Exhibits 1 to 4 127EAX22R0034.pdf

PDF 4 MB Posted

Attached to
Construction: NFSR 700 and 91 Recondition/Resurface Federal contract opportunity
Solicitation number
127EAX22R0034
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

This document contains a federal contract solicitation for road reconditioning and resurfacing services. The USDA Forest Service, Coconino National Forest, Flagstaff Ranger District is seeking a contractor to recondition and resurface with crushed aggregate approximately 10.2 miles of Forest Service Roads 700 and 91 in Coconino County, Arizona. There are also optional line items to recondition and resurface an additional 5 miles. The estimated value of the contract is between $500,000 and $1 million. The solicitation is set aside 100% for small businesses under NAICS code 237310. The government will award a firm fixed-price contract and payment and performance bonds are required from the successful offeror. Offers are due by July 19, 2022 and must be submitted electronically to the contracting officer. The contract will be awarded based on best value tradeoffs.

View the file

Other files for this federal contract opportunity

Other files attached to Construction: NFSR 700 and 91 Recondition/Resurface, newest first.
File Type Posted
NFSR 700 Map for restricted areas.pdf PDF
127EAX22R0034 SF 30 Amendment 0002.pdf PDF
127EAX22R0034 NFSR 700 and 91 Revision2.pdf PDF
127EAX22R0034 SF 30 Amendment 0001.pdf PDF
127EAX22R0034 NFSR 700 and 91 Revision1.pdf PDF
127EAX22R0034 NFSR 700 and 91.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: AZ20220008 01/07/2022

Superseded General Decision Number: AZ20210008

State: Arizona

Construction Type: Highway

Counties: Coconino, Maricopa, Mohave, Pima, Pinal, Yavapai, and Yuma Counties in Arizona.

HIGHWAY CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022, Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $15.00 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.

If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022, Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $11.25 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/07/2022 1 02/25/2022

CARP0408-005 07/01/2021

Rates Fringes

CARPENTER (Including Cement Form Work).......................$ 30.63 13.49

ENGI0428-001 06/01/2021

Rates Fringes

POWER EQUIPMENT OPERATOR

Group 1.....................$ 28.59 12.12 Group 2.....................$ 31.86 12.12 Group 3.....................$ 32.94 12.12 Group 4.....................$ 33.97 12.12

POWER EQUIPMENT OPERATORS CLASSIFICATIONS:

GROUP 1: A-frame boom truck, air compressor, Beltcrete, boring bridge and texture, brakeman, concrete mixer (skip type), conductor, conveyor, cross timing and pipe float, curing machine, dinky (under 20 tons), elevator hoist (Husky and similar), firemen, forklift, generator (all), handler, highline cableway signalman, hydrographic mulcher, joint inserter, jumbo finishing machine, Kolman belt loader, machine conveyor, multiple power concrete saw, pavement breaker, power grizzly, pressure grout machine, pump, self-propelled chip spreading machine, slurry seal machine (Moto paver driver), small self-propelled compactor (with blade-backfill, ditch operation), straw blower, tractor (wheel type), tripper, tugger (single drum), welding machine, winch truck

GROUP 2:

ALL COUNTIES INCLUDING MARICOPA: Aggregate Plant, Asphalt plant Mixer, Bee Gee, Boring Machine, Concrete Pump, Concrete Mechanical Tamping-Spreading Finishing Machine, Concrete Batch Plant, Concrete Mixer (paving & mobile), Elevating Grader (except as otherwise classified), Field Equipment Serviceman, Locomotive Engineer (including Dinky 20 tons & over), Moto-Paver, Oiler-Driver, Operating Engineer Rigger, Power Jumbo Form Setter, Road Oil Mixing Machine, Self-Propelled Compactor (with blade-grade operation), Slip Form (power driven lifting device for concrete forms), Soil Cement Road Mixing Machine, Pipe-Wrapping & Cleaning Machine (stationary or traveling), Surface Heater & Planer, Trenching Machine, Tugger (2 or more drums).

MARICOPA COUNTY ONLY: Backhoe < 1 cu yd, Motor Grader (rough), Scraper (pneumatic tired), Roller (all types asphalt), Screed, Skip Loader (all types 3<6 cu yd), Tractor (dozer, pusher-all).

GROUP 3:

ALL COUNTIES INCLUDING MARICOPA: Auto Grade Machine, Barge, Boring Machine (including Mole, Badger & similar type directional/horizontal), Crane (crawler & pneumatic 15>100 tons), Crawler type Tractor with boom attachment & slope bar, Derrick, Gradall, Heavy Duty Mechanic-Welder, Helicopter Hoist or Pilot, Highline Cableway, Mechanical Hoist, Mucking Machine, Overhead Crane, Pile Driver Engineer (portable, stationary or skid), Power Driven Ditch Lining or Ditch Trimming Machine, Remote Control Earth Moving Machine, Slip Form Paving Machine (including Gunnert, Zimmerman & similar types), Tower Crane or similar type.

MARICOPA COUNTY ONLY: Backhoe<10 cu yd, Clamshell < 10 cu yd, Concrete Pump (truck mounted with boom only), Dragline <10 cu yd, Grade Checker, Motor Grader (finish-any type power blade), Shovel < 10 cu yd.

