SOW_F3YCEB6103AQ01_8_April_2016.pdf
PDF 22 KB Posted
- Attached to
- BOSS Federal contract opportunity
- Solicitation number
- F3YCEB6103AQ01
About this file
State of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J A_F3YCEB6103AQ01_BOSS_(2).pdf | ||
| RFQ_F3YCEB6103AQ01_BOSS.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
(SOW)
For
Boss and Hardware
8 April 2016
OBWK
Scope:
1. The Contractor shall be responsible for insuring all services, parts and Original Equip-ment Manufacturer (OEM) components provided under this contract conform to the manufacturer’s equipment specifications. The Contractor shall be responsible for installa-tion and checkout of the Battlefield Operations Support System (BOSS) and it’s accesso-ries.
1.2 The Contractor shall provide all Training Documents and/or materialss necessary to per-form the three (3) day onsite training for up to five people from the 558th Software Maintenance Squadron. The training will be held after completion of the Installation and checkout of the system in the Lab located in Room 150 in Building 3220 for the Oklaho-ma City-Air Logistics Complex (OC-ALC).
Item Description:
2. 565th AMXS/MXDPBA requests the purchase and installation of 6th SMXG request the purchase of the following items:
• BOSS (Link 11a and link 16 with training): Multi-link BOSS, Dual Monitor, Doc and Manuals, I&CO
• Product Support Gold. Additional Modules for BOSS: Dis interface.
• Compact PCI (cPCI) Chassis PN: NSN 7025-01-631-6354 /(It should have integrated power and cooling but we need the power input to be either 220V or 110V)
• Condor 1553 PCM Card PN: QPM-1553-2M-W
• ATDS PCM Card PN: SP-12102-02
• GEXCR14 SBC PN: CT11P6C00RF1
Hours of Training:
3. The Contractor shall begin class at approximately 7:00am until 11:00am at which time the class will break for lunch and resume at 12:00pm until 4:00pm.
Vistor’s Pass
4. The Contractor shall contact the COR seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The COR will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall ar-range to meet at Pass and Registration, Building 6611 at the Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.
5. Emergency Procedures:
The Contractor personnel shall follow the direction of the Government personnel with re-gard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or oth-er emergency. It is the responsibility of the Contractor to provide guidance and to estab-lish procedures for its employees to respond to an emergency. It is the Contractor’s re-sponsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tor-nado drills at no additional cost to the Government.
Safety & Health on Government Installations:
6. While performing work under this contract the Contractor shall comply with all applica-ble federal, state and local regulations regarding occupational safety and health. During the execution of the contract, the Contractor shall notify the CO, COR, and Government Contract Administrator (CA) within one (1) business day of any damage to Government property in which the dollar value exceeds $500,000.00 and within two (2) work days, for any damage to Government property less than $500,000.00.
6.1 Mishap notifications shall contain, as a minimum, the following information:
• Contract, Contract Number, Name and Title of Person(s) Reporting
• Date, Time and exact location of accident/incident
• Brief Narrative of accident/incident (Events leading to accident/incident)
• Cause of accident/incident, if known
• Estimated cost of accident/incident (material and labor to repair/replace)
• Nomenclature of equipment and personnel involved in accident/incident
• Corrective actions (taken or proposed)
• Other pertinent information
If requested by the designated CO, the Contractor shall immediately secure the mishap sce-ne/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.
File details come from the government source that posted it. Updated .