DD1423_TM8601_DIDS.pdf
PDF 2 MB Posted
- Attached to
- DC Voltage Divider Federal contract opportunity
- Solicitation number
- FA2263-16-Q-0018
About this file
DD 1423 TM86-01 DIDs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PD_Rev2_16E-164A-DC_Voltage_Divider_16_June_15_with_attachment_data_req.doc | DOC document | |
| MLWARR5.doc | DOC document | |
| Schedule_B_164A.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
I 1 Data Item)
Form Approved OMB No. 0704-0188
The pub lic reporting burden for this col lect ion of information Is estimated to aver;age 110 hours per response, including the time for review ing in15truct ions, surching existing data sources, ga ther ing and maintain ing the data needed, and completing and reviewing the collection of inform1tion. Send comments regarding this burd•n est im•t• or any other as pect of this co llection of information, including suggestions for reducinq the burden, to the Department of Defense, Executive Services and Communications Direc to rate {070 4-0 188). Respondents should be aware that notwithst•nding any other provis ion· of law, no person shall be subject to any penalty for fa iling to comply w ith a collection of informat io n if it does not display a currently val id OMB control number . Pleaae do not return yoyr form to the above organintion. Send completed forni to the Government luuing Contr11cti11g Officer tor the Contract/PR No. li•ted in Block E.
A. CONTRACT LINE ITEM NO. C. CATEGORY: B. EXHIBIT
A(FYI 6) TOP - - - TM _ x_ OTHER
D. SYSTEM/ITEM
DC Voltage Divider
IE. CONTRACT/PR NO.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
ADO! Technical Manual Contract Requirements (TMCR) and associated suoolemental data
F. CONTRACTOR
3 . SUBTITLE
8. REQUIRING OFFICE 4 . AUTHORITY fD1t t11 Acquisition Document No.) , 5 . CONTRACT REFERENCE
TM 86-0 IP PD I 6E-164A-DC Atch AFLCMC/WNMEE
7. DO 260 REQ 9. DIST STATEMENT 10. FREOUENCY
NIA
REQUIRED ASREQ
8. APP COOE 11 . AS OF DATE
12. DATE OF FIRST SUBMISSION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Draft NIA ASREQ See Blk 16 Reg Repro
18. REMARKS
BLK 8: The Government has 30 calendar days to review the preliminary draft.
The con tractor has I 0 calendar days after receipt of Government comments to prepare and del iver the final data. Criteria for approval shall meet the Government comments . Reference the contract number in all correspondence. Final approval after first production acceptance.
Blk 12: No later than 60 days after contract award, I copy(ies) of the Draft manual is( are) required on CD/DVD in indexed Portable Document Format (iPDF). Ship to addressee #I listed in BLK 14a. If manuals are available electronically, the file or web link may be sent to kathryn.vaccaro@us.af.mil.
Reference contract number in all correspondence.
Blk 13 : No later than 30 days after first production is accepted, I copy of the final manual is required. Manual shall be on CD/DVD in indexed Portable Document Format (iPDF). One copy of the manual shall be in an editable format to allow for technical order number assignment. Ship to addressee #1 listed in BLK 14a.
Blk 13 : Concurrent with delivery of production units contractor shall furnish and pack I set of the manuals with each unit. Manual shall be on CD/DVD in indexed Portable Document Format (iPDF) . Ship with unit .
Blk 13 : No later than I 80 days after contract award, concurrent with delivery of first production units, the contractor shall furnish and pack I set of manuals with each of the first production units. Manuals shall be on CD/DVD in Indexed Portable Document Format (iPDF). Ship with unit.
