 80505 MSA 2, Facility 67210 and Facility 1641.

Question 17: Will contractor be responsible for disposing XYI1? If so, are there PCBs?

Answer 17: Yes, Contractor will have to verify PCB content. It is believed to be less than 50

PPM. If the intent is to reuse the transformer the contractor can take the transformer with the oil at < 50 parts per mil. Contractor has to make sure the transformer is safely transported with no oil spills. Anything over 50 the government will dispose of the oil.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

ATTACHMENT NUMBER

NUMBER TITLE PAGES DATE

1 Specifications, DBEH 13-1735 176 18 Sep 2012

2 Drawings, DBEH 13-1735 7 26 Jul 2012

3 Recovered Materials Determination Form 2 18 Sep 2012

4 DBA WD FL130001 20130405 FL1 8 5 Apr 2013

5 Forecast of Contractor’s Hazardous Waste 2 N/A

Generation Form

6 Question and Answer Template 1 N/A

7 Site Visit Record of Attendance 1 4 June 2013

(End of Summary of Changes)