CDRLs.pdf

PDF 233 KB Posted

Attached to
Spectrum Efficient Ground Receivers (SEGR) Federal contract opportunity
Solicitation number
FA2487-18-Q-0004
Issued by
Department of the Air Force Materiel Command Test Center

About this file

CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to Spectrum Efficient Ground Receivers (SEGR), newest first.
File Type Posted
Attachment_1_-_SEGR_SOW.docx DOCX document
Attachment_2_-_Technical_Requirements_Document.docx DOCX document
Attachment_3_-_STRCI_Specification_V1.docx DOCX document
Attachment_4_-_Acceptance_Test_Plan.docx DOCX document
Combined_Synopsis-Solicitation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0002 A X

Spectrum Efficient Ground Receiver

A003 Firmware Update Report version Description Document (VDD)

DI-MISC-81807 SOW Para. 3.5 Eglin AFB Contracting AFTC/PZIE

LT

A

Per occurance SEE BLK 16

SEE BLK 16

EAC AFTC/PZIE 1

PM 96 RANSS/RNRI 1

0 2 0

Ref Blk 4: Contractor format is acceptable.

Ref Blk 12, 13: Submittal shall be due with upgrade.

Ref Blk 14: Data items are deemed to be delivered when electronically transmitted to Government server, the Contractor has given notice of delivery to the Government, and the Government has given notice to the Contractor of successful transmittal of said data. This shall be emailed to the Program Manager (PM) upon completion.

Tim Hillman 17 Jul 18

Adrian Mijangos 17 Jul 18

1 2 Adobe Professional 7.0

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0002 A X

Spectrum Efficient Ground Receiver

A002 Operator Manuals and Data O&M Manuals

DI-TMSS-81815 SOW Para. 3.3 Eglin AFB Contracting AFTC/PZIE

LT

A

SEE BLK 16 SEE BLK 16

SEE BLK 16

PM 96 RANSS/RNRI 10

0 10 0

Ref Blk 10, 12, 13: Submittal shall be due with delivery of all units. If units are delivered over a period of time, all manuals must be delivered with the first units delivered.

Ref Blk 14: Data items are deemed to be delivered when electronically transmitted to Government server, the Contractor has given notice of delivery to the Government, and the Government has given notice to the Contractor of successful transmittal of said data. This shall be emailed to the Program Manager (PM) upon completion.

Tim Hillman 17 Jul 18

Adrian Mijangos 17 Jul 18

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0002 A X

Spectrum Efficient Ground Receiver

A001 PRODUCTION TEST REPORT N/A

DI-QCIC-81891 SOW Para. 3.2.1 Eglin AFB Contracting AFTC/PZIE

LT

A

SEE BLK 16 SEE BLK 16

SEE BLK 16

EAC AFTC/PZIE 1

PM 96 RANSS/RNRI 1

0 2 0

Ref Blk 4: The Report will include a completed Compliancy Matrix as provided by the contract. Ensure the report includes the following information for each required receiver feature.

- Pass or Fail (Met or Did Not Meet)

- Test method Used

- Measured Test Result

- Comments as applicable

Ref Blk 10, 12, 13: Submittal for every unit delivered shall be due at time of delivery.

Ref Blk 14: Data items are deemed to be delivered when electronically transmitted to Government server, the Contractor has given notice of delivery to the Government, and the Government has given notice to the Contractor of successful transmittal of said data. This shall be emailed to the Program Manager (PM) upon completion.

Tim Hillman 17 Jul 18

Adrian Mijangos 17 Jul 18

File details come from the government source that posted it.