G. PREPARED BY
vf4,r;~ l?Jj)~
I. AFMETCAL
Attn: Kathryn Vaccaro
81 3 ln-iog·Wid; Drive W Horton Bldg
Heath, Ohio 43056
"Same as abovc 11
Ship with unit
Ship with unit 3
)!!:'\TOTAL 5 0
J . DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. ~ y Pa°!)e __ of__ Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA Rt.OUIREMENTS LIST Form Approved (2 Data Items) OMB No. 0704-0188
The public reponing burden for th is co llection of information is estimated to average 220 hours per responst, including the time for reviewing instructions, searcti ing exist ing data sources, gatl'lering and mainta ining the data naadad , and completing and reviewing the collection of information . Send comment s regarding th is burden estimate or 1ny other aspect of this collection of information, including suggestions for reducing tl'le burden, to the Department of Defense , Executive Servic.:is and Communic at ions Directorate (0704·0188 ). Respondents should be aw are that notwithstanding any other provision of law, no person shall be subject to any penal ty for failing to comply with a collect ion of information if it does not display 11 currently valid OMB control number. Ple•M de not return your form to the ebove organiution. Send completed form to the Government lsauing Contr11ctlng Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO . B. EXHIBIT C. CATEGORY:
A(FY16) TOP ™-
){ OTHER
D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
DC Voltage Divider
1. DATA ITEM NO. 2 . TITLE OF DATA ITEM 3. SUBTITLE
A002 Acceptance Test Plan
4. AUTHORITY (Data Acquisition Document No .) 16. CONTRACT REFERENCE 6 . REQUIRING OFFICE
DI-QCIC-80553A PD 16E-164A-DC Atch AFLCMC/WNMEE
7. DD 260 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA REQUIRED
ASREQ See Blk 16 b. CO PIES
8. APP CODE 11 . AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
NIA ASREQ SUBMl§~g'B lk 16 Draft Reg Rapro
16. REMARKS
60 l . AFMETCAL
BLK 12: No later than i3 days after contract award 1 copy of the acceptance test Attn: Kathryn Vaccaro 1 plan is required. Test plan shall be on CD/DVD in Indexed Portable Document 81 3 lrvina-Wick Dr. W. Horton Bl&
Format (iPDF). Ship to addressee #1 listed in BLK 14a. Heath, Ohio 43056
15. TOTAL 0 1 0
1. DATA ITEM NO. 2 . TITLE OF DATA ITEM 3. SUBTITLE
A003 Calibration Certificate
4 . AUTHORITY (Os ts Acquisition Document No .I , 6 . CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-807988 PD 16E-164A-DC Atch AFLCMC/WNMEE
7. DD 260 REQ 9 . DIST STATEMENT 10. FREQUENCY 12. DA TE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED
ASREQ See Blk 16 b. COPIES
B. APP CODE D 11 . ASOFDATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
ASREQ
SUBMISSION Draft NIA See Blk 16 Reg Re pro
16. REMARKS
BLK 12: Concurrent with the delivery of production units contractor shall furnish Ship with unit 4 and pack one ( 1) calibration certificate with the unit.
/1 ' "-5. TOTAL 0 4 0
G. PREPARED BY H. DATE
1.~~BY~A
J. DATE
;;.;.] f .A ~~ lo /J-11 !;- ~..z. Ocf/:J IJ«,frf f DD FORM 1423-2, AUG 96 PREVIOUS EDITION MAY BE USW. - - Page __ of _ _ Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA Rt:OUIREMENTS LIST Form Approved 12 Data Items) OMB No. 0704-0188
The public reporting burd&n for thi s collection of information is estimated to average 220 hours per respons1 , inclu ding the time for rev iewing instructions, searching ex isting data sources , gathering and maint aining the data needed , and completing and re viewing t he collection of informat ion . Send comments regarding this burden estimate or any other aspect of this co llection of informat ion, including suggestions for reduc ing the burden , t o the Department of Defense, Executive Services and Communications Directorate (0 704-0 188). Respondents should be aware that notwith standing any other provision of law , no person sha ll be subject to any penalty for failing to comply w ith a co ll ection of informat ion if il does no1 display a currently val id OMB control number. Pl11 ase do not return your form to the above organization . Send completed form to the Government IHuing Contracting Officer for the Contract/PR No. li1ted in Block E.
A . CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B(FY17) TOP TM
)C OTHER - - - ---
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
DC Voltage Divider
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
BOO! Technical Manual Contract Requirements (TMCR)
4 . AUTHORITY (Data Acquisition Document No .) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE TM 86-01 P PD 16E- l 64A-DC Atch AFLCMCIWNMEE
7. DD 250 REQ 9 . DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA REQUIRED
ASREQ See Blk 16 b . COPIES 8 . APP CODE 11 . AS OF DATE 13. DATE OF SUBSEQUENT a . ADDRESSEE Final
NIA ASREQ SUBM~~g'il!k 16 Draft Reg Repro
16. REMARKS
Blk 12&13: Concurrent with delivery of production units, the contractor shall furnish and pack 1 set of manuals with each unit. Manuals shall be on CD/DVD in Ship with unit 24 Indexed Portable Document Format (iPDF). Ship with unit.
The listed number of copies is the maximum amount for the acquisition. Specific quantities will be identified by issuance of a modification to exercise option quantities .
15. TOTAL 0 24 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
B002 Calibration Certificate
4. AUTHORITY (Data Acquisi tion Document No .) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-807988 PD 16E-164A-DC Atch AFLCMCIWNMEE
7. DD 250 REQ 9 . DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14, DISTRIBUTION REQUIRED
NIA ASREQ See Blk 16 b . COPIES 8 , APP CODE 11 . AS OF DATE 13. DATE OF SUBSEQUENT a . ADDRESSEE Final
SUBMISSION Dratt NIA ASREQ See Blk 16 Rag Repro
16. REMARKS
BLK 12: Concurrent with the delivery of production units contractor shall furnish Ship with unit 24 and pack one (1) calibration certificate with each unit.
The listed number of copies is the maximum amount for the acquisition. Specific quantities will be identified by issuance of a modification to exercise option quantities .
