FA_5998015810426AH.pdf
PDF 91 KB Posted
- Attached to
- ESCTS Circuit Cards Federal contract opportunity
- Solicitation number
- FA820623Q0033
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA_5998015816927AH.pdf | ||
| IUID_5998015847148AH.pdf | ||
| IUID_5998015816927AH.pdf | ||
| EDL_EXELIS INC..pdf | ||
| EDL_EDO CORPORATION.pdf | ||
| Unmarked_Eng_Data_2022.pdf | ||
| Transportation.pdf | ||
| FA_5998015847148AH.pdf | ||
| Data_Package.docx | DOCX document | |
| SOW.pdf | ||
| Packaging.pdf | ||
| FA820623Q0033.pdf | ||
| CDRL_FA_Test_Report.pdf | ||
| 807_5998015816927AH.pdf | ||
| 807_5998015847148AH.pdf | ||
| 807_5998015810426AH.pdf | ||
| BIDSET.pdf | ||
| IUID_5998015810426AH.pdf | ||
| EDL_NORTHROP GRUMMAN SYSTEMS.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
23 SEP 2021(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
68267 / ESCTS1310-1
4. NSN
5998015810426AH
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM each
AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
REQUIRED X NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
REQUIRED X NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A.
X
CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
In accordance with drawing ESCTS1310 and all sub tier documents.
B. The detailed technical requirements for First Article approval tests are contained in
Drawing ESCTS1310 and all sub tier documents.
(Cite Spec and Para number)
C. TEST PLAN REQUIRED
Number of days for government approval / disapproval days.
D. Contractor's notification to ACO and
(Requesting Activity) of test time and location due days prior to start of testing.
E. X TEST REPORT REQUIRED
(1) Forwarded to eddie.diehl@us.af.mil nathan.rieske@us.af.mil
(2) Government written notice of approval / disapproval due 120 days after receipt of contractor's report.
F. FIRST ARTICLE DELIVERY
(1) Due within 120 calendar days from date contract.
(2) Notify 30 calendar days prior to shipment.
(3) Delivered to government at
809 MXSS/MXDEB (DODAC:FB2029)
Bldg 849, Attn: Non-Accountable Bay
Mark for: First Article Do Not Post
Hill AFB, UT 84056-5713
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 120 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$1,500.0000
Page 1 of 2AFMC IMT 260, 20020830, V-3 Version 3Generated by PRPS using Jasper Reports on 14 Dec 2022
FIRST ARTICLE REQUIREMENTS 1. DATE
23 SEP 2021(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
10. DISPOSITION OF FIRST ARTICLES
X Approved First Articles will be forwarded to
Supply
(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
X Disapproved First Articles will be returned to the contractor
X will be retained by FAI Lab pending disposition instructions from the contractor.
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
Other Disposition:
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.
b. X Offerors currently in production of the same or similar article for a X Government, DoD, Air Force contract and who have received First Article approval under the existing contract.
c. X Offerors who have previously furnished production quantities of the same or similar articles to the X Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 36 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. X See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
12. REMARKS
Diehl, Eddie LNAME: 23 SEP 2021DATE:
Supplier's first article Amps Meter circuit card will be tested for proper function by a technician within a proper functioning ESCTS test set at Hill AFB, Utah, building 100 bay L. Supplier will contact applicable USAF contracts officer and they in turn will contact 414 SCMS GUEA engineering and/or propulsion support logistics management specialist to set up the bay L testing date/time for this first article circuit card function verification test. This test verification must be completed and the card must function properly for the first article to be accepted.
Olsen, David ENAME: 07 MAY 2019DATE:
First Article Lab is to leave circuit board in Anti-static Wraping. After successful Completion of the Contractor First Article Testing, Part shall be sent to: Hill AFB FA Lab.
after any necessary tests, FA lab to send part to Building 100 Bay L for Fit/Function Test.
Coordinate with David Olsen (Engineer) (801)775-3236 david.olsen.8@us.af.mil and Joe Jackson (801)777-0598 or Lynn Hansen (801) 430-5834 for Fit/Function Test.
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST
(Name, Organization, Phone)
Diehl, Eddie L.
414 SCMS/GUEA
801-775-3236
775-3236
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Hill AFB First Article Lab, Program Office, POC: Brook Mason
809 MXSS/MXDEB, Building 100 (DODAC:FB2029)