DRAFT_Attach_4,_Scenario.docx
DOCX document 20 KB Posted
- Attached to
- JPPSO Request for Proposal Federal contract opportunity
- Solicitation number
- FA2517-18-R-6000
About this file
Draft Attachment 4 - Scenario
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| JPPSO_FA251718R6000_AMD_01.docx | DOCX document | |
| Attach_3,_CDRLs.pdf | ||
| Exhibit_A_Pricing_Schedule.xls | XLS spreadsheet | |
| Attach_4,_Scenario.docx | DOCX document | |
| Attach_2,_Basic_Insurance_Compliance.doc | DOC document | |
| FA251718R6000_FINAL.docx | DOCX document | |
| Attach_1,_Performance_Work_Statement_11_Jan_18.docx | DOCX document | |
| DRAFT_Attach_1,_Performance_Work_Statement.pdf | ||
| DRAFT_Exhibit_A_Pricing_Schedule.xls | XLS spreadsheet | |
| DRAFT_Attach_3,_CDRLs.pdf | ||
| DRAFT_Attach_2,_Basic_Insurance_Compliance.doc | DOC document | |
| DRAFT_Request_for_Proposals.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Source Selection Information -- See FAR 2.101 and 3.104 – FOR OFFICIAL USE ONLY
SCENARIO RESPONSE
JPPSO TECH EVALUATION
INSTRUCTIONS:
1. The response shall demonstrate a sound strategy that demonstrates the Offeror’s understanding and ability to acquire, direct, and manage personnel, equipment and material/supplies, and processes to perform the required scenario (Limitation of 10 pages)
2. Do NOT include pricing in your narrative. Only pricing provided on Exhibit A, Pricing Schedule will be considered
3. Your response will not be compared to or ranked in any way against the responses of other offerors, but will be assessed only as to whether it demonstrates your company’s understanding of, and ability to fulfill, the requirements outlined in Attachment 1, Performance Work Statement SCENARIO: Ten (10) individuals with 250-400 pounds of Outbound Household Goods (HHG) each require packing and loading on the same day from three different locations on Peterson Air Force Base, CO. Describe your company’s approach to successfully complete this effort, including:
1. Ability to staff, direct, and manage required personnel
2. Ability to obtain the equipment and material/supplies necessary
3. Understanding of timeline and process steps during pre-move: scheduling, pre-move survey, and customer contact
4. Understanding of timeline and process steps during the move: preparation, packing, labeling, loading and containerization
5. Understanding of timeline and process steps after the move for storage and CDRL reports related to these specific moves
Source Selection Information -- See FAR 2.101 and 3.104 – FOR OFFICIAL USE ONLY
File details come from the government source that posted it.