/'\ ,, J6 , TOTAL 0 24 0
G. PREPARED BY H. DATE
l.z~~-B~-(~
J . DATE
k 1 _ A
OJ~f!r./ lo!J-//lr;: ;;:i.ocf /.) 7y~rr
DD FORM 1ZJ~~-2. AUG 96 PREVIOUS EDITION MAY BE USEllV Page __ of __Pages
1.
I
I I
I
1 17. PRICE GROUP
l ~...--t I
1B. ESTIMATED
TOTAL PRICE
I ,._____.
I I I I I
I I I 1 "1"'1-. P"'R"'1c"'E,..G"'R"'D"'u"'P ...
I 1B.' ESTIMATED
TOTAL PRICE
I
I
I
I
I
I
I I I I I I
CONTRACT DAT A Rt:OUIREMENTS LIST Form Approved
The public repon ing burden for th is ~o ll action of information is est imated to average 220 tiours per response, including the time for rev iawing instruct ions, searching exist ing data sou rces , gathering and maintaining the data n&11ded , and c:omp l&t lng and reviewing t l"l a collec tion of informat ion . Send comments regarding this burden estimat e or any other aspect of this collection of information, including suggestions for reducing the burden , t o the Depanment of Defense, Executive Services and Communicat ions Direc torate (0704-0188) . Respondents should be aware that notwithstanding any other provision of law , no person sha ll be subject to any penalty for failing to comply wi th a collect ion of information if it does not display a curren1ly valid OMB conuol numbar . Please do not return your form to the above organization . Send completed form to the Government Issuing Con1recting Officer for the Contract /PR No . listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
C(FYl8) TOP TM " OTHER --- ---
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
DC Voltage Divider
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
COOi Technical Manual Contract Requirements (TMCR)
4 . AUTHORITY (Data Acquisition Document No. ) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE TM 86-01 P PD 16E-164A-DC Atch AFLCMC/WNMEE
7. 00 250 REQ 9 . DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA REQUIRED
ASREQ See Blk 16 b . CO PIES
8. APP CODE 11 . AS OF DATE 13. DATE OF SUBSEQUENT a . ADDRESSEE Final
NIA ASREQ SUBM~~g'i:JJk 16 Draft Reg Repro
16. REMARKS
Blk 12&13: Concurrent with delivery of production units, the contractor shall furnish and pack l set of manuals with each unit. Manuals shall be on CD/DVD in Ship with unit 25 Indexed Portable Document Format (iPDF). Ship with unit.
The listed number of copies is the maximum amount for the acquisition . Specific quantities will be identified by issuance of a modification to exercise option quantities.
15. TOTAL 0 25 0
1. DATA ITEM NO. 2 . TITLE OF DATA ITEM 3. SUBTITLE
c;oo2 Calibration Certificate
4 . AUTHORITY (Dara Acquisition Documenr No .) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-80798B PD 13E-164A-DC Atch AFLCMC/WNMEE
7. OD 250 REO 9 . DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED
ASREQ See Blk 16 b . COPIES
8. APP CODE 11 . ASOFDATE 13. DATE OF SUBSEQUENT a . ADDRESSEE Final
NIA ASREQ
SUBMISSION
See Blk 16 Draft
Reg Aepro
16. REMARKS
BLK 12: Concurrent with the delivery of production units contractor shall furnish Ship with unit 25 and pack one (1) calibration certificate with each unit.
The listed number of copies is the maximum amount for the acquisition . Specific quantities will be identified by issuance of a modification to exercise option quantities .
/I ... iyrp..J:4L 0 25 0
G. PREPARED BY H. DATE
I. A~!ED BY !/{~ J . DATE
t>A-.1~ ~'11,g-- Jo/)_/ /tr 'Jvr,,,,,_.,.,. .r;z;i. tJ t;f b- DD FORM 142-3l2. AUG 96 PREVIOUS ED!Tit)N MAY BE usw Page __ of __ Pages
I
I
I I I I
I I~
I
I
I
I
I
I I I
I I I I I I
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17 . PRICE GROUP
CONTRACT DAT A Rt:QUIREMENTS LIST Form Approved 12 Data Items) OMB No. 0704-0188
The public report ing burden for th is collect ion of information is estimated to average 220 hours per response, including the time for revtewing .instru.ctions , searching exist ing data sources, gathering and mainta ining the data needed, and completing and reviewing the collection of information . Send comments re~arding t~1s burden est lmat~ or .any other aspect of this co llect ion of information, including suggestions for reducing the bu rden , to the Department of Defense, Executrve Services .a.nd Commun1ca1_1 ons Directorat e (0704-0188). Respondents should be aware that notwithstanding any other provision of law , no person shall be subject t o any penalty for fa iling to comply with a collect ion of informat ion if it does not d isp lily a currently valid OMB control number . Pla11e do not retum your form to the above organization. Send completed form to th• Government luuing Contracting Officer for the Contract/PR No . listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
D(FYl9) TOP TM " OTHER -
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
DC Voltage Divider
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3 . SUBTITLE
DOOi Technical Manual Contract Requirements (TMCR)
4 . AUTHORITY fData Acquisition Document No .} 15. CONTRACT REFERENCE 6. REQUIRING OFFICE TM 86-0l P PD 16E-164A-DC Atch AFLCMC/WNMEE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION REQUIRED NIA ASREQ See Blk 16 b. COPIES 8 . APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a . ADDRESSEE Final
NIA ASREQ SUBM~~g131k 16 Draft Reg Repro
16. REMARKS
Blk 12&13 : Concurrent with delivery of production units, the contractor shall furnish and pack I set of manuals with each unit. Manuals shall be on CD/DVD in Ship with unit 18 Indexed Portable Document Format (iPDF). Ship with unit.
