Please direct your attention to a revised SOO dated 4 September 2018.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI__1.pdf | ||
| 3._Design_Review.pdf | ||
| BID_SCHEDULE.DOCX | DOCX document | |
| Catwalk_SOO.PDF | ||
| Safety_Requirements.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5 July 2018
Statement of Work
FStatement of Work
INSTALL CATWALKS & ACCESS LADDERS
PART 1 – GENERAL
1.1 STATEMENT OF WORK: This is a general overview of the project:
A. Location: Accomplish work at Robins AFB, Georgia
B. Bid Proposal - Construction Specification Institute (CSI) format shall be used for the purpose of this contract. Required divisions at a minimum include engineering, materials, labor (prime and subcontractor), equipment, bond, G&A, overhead, profit. Contractor bid proposals should include accurate applicable line items, quantities, unit price, total price, and a written, flowable work plan authored in sequence that includes all elements (e.g. materials and labor) required to install a complete system of catwalks and access ladders. It must meet all requirements listed in the Statement of Work (SOW) and contract specifications. All Task Orders (TO) shall be supported by necessary documentation to indicate that adequate engineering and planning to accomplish the requirements specified in the TO SOW and contract specifications. Examples of acceptable documentation include: drawings, calculations, catalog cut sheets, specifications, or architectural renderings.TO proposals will be evaluated on all submitted documentation.
Proposal line items, quantities, documentation, contract specifications, and the TO SOW will become a part of the TO requirements upon award of each TO. All offered betterments will become part of the task order requirements. A "Betterment" is defined as any component, system or quantities that exceed the minimum requirements stated in the SOW. This includes all warranties that traditionally accompany an identified betterment. Evaluation of all work plan elements is on a go/no-go basis. The Government reserves the right to award without discussions.
C. Performance Period:
1. The contractor shall have all submittals submitted and approved within 60 days of Notice to Proceed (NTP). Contractor shall begin work within 90 days of NTP and be completed with project within 150 days of NTP.
D. Project Scope, Objectives and Criteria: Provide all labor, material, design, equipment, supplies, testing, coordination and supervision as follows: All design and attachment shall be performed by a professional engineer. Each catwalk and access ladder shall have 1 coat of primer and 2 finish coats of paint. Color shall be approved by the government. Design basis for each CLIN shall be equal to or better than the following description:
CLIN 1
Quantity – 1 Each
• 3'x11' Observation Catwalk
• Catwalk to have formed Channel at each end to attach to CMU wall and
Structure wall for support.
• Catwalk to have 1-1/2" Sch40/ CS Safety rail surrounding
• Catwalk to have Pultruded Fiberglass Grating
Fiberglass SPF Polyester Resin, MS T-5020 Spacing, Yellow 2" Bearing Bars, Medium Grit Surface Surface, Gray Cross Bars, 6" on Center, 50% Open Area, Panel, Bearing Bars Run Parallel to Length
• 1 each access ladder
CLIN 2
• 3'x13' Observation Catwalk
• Catwalk to have formed Channel at each end to attach to CMU wall and
Structure wall for support.
• Catwalk to have 1-1/2" Sch40/ CS Safety rail surrounding
• Catwalk to have Pultruded Fiberglass Grating
Fiberglass SPF Polyester Resin, MS T-5020 Spacing, Yellow 2" Bearing Bars, Medium Grit Surface Surface, Gray Cross Bars, 6"
CLIN 3
• 4’6”x13' Observation Catwalk
• Catwalk to have formed Channel at each end to attach to CMU wall and
Structure wall for support.
• Catwalk to have 1-1/2" Sch40/ CS Safety rail surrounding
• Catwalk to have Pultruded Fiberglass Grating
Fiberglass SPF Polyester Resin, MS T-5020 Spacing, Yellow 2" Bearing Bars, Medium Grit Surface Surface, Gray Cross Bars, 6"
CLIN 4
• 4’6”'x15' Observation Catwalk
• Catwalk to have formed Channel at each end to attach to CMU wall and
Structure wall for support.
• Catwalk to have 1-1/2" Sch40/ CS Safety rail surrounding
• Catwalk to have Pultruded Fiberglass Grating
Fiberglass SPF Polyester Resin, MS T-5020 Spacing, Yellow 2" Bearing Bars, Medium Grit Surface Surface, Gray Cross Bars, 6"
CLIN 5
• 4'6”x13' Observation Catwalk
• Catwalk to have formed Channel at each end to attach to CMU wall and
Structure wall for support.
• Catwalk to have 1-1/2" Sch40/ CS Safety rail surrounding
• Catwalk to have Pultruded Fiberglass Grating
Fiberglass SPF Polyester Resin, MS T-5020 Spacing, Yellow 2" Bearing Bars, Medium Grit Surface Surface, Gray Cross Bars, 6"
E. Project Requirements:
1. The contractor shall provide the technical knowledge and skill necessary to perform services to meet standards set forth in this Statement of Work for base facilities, equipment and systems and at a minimum meet manufacturer’s requirements.
