Concrete_Target_Block_Description.pdf

PDF 116 KB Posted

Attached to
Purchase Concrete Target Blocks Federal contract opportunity
Solicitation number
F2V3034210AW01
Issued by
Department of the Air Force Air Mobility Command

About this file

Concrete Target Block Extended Description

View the file

Other files for this federal contract opportunity

Other files attached to Purchase Concrete Target Blocks, newest first.
File Type Posted
Concrete_Target_Blocks_Specification.pdf PDF
RFQ_Response_Sheet_Purchase_and_Deliver_Concrete_Target_Blocks.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONCRETE TARGET BLOCKS

DESCRIPTION

1. Concrete target blocks shall be constructed from minimum of 3000 psi concrete.

2. Contractor shall fabricate the following number of blocks: 292 each Concrete Lego Blocks, 10 foot long x 30 inches high x 24 inches wide concrete lego blocks.

3. Concrete blocks shall be reinforced with 1 pound per yard of Nicon fiber mesh or equivalent reinforcement. If providing an equivalent, please provide specifications.

4. Blocks shall have two 3.5 inch high x 12 inch wide forklift slots in each block. Slots will provide lifting from either side of the block. The forklift points will be centered on the block with outer edge of the slot located 2 foot 6 inches from the outer edges on the 10 foot block . In addition to forklift points, the blocks will also have recessed lifting points on the top surface as depicted in the attached drawing. The 10 foot long blocks will have 2 each recessed lifting points per block.

5. All blocks shall have parallel sides and perpendicular edges with no bowing to the sides.

6. Contractor shall deliver, unload and stack the cured blocks undamaged at Foxtrot Range holding area. Blocks shall be neatly stacked and remain unbroken. The holding area at foxtrot is natural terrain.

7. Contractor may perform fabrication on base at the designated concreted target area. The finished cured blocks will then be delivered to Observation Point 1(OP1) at Foxtrot Range which requires transport approximately 9 miles over semi-improved dirt roads. All entries to the target holding area must be during normal working hours, Monday through Friday 0730 -1600 local. All deliveries to OP1 must be performed around the operational schedule and will be coordinated with Range Operations.

8. Contractor will be responsible for containing any rubbish/waste generated by the work force, work processes or material delivery at the end of each day. The contractor shall remove all contractor-generated rubbish by the end of the contract period.

File details come from the government source that posted it. Updated .