The listed number of copies is the maximum amount for the acquisition. Specific quantities will be identified by issuance of a modification to exercise option quantities .
15. TOTAL 0 18 0
1. DATA ITEM NO. 2 . TITLE OF DATA ITEM 3. SUBTITLE
D002 Calibration Certificate
4 . AUTHORITY {Data Acquisition Document No .} , 5 . CONTRACT REFERENCE 6 . REQUIRING OFFICE
DI-QCIC-807988 PD 16E-164A-DC Atch AFLCMC/WNMEE
7. DD 250 REO 9 . DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION REQUIRED
NIA ASREQ See Blk 16 b . COPIES 8 . APP CODE 11 . AS OF DATE 13. DATE OF SUBSEQUENT a . ADDRESSEE Final
NIA
SUBMISSION Or ah
ASREQ See Blk 16 Reg Repro
16. REMARKS
BLK 12: Concurrent with the delivery of production units contractor shall furnish Ship with unit 18 and pack one (I) calibration certificate with each unit.
The listed number of copies is the maximum amount for the acquisition. Specific quantities will be identified by issuance of a modification to exercise option quantities.
/} .J '1) . TOTAL 0 18 0
G. PREPARED BY H. DATE
I. YrlVED BY if a J. DATE
~?A~ I.at U I I Ji ;le) CJ G /-/ _> A_ - ._,....., DD FORM 1 'RZ3-2, AUG 96 PREVIOUS EDITION MAY BEU~ .. ( Page __ of __Pages
I
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST Form Approved
The publlc roponing burden for .this collection of information is estimated to average 220 hours per. response, includin g the time for rev iewing instructions, searching exist ing I data sources, gathering and mainta ining the data needed, and completing and reviewing the collection of information. Send commen1s regarding this burden estimate or any
I other aspect of this collection of information, inclu ding suggestions for reducing tlie burden, to the Department of Defense . Executive Services and Communications Directorate (0704-018 8) . Respondents should be aware that notwithstanding any other provision of taw, no person shall be subject to any penalty for faili ng to comply with a collection of information if it does not display a currently valid OMB control number . Pleete do not return your form to the above orgenization . Send completed form to the Government Issuing Contracting Officer for the Contract/PR No . listed in Block E.
I A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
E(FY20) TOP TM " OTHER -
I D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR
DC Voltage Divider
.1 1. DATA ITEM NO. 2 . TITLE OF DATA ITEM 3 . SUBTITLE
EOOI Technical Manual Contract Requirements (TMCR)
I 4 . AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
I TM 86-01 P PD 16E-164A-DC Atch AFLCMCIWNMEE
7. DD 250 REQ 9 . DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
I NIA REQUIRED
ASREQ See Blk 16 b. COPIES
8. APP CODE 11 . AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
I NIA ASREQ . SUBMis~g'hlk 16 Draft Reg Repro
16. REMARKS
I Blk 12&13: Concurrent with delivery of production units, the contractor shall furnish and pack 1 set of manuals with each unit. Manuals shall be on CD/DVD in Ship with unit 20 I Indexed Portable Document Format (iPDF). Ship with unit.
The listed number of copies is the maximum amount for the acquisition. Specific I quantities will be identified by issuance of a modification to exercise option
I quantities .
I
I
I
15. TOTAL 0 20 0 I
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3 . SUBTITLE
I E002 Calibration Certificate
I 4. AUTHORITY (Data Acquisition Document No.) 15. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-80798B PD 16E-164A-DC Atch AFLCMCIWNMEE I 7. DD 250 REQ 9 . DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NIA
REQUIRED
ASREQ SeeBlkl6 I b , COPIES
8. APP CODE 11. AS OF DATE 13 . DATE OF SUBSEQUENT a . ADDRESSEE Final SUBMISSION Draft
I NIA ASREQ See Blk 16 Reg Repro
16. REMARKS
BLK 12: Concurrent with the delivery of production units contractor shall furnish Ship wilh unit 20 I and pack one (I) calibration certificate with each unit.
The listed number of copies is the maximum amount for the acquisition. Specific I quantities will be identified by issuance of a modification to exercise option
I quantities.