2. All stored equipment shall be stored and protected in accordance with manufacturer’s recommendations.
3. This project will require daily reports to be filled out daily and submitted to the project manager on a weekly basis. Daily reports at a minimum shall contain the following information,
• Amount and type of work accomplished
• Materials delivered to the site
• Weather conditions and impact to work and schedule
• Labor workforces on site
• Construction equipment on site
• Safety inspection performed and violations noted
• Any outstanding issues, i.e. delays, RFIs, etc.
4. All items shall be installed in accordance with the manufacturer’s installation instructions unless the Base Facility Standards, specifications, drawings, contract clauses, schedule, attachments, manufacturer’s requirements, and other contract documents are more stringent. The most stringent requirement shall be met at no additional cost to the Government.
If meeting the more stringent requirement will void the manufacturer’s warranty the contractor shall notify the Contracting Officer and the inspector prior to voiding the warranty.
5. Coordination shall be required between different disciplines.
F. Physical Security:
1. The contractor shall be responsible for safeguarding all government personnel and property being modified or adjacent to the new work. The contractor shall identify any existing problems in writing prior to start work.
2. At the close of each work day, all government facilities, equipment, and materials shall be secured and back in operation unless agreed on prior to the work starting. The contractor shall be responsible for controlling access into an area that has been turn over to them for construction.
G. Contractor Operations: Comply with Occupational Safety and Health Administration (OSHA), Corps of Engineers Safety Manual (EM 385-1-1), the contract safety provisions, Air
Force Occupational Safety and Health (AFOSH) Standards, and National Fire Protection Association (NFPA) standards.
2. Contractor Employees:
a. Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is the obligation of the contractor.
b. The contractor shall furnish to each of his/her employees a place of employment that is free from recognized hazards.
c. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks.
d. This contract shall in no way require persons to work in surroundings or under working conditions that are unsafe or dangerous to their health.
e. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property.
f. This requires providing personnel with protective equipment and associated safety equipment as may be necessary.
g. The contractor must also protect government personnel from hazards generated by the work.
3. Contractor Badges: All employees to enter Robins AFB shall have government provided badges. Contact the Project Manager/Badge Agent for the current badge application form. Badge request shall be submitted a minimum of 10 days prior to the employee’s arrival.
4. Fire Reporting:
a. Brief all workers and subcontractors as to the location of telephone and fire alarm pull stations.
b. Report all fires as soon as discovered. The fire reporting number for on Base phones is 911. The fire reporting number for off Base phones is 478-222-2900. The caller should give his or her name and location of what is on fire. Also, give any other information that may be requested by the Fire Department dispatcher. Stay on the telephone until the dispatcher has obtained all necessary information.
5. Work shall be performed to, but not be limited to, the requirements set forth by the following:
a. Robins AFB – Base Facility Standards (last edition)
b. Occupational Safety and Health Administration (OSHA)
c. All other applicable federal, state and local codes to ensure the system/s are installed in accordance with manufacturer’s specifications.
d. Air Force Occupational Safety and Health (AFOSH)
e. National Fire Protection Association
f. UFC 3-600-01 – Fire Protection Engineering for Facilities
g. The contractor shall perform all work to conform to the standards of the government listed in paragraph above and per manufacturer specifications/ requirements.
h. Equipment and materials provided by the contractor shall match/meet or exceed the specified equipment and material.
i. The contractor shall correct work not meeting these specifications at no additional expense to the government.
j. The contractor shall coordinate work between the different disciplines.
6. Permits & Utility Outages:
meetings.
a. It shall be the contractor’s responsibility to attend permit and outage request
b. Before any “hot work” is performed on the job, an AF Form 592, USAF Welding, Cutting, or Brazing Permit, must be obtained and displayed at the work site for the duration of the permit.
c. Permits can be obtained by contacting the Civil Engineer Construction Inspector/Army Corp Project Engineer assigned to the job. The Fire Alarm Dispatch Center can be reached at 478-926-3487 or 478-926-3488.
d. Permits will be returned to the fire department, Bldg. 377 Fire Station Number 1, on the day they expire.
e. Adequate number and type of portable fire extinguishers, supplied by the contractor, will be as close to the work as possible. At least a 10 lb ABC type fire extinguisher shall be located at close proximity to the work being performed. In certain circumstances, one or two 20 lb ABC type fire extinguishers will be required for hazardous locations. The fire inspector issuing the welding/burning permit will determine the required level of protection at the time of permit issuance.
f. A digging permit will be required before any digging, driving of stakes or post starts.
g. Digging Permits are obtained on Monday at 0800 hours of each week at building 1555 break area. If Monday falls on a holiday, the permits will be issued on Tuesday following that Monday.
h. Utility Outages will be signed off on during the weekly outage meeting held on Wednesdays at 1000 hours in building 1555. Request utility outages in writing to the Base Civil Engineer, with a copy to the Contracting Officer a minimum of 21 days before the proposed outage.
i. Outages shall be scheduled at the Government’s convenience and may be at times other than normal working hours. For example, the times may be on weekends or during the second and third shifts (including holidays, holiday weekends, and work curtailment days).
