ATTACHMENT 1- Statement of Work Amendment 1.pdf
PDF 273 KB Posted
- Attached to
- 16 SPCS GEOLOCATION SUITE Federal contract opportunity
- Solicitation number
- FA251721Q9004
About this file
This combined synopsis/solicitation requests quotes for a geolocation suite to meet the specifications in the Statement of Work attachment. The 16th Space Control Squadron at Peterson Air Force Base in Colorado Springs seeks to procure a two-satellite system capable of processing signals in UHF, C, X, Ku, and Ka bands with better than 5km error ellipses at 95% confidence. Quotes are due by September 27, 2021 at 10:00 AM Mountain Time. The technical evaluation will assess compliance with requirements for physical dimensions, weight, RF inputs, bandwidth and modulation analysis, automatic geolocation, integrated mapping, KML/KMZ export, and maintenance support. Delivery within 180 days of providing the mobile server rack is required, along with one week of on-site installation assistance at Peterson AFB.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 3 Questions and Answers.pdf | ||
| FA2517-21-Q-9004 Geolocation Suite 16SPCS_Amend1.pdf | ||
| FA2517-21-Q-9004 Geolocation Suite 16SPCS final.pdf | ||
| Attachment 1 Geolocation SOW.pdf | ||
| Attachment 2 Covered Electronics Reps and Certs Fill in.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Amendment 1
For
MACE
28 August 2021 Revised 9/24/2021
1.0 Introduction
The 16th SPCS utilized two satellite geolocation systems to characterize and geolocate electro magnetic interference world wide.
1.1 Purpose
The 16th SPCS requires a two satellite geolocation system for EMI resolution in UHF, C, X, Ku and Ka bands. The system will be installed into a 14u mobile server rack and tested by the manufacturer before delivery to the 16th SPCS for integration and operations testing at Peterson
AFB, CO.
1.2 Scope
The Contractor shall procure and deliver a two satellite geolocation system. The system will be installed into a provided 14U mobile server rack and tested for proper operation. Additionally, the Contractor shall provide 4 days of onsite installation support.
1.3 Technical Requirements
The Contractor shall ensure the geolocation systems meet the following criteria:
1.3.1 Physical Requirements
1.3.1.1 The geolocation system shall not exceed a total of 14 rack units (RU) in height, 19” width, 28” depth. The system shall be split into two 7 RU or one 14RU case.
1.3.1.2 The geolocation system shall weigh no more than 230250 lbs.
1.3.1.3 The geolocation system shall support N-type RF inputs from two UHF and 7 SHF antennas.
1.3.2 Operational Requirements
1.3.2.1 Provide two-satellite geolocation capability with ability to process UHF, C, X and Ku bands ingested into the system at UHF or L-band with a minimum G/T of 25dB.
1.3.2.2 System shall provide better than 5km error ellipses at a minimum of 95% confidence for a well-defined geolocation scenario.
1.3.2.3 The system shall support us of real-time removal of blocking carriers such that it has negligible impact on the time of a measurement.
1.3.2.4 System shall provide the ability to analyze signal information including center frequency, bandwidth, modulation type, carrier standard and EsNo
1.3.2.5 System shall provide automatic geolocation operation utilizing operator designated threashholds.
1.3.2.6 System shall provide an integrated world-wide, street-level map display for defining and controlling the geolocation scenario and the displaying of results while the system is not connected to the internet.
1.3.2.7 System shall be able to export user-selectable results and scenario information to KML or KMZ file format.
1.3.2.8 System shall provide the ability to ingest a variety of satellite location files.
1.3.2.9 System shall provide mouse-only user-driven Spectrum analyzer capability with the ability to define and control the geolocation scenario directly from the analyzer display
1.3.2.10 System shall provide integrated notebook and geolocation result reporting capabilities
1.3.2.11 System shall contain integrated, context-sensitive user guide
1.3.2.12 System shall provide the ability to put the GUI into dark-mode for low-light operations
1.3.2.13 System shall provide simple user feedback in the confidence of a geolocation result
1.3.2.14 System equipment shall operate on 120/220VAC, 50/60Hz power with a maximum power draw of 2300W peak and 700W typical.
1.3.3 System Support
1.3.3.1 Commercial Off The Shelf Operator’s manual
1.3.3.2 Commercial Off The Shelf Maintenance manual to include periodic inspections, installation and removal instructions.
1.3.3.3 One years of full hardware Maintenance and Software support from the date of installation to be renewed annually
1.3.3.4 Software licenses shall be perpetual without need for annual renewal fees.
1.3.3.5 Line Replaceable Unit (LRU) spares, down to the board level, shall be able to be removed and replaced at remote sites by Government personnel
1.3.3.6 One week of on-site installation support at Peterson AFB, CO
2.0 Deliverables
Delivery of system shall take no longer than 180 days assuming gonverment provides mobile server rack no later than 45 days prior to delivery. Contractor is responsible for system integration into installation and testing prior to full system integration. Contractor will provide manuals for 16th SPCS members.
File details come from the government source that posted it. Updated .