I
I
I
I /l I )6'.Toi:11L 0 20 0 ~
G. PREPARED BY H. DATE
I.Aw~
J . DATE
~ 'a.A Lo I J..-1 /J ~- ~~ ()c,, f /-5 I /.A 11/llW
DD FORM 1423-2. AUG 96 PREVIOUS EDITION MAY BE USED/ Page -- of Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18 . ESTIMATED
TM-86-0lP 9 Dec 201'.
Air Force Technical Manual Contract Requirements (TMCR) for
AIR FORCE CALIBRATION AND METROLOGY (AFMETCAL) PROGRAM
DC Voltage Divider
ATTACHMENT DD FORM 1423, TO CORL SEQUENCE NUMBER 001, EXHIBIT A REQUEST FOR
PROPOSAL/CONTRACT:
Date: 20 October 2015 Technical Manual/Technical Order requirements contained herein have been cleared for use by OMB Paperwork Reduction Project No .
0704-0188.
SECTION 1. TECHNICAL ORDER (TO) PROGRAM REQUIREMENTS
1. TMCR Tailoring. (T) This TMCR has been tailored by the program office, including the associated tables, matrices and Specification/Standard Interface Records (SIRs). The Contractor may propose and submit, in writing additional tailoring to the Procuring Contracting Officer (PCO) for consideration. The tailored TMCR shall be attached to the CDRL for TO delivery, and shall be included in the proposal as a separate exhibit, referenced in the proposal SOW. Proposals shall be compatible with the AFMETCALTechnical Order Concept of Operations. Air Force TO Acquisition procedures, including procedures for tailoring this document, are found in TO 00-5-3, AF Technical Order Life Cycle Man agement, located on the Internet at http://www.tinker.af.mil/technicalorders/index.asp. A copy may also be obtained from the Program TO Manager. Any terms or procedures found in this document may be researched there.
2. TO Program Scope. (Deleted)
3. Commercial Manuals. (T) Contractors shall recommend the use of existing commercial manuals to the maximum extent possible without impairing program support objectives. All proposed commercial manuals are subject to government review and approval.
NOTE: Government activities will use MIL-PRF-32216, Evaluation of Commercial Off-The-Shelf (COTS) Manuals and Preparation of Supplemental Data, as a guide for review and acceptance of all recommended commercial manuals.
3 .1. All commercial manuals shall be delivered with either unlimited data rights or as a minimum, Government Purpose License, to allow the AF to electronically store, print, distribute and decollate the commercial manual to allow for printing.
3.2. (T) All PDF files of commercial data shall be non-password protected to allow the AF to decol late the manual for printing.
3 .3 Commercial Manual(s) shall include the following:
a. Operation and Maintenance Instructions
b. Illustrated Parts Breakdown
c. Calibration Process/Procedure
2 TM-86-0lP 9 Dec 14
3.4. If the proposed COTS data is found to be insufficient after review by the government, the con tractor shall prepare supplemental data for the COTS manual as required IA W MIL-STD-38784. If the COTS data cannot be supplemented sufficiently the contractor may be tasked to develop new TM data IA W the applicable TMSS listed in Section 2 Table 1.
4. Technical Manual Specifications and Standards (TMSS) Tailoring. (Delete)
5. Subsequent TO/Data Requirements. (Deleted)
6. TO Development. (T) TOs shall be written to a scope and depth of coverage sufficient to support the AFMETCAL operations and maintenance concepts.
6.1. (Deleted)
6.2. SGML-tagged TO files shall include required illustration (graphics) files in an approved graphics exchange format. Illustration files developed and delivered for other purposes shall be used in lieu of developing special TM illustration files whenever possible. All delivered graphics shall conform to the approved graphic creation and format guidelines listed in attachment 1. For assis tance with illustration requirements contact AFLCMC/HIAM via (e-mail : SGMLSup port@us.af.mil).
6.3 . Page-oriented Military Specification (MILSPEC) TOs shall be formatted with text, graphics and delivered according to the TMSS specified in Section 2. The contractor shall develop TO files (tagged instances) using Standard Generalized Markup Language (SGML) according to the DTDs referenced in the appendix to MIL-STD-38784 and each applicable military detail specification (MIL-DTL). Multiple SGML file instances for a single T.O. document are not authorized.
7. TO Numbering. (Deleted)
8. Data Rights. (T) Contractors shall provide Unlimited Rights for all source data and TOs prepared specifically for the contract. Government rights in data are specified in the Defense Federal Acquisition Regulation Supplement (DFARS), 252.227-7013, Rights in Technical Data, Noncommercial Items, 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, and 252.227-7015 , Technical Data-Commercial Items. The government shall be given unlimited rights for all business rules (tailoring and application methods and procedures) and document ed business processes developed for use in TO development. Government data rights shall extend to the common source database, transformation style sheets, and other tools or products used to author or dis play technical data.