These are at no additional cost to the Government.
j. These hours are subject to change.
7. Project Manager: A full time Project Manager is not required for this delivery order.
a. The superintendent can be a working superintendent. If the superintendent is not a working he must at all times be available to the Government and be totally aware all aspects of the project.
b. The contractor shall provide the Contracting Officer a letter designating a competent person as site Project Manager and Certified superintendent. The letter shall state that the individuals has full authority to act for the Contractor and will be the primary Point of Contact for the Government. The Government reserves the right to disapprove the proposed one or both individuals submitted.
c. The Government through the Contracting Officer or Technical Representative of the Contracting Officer reserves the right to shut down all Contractor site activities if the superintendent is not on site on the roof at such times of a visit. Site work shall not resume until the superintendent has returned to the site.
8. Site, Maintenance, Clean-up and Restoration:
a. Maintain the work site in a neat, orderly and safe manner.
b. Remove scrap, waste and excess materials promptly. Provide signs, barricades and lights as required to protect base personnel.
c. Do not allow trash and debris to accumulate and become unsightly. Sweep up and collect in contractor-maintained disposal containers daily. Dispose of collected debris weekly as a minimum.
d. Restore the project site to its final condition as required by the contract as soon as possible.
9. Rejected Work: If work performed by the contractor or a subcontractor does not meet the plans, specifications, national standards, applicable codes, industry standards, or acceptable workmanship the contractor shall accomplish the rework at no additional cost to the government.
Rework will be rescheduled for the next normal workday.
10. Equipment Damaged by Contractor: The contractor shall take before and after photographs of the work site. Prior to starting work the contractor shall photograph, annotate, and bring to the attention of the inspector any noticeable damage to equipment, ceilings, walls, doors and frames, furniture, floors etc. The location of the annotated and photographs needs to be well defined. If the damage is not documented then the contractor shall be responsible for the repairs. The contractor shall jointly verify the status of the fire alarm panel with the inspector prior to work starting. The contractor shall be responsible for the repair of any of the above damaged in the process of performing their work. The repairs shall utilize original manufacturer’s approved parts and comply with manufacturer’s specifications. When the contractor finishes the repair, the equipment shall function within acceptable manufacturer’s specifications. This shall be accomplished at no cost to the Government.
11. Contract Qualifications: The contractor shall ensure that all employees performing work under this contract have all applicable licenses and certification to work on the item/s in question. At a minimum the contractor shall hold all applicable license/s required by the state for the type of work being accomplished. Supporting documentations shall be provided if requested. At any time, work performed by a non-qualified person/s may be rejected as noncompliance and may not be acceptable.
1.2 CONTINUED OCCUPANCY:
A. Access: The contractor will be given access to the project area.
B. The work area is not in a restricted area.
C. Beneficial Occupancy: The Government reserves the right to take beneficial occupancy of parts of the project area before the total project completion date. This is not final acceptance, and identified deficiencies must still be corrected.
1.3 HOURS OF OPERATION:
A. Standard Work Hours: The contractor shall perform the services required under this contract during the following hours: MON – FRI, 0700 –1630, except federal holidays and as noted herein. The contractor may be allowed to work, with prior approval of the contracting officer representative, extended hours to ensure timely completion of work at no additional cost to the government. Permission to work extended/alternate hours shall be requested in writing a minimum of 5 days prior to when the alternate work hours are desired. The Government reserves the right to deny the contractor’s request.
B. Holidays: The contractor is not required to work on the following days without written approval: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. If the holiday falls on a Saturday, it is observed on Friday. If the holiday falls on Sunday, it is observed on Monday.
Permission to work on holidays shall be requested in writing a minimum of 5 days prior to when the alternate work hours are desired. The Government reserves the right to deny the contractor’s request.
1.4 SUBMITTALS:
A. All materials listed below are required for each building listed in this delivery order:
1. Design drawing with structural attachment.
2. Paint colors
1.5 GOVERNMENT FURNISHED PROPERTY: Will not be provided in this project.
1.6 GOVERNMENT REPRESENTATIVES:
A. The contractor shall not make any changes to or deviate from the requirements listed in the
SOW unless approved by the Contracting Officer.
B. The government project manager and inspector is (PM) for the contract is MSgt Daniel Rivera, 5 CCG/XP, 478-327-9005.
SIGN-OFF ON PROJECT STATEMENT OF WORK:
- Construction Manager
- Contractor’s Printed Name & Signature
| FStatement of Work |
| CLIN 1 |
| CLIN 2 |
| CLIN 3 |
| CLIN 4 |
| CLIN 5 |