About this file

This notice requests questions from potential vendors concerning a draft request for proposal for conducting a course of action study for the GAME Advanced Munitions Expansion at Eglin Air Force Base. The study must meet or exceed all requirements outlined in the draft RFP. Interested parties should submit any questions regarding the draft RFP by 11:00 AM Central Time on March 29, 2023 to the identified contracting officer and contract specialist. No proposals are being accepted at this time, and the decision to solicit a contract remains at the discretion of the government. Attachments include the draft submittal instructions, statement of objectives, and white paper/statement of work guide for responding to the anticipated solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to GAME Study, newest first.
File Type Posted
Eglin BAA (FA2487-23-S-B009) (V1).pdf PDF
Attch 2 - Section K (V1).pdf PDF
Attch 5 - Preparation of Cost Volume (V1).pdf PDF
Eglin BAA (FA2487-23-S-C009) (V1).pdf PDF
Attch 3 - SOW Prep Instructions (V1).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA2487-22-S-B009

Attachment 3

STATEMENT OF WORK (SOW) TEMPLATE

TO BE USED BY CONTRACTORS TO GENERATE AND SUBMIT A PROPOSED SOW IN

RESPONSE TO EAFB-001 BROAD AGENCY ANNOUNCEMENT (BAA) TOPIC

Contractor SOW shall use this structure and address each section.

Contractor shall enter “Not Applicable” in a particular section as needed.

Section 1 - Objective of Project and Measures of Project Success

Section 2 - Scope of Project

Section 3 - Key Project Management Milestones/Events

Section 4 – Key Personnel

- A technical resume of the principal investigator

- Concise technical resumes for the subcontractors

- Identify all U.S. permanent residents to be involved in the project as direct employees, subcontractors, or consultants. Identify all non-U.S. citizens expected to be involved in the project as direct employees, subcontractors, or consultants. For all non-U.S. citizens, in addition to technical resumes, please provide countries of origin, the type of visa or work permit under which they are performing and an explanation of their anticipated level of involvement on this project, as appropriate. Additional information may be requested during negotiations in order to verify the foreign citizen’s eligibility to participate on a contract issued as a result of this announcement. Note: Do not upload information such as Permanent Resident Cards

(Green Cards), birth certificates, Social Security Numbers, or other PII to the DSIP system.

- Status of Key Personnel Security Clearances

Section 5 - SOW Tasks (list each by separate alpha/numeric paragraph) (

- Task Outline

- Deliverables associated with schedule

- Progress Reports

- Final report with SF298

Section 6 – Summary of Asserted Data rights

Section 7 – Related Work

Section 8 - Required Government Furnished Equipment (GFE)

Section 9 - Required Government Furnished Information (GFI) Including Technical Data

Section 10 - Potential Project Risk Factors & Management Regarding Cost, Schedule &

Performance