9. Classification, Distribution, Destruction, Disclosure, and Export Control Notices. (T) Contractors shall determine the correct markings and controls for classified and restricted distribution data and TOs IAW the program's Security Classification Guide (SCG) and DODM 5200.01, DODI 5230.24, AFI 31- 401, AFI 61-204, and MIL-STD-38784 (available at http://www.e-publishing.af.mil/ or https: //assist.dla.mil/online/start/index.cfm ). NOTE: Distribution limitations will be determined on a case-by-case basis as TOs are developed, dependent upon TO content.
10. TO Quality. (T) The contractors ' shall ensure TOs prepared are: a) technically accurate and safe;
b) written to a scope and depth of coverage sufficient to support the operations and maintenance con cepts, and c) properly classified and marked with export control and distribution limitation statements.
TM-86-0lP 9 Dec 2014
11 . TO Delivery. (T) TO file delivery requirements are located in Section 2 Table 3 of this document.
11 .1. Indexed Adobe™ Portable Document Format CIPDF) Files. The contractor shall validate indexing of PDF TO files.
12. Source Data Maintenance. (Deleted)
13. TO Maintenance. (Deleted)
14. Schedules. (Deleted)
15 . Time Compliance Technical Orders CTCTOs). (Deleted)
4 TM-86-0lP 9 Dec 14
SECTION 2. TM TYPE AND D ELIVERY REQUIREMENTS
NOTES:
• Mark the TM Type Selection Tables indicating the applicable TO types and related specifications.
PART A- (NEW DEVELOPMENT) TM TYPE SELECTION TABLES.
TABLE 1
TMSS REQUIREMENTS FOR THE AFMETCAL
(DC Voltage Divider)
Title or Type of Manuals Specification
I. Inspection TOs MIL-DTL-5096
a. Inspection and Maintenance Requirements (-6) Manual
b. Acceptance and Functional Check Flight (FCF) Procedures (-6CF) Manual
c. Acceptance and Functional Check Flight (-6CL) Checklist
d. Inspection Workcards (-6WC)
e. Maintenance/Operations Checklists
2. Cargo Aircraft Loading and Offloading TOs MIL-DTL-5288
a. Loading Instructions Manual
b. Nuclear Weapon Cargo Loading Manual
c. Checklists
3. Weight and Balance (Aircraft)
a. Loading Data Manual
b. Sample Basic Weight Checklists
4 . Flight Manuals
a. Flight Manual
b. Performance Data Manual
c. Mission Crew Manual
d. Supplemental Manual
e. Abbreviated Flight Crew Checklist
5. List of Applicable Publications
6. Structural Repair Manuals (for Aircraft)
7. Munitions/Weapons Loading Procedures, Non- nuclear and Nuclear TOs
a. Nuclear Weapons Basic Information and Loading Procedures
b. Nuclear Weapons Loading Procedures
c. Non-nuclear Munitions Basic Information
d. Non-nuclear Loading Procedures
e. Non-nuclear Munitions Loading Standard Data Packages (SDPs)
f. Loading Procedures Checklist
g. Single Loading Procedures Checklist
h. Integrated Loading Procedures Checklists
i. Family Group Loading Procedures Checklist j . Nuclear Weapons Loading Procedure Checklists
k. Functional Check Procedures Checklist I. NA TO Stage B Cross-Servicing Check! is ts
m. En~ of Runway (EOR) Procedures Checklist
8. Space Operations and Support Documentation TOs -- MILSPEC (Intercontinental Ballistic Missiles) -- MILSPEC (Space)
MIL-DTL-5920
MIL-DTL-7700
MIL-DTL-8031
MIL-DTL-9854
MIL-DTL-9977
MIL-PRF-38311
MIL-PRF-38314
Required
D
D
D D D
D
D
D D
D D D D D D D
D D D D D D D D D D D D D
D
TM-86-0lP 9 Dec 2014
TABLE 1
TMSS REQUIREMENTS FOR THE AFMETCAL
(DC Voltage Divider)
Title or Type of Manuals Specification
a. Operations Manual
b. Operations Checklists
c. Technical Manuals and Related Checklists -
9. Nuclear and Non-nuclear Weapon Delivery and Aircrew Procedures MIL-DTL-38384 Manuals and Checklists
a. Non-nuclear Weapon Delivery Manual
b. Aircrew Nuclear Bomb Delivery Manual (Strategic Bomber Aircraft)
c. Aircrew Nuclear Missile Delivery Manual (Strategic Bomber Aircraft)
d. Aircrew Nuclear Bomb Delivery Manual (Tactical Aircraft)
e. Non-nuclear Weapon Delivery Checklist
f. Nuclear Weapon Delivery Checklist (Strategic Bomber Aircraft)
g. Aircrew Nuclear Bomb Delivery Checklist (Tactical Aircraft)
h. Non-nuclear 2\'e~_on Delivery Source DE a Packages
I 0. Work Unit Code Manual MIL-DTL-38769
a. Standard WUC Manual
b. Two Chapter Manual c..: Thret;:_ Chapter_Manual
11 . Calibration Procedures
12. Time Compliance Technical Orders (TCTOs)
