DRAFT SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRAFT_Attachment_2_-_Technical_Requirements_Document.docx | DOCX document | |
| DRAFT_Attachment_3_-_STRCI_Specification_V1.docx | DOCX document | |
| DRAFT_Combined_Synopsis-Solicitation.docx | DOCX document | |
| DRAFT_Attachment_4_-_Acceptance_Test_Plan.docx | DOCX document | |
| DRAFT_CDRLs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FOR
FY18 SPECTRUM EFFICIENT GROUND RECEIVER (SEGR) ACQUISITION
96 RANSS/RNRI
17 July 2018
Contents
| 1.0 | SCOPE | 3 |
| 1.1 | Background | 3 |
| 2.0 | APPLICABLE DOCUMENTS | 3 |
| 2.1 | Government Standards | 3 |
| 2.2 | Commercial Standards | 4 |
| 2.3 | Availability of Documents | 4 |
| 3.0 | TECHNICAL REQUIREMENTS | 5 |
| 3.1 | Receivers | 5 |
| 3.2 | Testing | 5 |
| 3.2.1 | Production Assurance Testing | 5 |
| 3.2.2 | Acceptance Testing | 5 |
| 3.3 | Operator Manuals and Data | 5 |
| 3.4 | Warranty Repair | 5 |
| 3.5 | Updates | 6 |
| 3.6 | Technical and Engineering Support | 6 |
| 4.0 | DELIVERY TERMS AND CONDITIONS | 6 |
| 4.1 | Deliverables | 6 |
| 4.1.1 | Hardware | 6 |
| 4.1.2 | Software/Data | 6 |
| 4.1.3 | Markings | 6 |
| 4.1.4 | Delivery Address | 7 |
| 4.2 | Inspection | 7 |
| 4.3 | Acceptance | 7 |
1.0 SCOPE
This Statement of Work (SOW) defines the requirements for the performance of Spectrum Efficient Ground Receivers (SEGRs) to be incorporated into the Aeronautical Mobile Telemetry (AMT) system at the Eglin Test and Training Complex (ETTC).
1.1 Background
The Air Force Transition Plan at Eglin AFB requires AMT users to vacate the frequencies between 1755-1780 MHz auctioned for use by Advanced Wireless Services (AWS) in the Federal Communications Commission (FCC) Auction 97.
The existing and effected AMT capability at Eglin AFB consists of three systems:
| 1) test article (weapons/weapon systems/aircraft) transmission systems, |
| 2) terrestrial receiving systems, and |
| 3) ground-based radio frequency (RF) management systems. |
AMT test article transmission systems include a radio transmitter/antennas to transmit real-time mission critical data to the ground receiving system. The AMT transmitters are currently being modified to:
| 1) no longer transmit in the frequencies transitioned for the AWS use, |
| 2) utilize more spectrally efficient modulation and coding techniques to optimize the utilization of the remaining AMT frequencies, and |
| 3) transmit in all of the frequencies recently made available by the National Telecommunications and Information Agency (NTIA) in Report and Order 27 April 2015. |
Ground based telemetry receiving systems must also be modified to be compatible with the new transmitters while also providing isolation from the increasingly crowded RF spectrum adjacent to the remaining AMT spectrum. A necessary receiving station modification is to purchase telemetry receivers which can decode the AMT modified transmitters without sacrificing mission performance.
2.0 APPLICABLE DOCUMENTS
2.1 Government Standards
IRIG 106-15 Telemetry Standards
IRIG 118-12 vol. 2 Test Methods for TM Systems and Sub Systems
IRIG 120-08 Telemetry Systems Radio Frequency Handbook
MIL-STD 461F Requirements for the Control of Electronic Interference Characteristics of Subsystems and Equipment
MIL-STD-810G Environmental Considerations and Testing
MIL-STD-130L DoD Standard Practice Identification Marking of Military Property
NIST SP 800-53 Guide for Applying the Risk Management Framework to Federal Information Systems Federal Information Security Management Act
NISTIR 7622 Supply Chain Risk Management
NIST Special Publication Security and Privacy Controls for Federal Information Systems and 800-52 Revision 4 Organizations
FIPS Pub 200 Minimum Security Requirements for Federal Information and Information Systems
2.2 Commercial Standards
TIA/EIA-232-F Dec 2012 Interface Between Data Terminal Equipment and Data Circuit-Terminating Equipment Employing Serial Binary Data Interchange
TIA/EIA-422-B Sept 2005 Electrical Characteristics of Balanced Voltage Digital Interface Circuits
IEEE Standard 1149.1-2009 IEEE Standard for Reduced-Pin and Enhanced-Functionality Test 10 Feb 2010 Access Port and Boundary-Scan Architecture aka (JTAG)
| IEEE STD 802.3™ - | Carrier Sense Multiple Access with Collision Detection | |
| 28 Dec 2012 | (CSMA/CD) Access Method and Physical Layer Specifications 10/100 Base-T Ethernet |
2.3 Availability of Documents
Note: MIL-STD documents are subject to change. Copies of these standards are available from:
Quick Search http://quicksearch.dla.mil/
215-697-6396 [DSN: 442-6396].
