Statement_of_Work_(Queen).pdf
PDF 15 KB Posted
- Attached to
- Dorm Mattresses Federal contract opportunity
- Solicitation number
- F1T2AR5261A003
About this file
QUEEN Mattress SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Statement_of_Work_(TWIN_XL).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
DESIGN/SUPPLY NEW QUEEN MATRESSES (Qty: 144)
A) Design / Supply:
Design: Mattresses must be equal to Simmons Beautyrest Classic Marquee 250 Luxury Firm with EverNU zip off top feature in Queen. The EverNU feature allows you to replace top to get rid of stains, germs, bacteria, dust mites, and other odors without replacing the entire mattress. This revolutionary design gives you the option of replacing the top without having to replace entire mattress which will save money and extend the life of the mattress.
Mattress Specifications:
Inner-Spring Unit has individually Pocketed Coil. Heavy gauge steel wire coils are independently encased within durable, non-allergenic pockets
Coil Unit Pocketed Coil
Coil Count (Queen 60”x80”X10.5) 850 Coil Gauge (minimum) 15.5 Gauge Border Wire (minimum) 6 Gauge
Edge Supports 2 Rows of 13.25 ga. Mega Edge
Support Coils
Quilting Multi-Needle QuiltedDamask First Layer 1.2 oz./sq ft Fiber Second Layer 5/16” Purfoam Third Layer 5/16” Purfoam
Warranty 10/10 Non-Prorated
Mattress Height 9.5”
B) Removal of old mattresses:
- Government will remove old mattress
C) Installation:
- Government will unload truck and install new mattresses
*Contractor must notify the Government of a firm delivery date and truck must arrive NLT 1100
AM.
| STATEMENT OF WORK |
| Inner-Spring Unit has individually Pocketed Coil. Heavy gauge steel wire coils are independently encased within durable, non-allergenic pockets |
| Coil Count (Queen 60”x80”X10.5) 850 |
| Support Coils |
| First Layer 1.2 oz./sq ft Fiber |
| *Contractor must notify the Government of a firm delivery date and truck must arrive NLT 1100 AM. |
File details come from the government source that posted it. Updated .