a. TCTO b: TCTO Supplem:.nt
13. Aircraft Batt~ Damage Assessme~t and Repair TOs
14. Illustrated Parts Breakdown - ~
15. On-Equipment Organizational Maintenance Manual Set
a. General Equipment (GE) Manual
b. General System (GS) Manuals
c. Combined GE & GS Manual
d. Job Guide (JG) Manuals
e. Fault Reporting (FR) Manual
f. Fault Isolation (FI) Manual
g. Wiring Data (WD) Manual
h. Schematic Diagram (SD) Manual
MIL-DTL-38793
MIL-DTL-38804
MIL-DTL-87158
MIL-DTL-38807
MIL-DTL-83495
Required
D D D ---
D D D D D D D
--- D~
D D D [8J
D D D D
D D D D D D
6 TM-86-0lP 9 Dec 14
TABLE 1
TMSS REQUIREMENTS FOR THE AFMETCAL
(DC Voltage Divider)
Title or Type of Manuals
16. Operation and Maintenance Instructions in Work Package Format
a. Maintenance Manuals
(I) Intermediate Maintenance
(2) Depot Maintenance
(3) Combined (l&D) Maintenance
(4) On Condition Maintenance
b. Operation & Maintenance Instruction Manuals
c. Special Manuals
(I) Aircraft Engine Testing and Trending Procedures
(2) Aircraft Power Package Testing Procedures
(3) Static Firing of Missile Motors
(4) System Peculiar Corrosion Control
(5) Nondestructive Inspection (NDI)
(6) Aircraft Structural Integrity Program (ASIP)
(7) A TE Operator Test Procedures
(8) Special Requirements for Storage and Maintenance Procedures;
AUR Munitions/Launchers and Associated Support Equipment, Conventional Components and CMBR Agents
(9) Parachute Packing Procedures
(10) Operators Instructions (Hand-Held Flight Computers)
(11) Installation-Engineering Facility (Ground C-E Equipment)
d. Checklists (IA W MIL-DTL-5096)
e. Wi.th Illustrated Parts Breakdown
17. Commercial Manuals (Evaluate according to MIL-PRF-32216)
18. Aircraft Cross-servicing Guide
19. Technical Publications Utilizing Common Source Database (CSDB)
a. Style Sheets
b. Business Rules Exchange (BREX)
c. Data Module Requirements List (DMRL)
d. Authoring Guides
e. Style Guides
f. Graphics and Textual Contractor Developed Business Rules Document
g. Viewing Guidelines
h. Process Documentation
Specification Required
MIL-DTL-87929
D D D D D
D D D D D D D D
D D D D D
[Z]
MIL-DTL-22202 D
ASD-S I OOOD - D
International Specification for Technical Publications Utilizing a CSDB
MIL-STD-3048
D D D D D D
TM-86-0lP 9 Dec 201"'
NOTES:
TABLE 3 - TM DELIVERY REQUIREMENTS
FOR THE AFMETCAL
DC Voltage Divider
• For Paper media delivery indicate required quantity
• For all other media types indicate (Y)es or (N)o
• TCTO requirements are specified in the contract vehicle approving the TCTO.
DELIVERY SCHEDULE
Event ¢Number of days data required prior Technical First Administrative to event¢ Review(s)(60 Article/First (Logistics) DACA) Production (30 DAFAOK)
Unit (180
DACA)
,JJ Physical mailing address, electronic Legend: DACA - After Contract Award
Final TO Distribution (Ship With Prod Units)
(120
DAFAOK)
delivery location or web access point ,JJ OAF AOK - Days after First A1ticle accepted (passes Acceptance testing)
Engineering (Draft) Copy !PDF I I !PDF I !PDF I !PDF I AFLCMC/WNMRP/ AFMETCAL Division ATTN: Kathy Vaccaro kathryn. vaccaro@ us.af. mil 813 Irving Wick Drive West, Bldg 2 Heath, Ohio 43056 First Production Copies (ship w/l st Prod .) !PDF I !PDF I 3 !PDF I !PDF I Bionetics Transportation ATNN: Carol Cooperrider 813 Irving Wick Drive West, Bldg 4, Door 15 Heath, Ohio 43056 Administrative (Logistics) Copies !PDF I !PDF I !PDF I I !PDF I AFLCMC/WNMRP/ AFMETCAL Division ATTN: Kathy Vaccaro kathryn. vaccaro@ us .af.mil 813 Irving Wick Drive West, Bldg 2 Heath, Ohio 43056 Final (Production) Copies (ship w/ unit) IPDF I !PDF I !PDF I !PDF I 88 Bionetics Transportation A TNN: Carol Cooperrider 813 Irving Wick Drive West, Bldg 4, Door 15 Heath, Ohio 43056
Total Paper Copies Required: I 3 I 88
SECTION 3. D ELETED
DAT A ITEM DESCRIPTION
Title: CALIBRATION CERTIFICATE
Number: DI-QCIC-80798B AMSC Number: F7554 DTIC Applicable:
Preparing Activity: AFMETCAL DET l/MLE Applicable Forms: None Use, Relationships:
Approval Date: 20050328 Limitation:
GIDEP Applicable:
This Data Item Description (DID) contains the format and content requirements for calibration reports or certificates accompanying calibrations performed on DoD test, measurement, and diagnostic equipment.