Department of Defense Single Stock Point (DODSSP) Building 4/Section D 700 Robbins Avenue Philadelphia, PA 19111-5094
3.0 TECHNICAL REQUIREMENTS
The contractor shall provide all equipment, labor, tools, materials, and other items necessary to provide SEGRs for the Air Force Test Center (AFTC) Eglin Air Force Base, Florida as defined in this Statement of Work (SOW).
3.1 Receivers
The receiver capabilities shall be in accordance with the SEGR Technical Requirement Document (TRD).
3.2 Testing
Test equipment requirements, relevant Standards citations, test setup procedures and test execution procedures are clearly and systematically laid out in the TRD and Acceptance Test Plan (ATP).
3.2.1 Production Assurance Testing
The contractor shall be responsible for production testing IAW the ATP before delivery. A Production Test Report (PTR) shall be delivered with each unit, documenting compliance with the TRD and the ATP. (CDRL A001). The contractor may use its own or any other qualified inspection and test facilities or services deemed necessary to insure that deliverable articles are in compliance with this specification.
3.2.2 Acceptance Testing
All SEGRs delivered to the Government under this contract shall undergo Acceptance Testing in accordance with TRD and the ATP. The Government or its designated representative will perform the Acceptance Testing with due diligence in order to accept or reject the receiver in a timely manner. No receiver will be accepted without a completed Acceptance Test. If any unit is found to be defective or not in satisfactory condition upon arrival, the Government shall notify the contractor and return the unit to the contractor, at the contractor’s expense, for repair or replacement. The contractor shall provide a replacement unit or a repaired unit within one (1) month from notification of the deficiency.
3.3 Operator Manuals and Data
The contractor shall provide ten (10) additional complete electronic sets (discs) of Operator manuals (CDRL A002) for the FA testing.
3.4 Warranty Repair
The contractor shall provide a one (1) year warranty on the SEGRs starting on the date the Government completes the Acceptance Test. The warranty shall cover parts, labor, and software. SEGRs repaired under warranty shall have a new warranty period of six (6) months or the remainder of the original warranty period whichever is greater. The contractor may propose express warranty terms and condition in excess of those outlined above, but must meet the minium requirements.
3.5 Updates
Non-performance enhancing firmware updates will take place in IAW the TRD at no cost to the Government. The contractor shall provide a version description document (VDD) for all firmware changes (CDRL A003).
3.6 Technical and Engineering Support
The contractor shall provide technical support for all SEGR’s IAW the contractor’s provided warranty agreement.
4.0 DELIVERY TERMS AND CONDITIONS
4.1 Deliverables
Table 1. Schedule of Data to be Delivered
| Support Area |
| Title |
| CDRL # |
| Date Due |
| Description |
| Management |
| Production Test Report (PTR) |
| A001 |
| Upon delivery of each SEGR unit |
| Documents compliance with the ATP, TRD, and SOW. |
| Management |
| Operator Manuals and Data |
| A002 |
| Upon delivery of each SEGR unit |
| A complete set of Operator manuals and data as described in Paragraph 3.3 of the TRD |
| Management |
| Firmware Update Report |
| A003 |
| At occurance of firmware changes |
| A VDD for all firmware changes. |
4.1.1 Hardware
The contractor shall provide receivers and support as specified in the contract. The quantities and configuration of the SEGRs shall be specified in the contract.
4.1.2 Software/Data
All deliverables must meet professional standards and the task descriptions set forth herein. The contractor shall use its own format, but the format is ultimately subject to the approval of the Government. The deliverables specified herein shall be produced in printed and electronic form using media compatible with Government software applications.
4.1.3 Markings
Markings shall include procuring activity basic contract number, supplier's identification number, supplier's part number, supplier's model number, lot number, unit serial number, date of manufacture, and any special handling exceptions (ESD, HAZMAT, etc.).
4.1.4 Delivery Address
The contractor shall provide electronic copies of all data requirements to the Government as specified. When required, a hard copy will be supplied to the following address:
| Department of the Air Force |
| 96 RANSS/RNRI |
| 308 West D Avenue, Ste 203 |
| Eglin AFB, FL 32542 |
All hardware shall be delivered to the following address:
| Department of the Air Force |
| 96 RANSS/RNRI |
| 308 West D Avenue, Ste 203 |
| Eglin AFB, FL 32542 |
| Attn: Tim Hillman |
4.2 Inspection
Deliverables will be inspected by the Government with due diligence, allowing sufficient time to perform and document an Acceptance Test on each SEGR.
4.3 Acceptance
All deliverables shall be submitted in a format mutually agreed upon by the contractor and the Government, and will normally follow standardized guidelines used by Air Force.