This DID is applicable to contracts requiring calibration of test equipment prior to delivery. This DID is consistent with ISO 17025 requirements for calibration reports or certificate.
This DID supersedes DI-QCIC-80798A.
Requirements:
1. Format. Contractor format is acceptable-.
2. Content. The calibration certificate or report shall include:
a. title (e.g., calibration report or calibration certificate);
b. the name and address of the laboratory, and the location where the calibrations were carried out, if different from the address of the laboratory;
c. unique identification of the test report or calibration certificate (such as the serial number), and on each page an identification in order to ensure that the page is recognized as a part of the test report or calibration certificate, and a clear identification of the end of the test report or calibration certificate;
d. the name and address of the client or customer;
e. identification of the method used;
f. a description of, the condition of, and unambiguous identification of the item(s) tested or calibrated;
g. the date ofreceipt of the test or calibration item(s) where this is critical to the validity and application of the results, and the date(s) of performance of the test or calibration;
DI-QCIC-80798B
h. reference to the sampling plan and procedures used by the laboratory or other bodies where these are relevant to the validity or application of the results;
1. the test or calibration results with, where appropriate, the units of measurement;
j . the name( s ), function( s) and signature( s) or equivalent identification of person( s) authorizing the test report or calibration certificate;
k. where relevant, a statement to the effect that the results relate only to the items tested or calibrated;
1. the conditions (e.g. environmental) under which the calibrations were made that have an influence on the measurement results;
m. the uncertainty of measurement or a statement of compliance with an identified metrological specification or clauses thereof;
n. evidence that the measurements are traceable.
End of DI-QCIC-80798B
DAT A ITEM DESCRIPTION
Title: Acceptance Test Plan
Number: DI-QCIC-80553A AMSC Number: 7641 DTIC Applicable: No Office of Primary Responsibility: NSIDA02 Applicable Forms: NIA
Approval Date: 14 Nov 2006 Limitation: NIA GIDEP Applicable: No
Use/relationship: The Acceptance Test Plan details the criteria, performance objectives and 1 ist of tests to be performed by the contractor for acceptance tests on systems and equipments.
This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
This DID is applicable to contracts requiring preparation of an acceptance test.
This DID supersede Dl-QCIC-80553 .
Requirements:
1. Reference documents. None.
2. Format. The plan shall be in contractor' s format.
3. Contents . The plan shall contain the following:
3 .1 Overview. Consists of a brief description of the objectives of the acceptance test plan, including flow diagrams, milestones, personnel participation, and security requirements. This section shall include the following:
3.1.1 Flow diagram. A functional description of the acceptance test program using a block diagram portrayal of the functions that must be met to satisfy the total acceptance program. Functions shall be numbered 1.0, 2.0, 3.0, etc . . .
3.1.2 Milestones. Identifies the start and expected completion dates of each test to be performed.
3.1.3 Participation. Identifies the Government and Contractor participation roles and responsibilities.
DI-QCIC-80553A
3.1.4 Security. Identify and state briefly any security measures of guidelines to be observed.
3.2 Master test list. Lists all test to be accomplished in the order they are to be performed. Separated listings for each location shall be provided. This listings shall be include the following:
3.3 Facility. Location where the acceptance test is to be performed.
3.4 Item number. Number for each piece of equipment or item, test will be performed.
3.5 Test description. Name and brief description of test to be performed.
3.6 Parameters. The number of cycles the test will be performed and selected parameters to be observed.
3.7 Equipment location. Current location of equipment to be tested or used in the acceptance test.
3.8 Special tests. Provides a list of special or unusual tests and examinations necessary to verify satisfactory equipment performance to specifications.
4. Equipment list. The equipment list shall list all equipment to be used in the acceptance test. The listing shall include the following:
4.1 Test equipment. List all test equipment by:
a. Description.
b. Nomenclature.
c. Serial number.
4.2 Support equipment. List all support equipment by .
a. Description.
b. Nomenclature.
c. Serial number.
4.3 Special test equipment. List all special test equipment required to be designed or constructed for use on the program by:
a. Description.
b. Nomenclature.
c. Date required.
5. Validation procedure. An overview of the procedures that the contractor will use to validate the test results .
6. END OF DI-QCIC-80553A
File details come from the government source that posted it. Updated .