GROUP 4: Backhoe 10 cu yd and over, Clamshell 10 cu yd and over, Crane (pneumatic or crawler 100 tons & over), Dragline 10 cu yd and over, Shovel 10 cu yd and over.

All Operators, Oilers, and Motor Crane Drivers on equipment with Booms, except concrete pumping truck booms, including Jibs, shall receive $0.01 per hour per foot over 80 ft in addition to regular rate of pay

Premium pay for performing hazardous waste removal $0.50 per hour over base rate.

IRON0075-004 04/01/2021

COCONINO, MARICOPA, MOHAVE, YAVAPAI & YUMA COUNTIES

Rates Fringes

Ironworker, Rebar................$ 28.80 19.35

Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson Zone 2: 050 to 100 miles - Add $4.00 Zone 3: 100 to 150 miles - Add $5.00 Zone 4: 150 miles & over - Add $6.50

LABO1184-008 06/01/2021

Rates Fringes

Laborers:

Group 1.....................$ 21.93 6.27 Group 2.....................$ 23.57 6.27 Group 3.....................$ 24.43 6.27 Group 4.....................$ 25.40 6.27 Group 5.....................$ 26.50 6.27

LABORERS CLASSIFICATIONS:

GROUP 1: All Counties: Chipper, Rip Rap Stoneman. Pinal County Only: General/Cleanup Laborer. Maricopa County Only: Flagger.

GROUP 2: Asphalt Laborer (Shoveling-excluding Asphalt Raker or Ironer), Bander, Cement Mason Tender, Concrete Mucker, Cutting Torch Operator, Fine Grader, Guinea Chaser, Power Type Concrete Buggy

GROUP 3: Chain Saw, Concrete Small Tools, Concrete Vibrating Machine, Cribber & Shorer (except tunnel), Hydraulic Jacks and similar tools, Operator and Tender of Pneumatic and Electric Tools (not herein separately classified), Pipe Caulker and Back-Up Man-Pipeline, Pipe Wrapper, Pneumatic Gopher, Pre-Cast Manhole Erector, Rigger and Signal Man-Pipeline

GROUP 4: Air and Water Washout Nozzleman; Bio-Filter, Pressman, Installer, Operator; Scaffold Laborer; Chuck Tender; Concrete Cutting Torch; Gunite; Hand-Guided Trencher; Jackhammer and/or Pavement Breaker; Scaler (using boson's chair or safety belt); Tamper (mechanical all types).

GROUP 5: AC Dumpman, Asbestos Abatement, Asphalt Raker II, Drill Doctor/Air Tool Repairman, Hazardous Waste Removal, Lead Abatement, Lead Pipeman, Process Piping Installer, Scaler (Driller), Pest Technician/Weed Control, Scissor Lift, Hydro Mobile Scaffold Builder.

PAIN0086-001 04/01/2017

Rates Fringes

PAINTER

PAINTER (Yavapai County only), SAND BLASTER/WATER BLASTER (all Counties)......$ 19.58 6.40

ZONE PAY: More than 100 miles from Old Phoenix Courthouse $3.50 additional per hour.

* SUAZ2009-001 04/20/2009

Rates Fringes

CEMENT MASON.....................$ 19.28 3.99

ELECTRICIAN......................$ 22.84 6.48

IRONWORKER (Rebar) Pima County.................$ 23.17 14.83 Pinal County................$ 20.27 8.35

LABORER

Asphalt Raker...............$ 15.49 3.49 Compaction Tool Operator....$ 14.59 ** 2.91 Concrete Worker.............$ 13.55 ** 3.20 Concrete/Asphalt Saw........$ 13.95 ** 2.58 Driller-Core, diamond, wagon, air track............$ 16.94 3.12 Dumpman Spotter.............$ 14.99 ** 3.16 Fence Builder...............$ 13.28 ** 2.99 Flagger Coconino, Mohave, Pima, Pinal, Yavapai & Yuma......$ 12.35 ** 1.59 Formsetter..................$ 16.09 3.97 General/Cleanup Laborer Coconino, Maricopa, Mohave, Pima, Yavapai & Yuma.......................$ 14.54 ** 3.49 Grade Setter (Pipeline).....$ 17.83 5.45

Guard Rail Installer........$ 13.28 ** 2.99 Landscape Laborer...........$ 11.39 ** Landscape Sprinkler Installer...................$ 15.27 Pipelayer...................$ 14.81 ** 2.96 Powderman, Hydrasonic.......$ 16.39 2.58

OPERATOR: Power Equipment Asphalt Laydown Machine.....$ 21.19 6.05 Backhoe < 1 cu yd Coconino, Mohave, Pima, Pinal, Yavapai & Yuma......$ 17.37 3.85 Backhoe < 10 cu yd Coconino, Mohave, Pima, Pinal, Yavapai & Yuma......$ 18.72 3.59 Clamshell < 10 cu yd Coconino, Mohave, Pima, Pinal, Yavapai & Yuma......$ 18.72 3.59 Concrete Pump (Truck Mounted with boom only) Coconino, Mohave, Pima, Pinal, Yavapai & Yuma......$ 19.92 7.10 Crane (under 15 tons).......$ 21.35 7.36 Dragline (up to 10 cu yd) Coconino, Mohave, Pima, Pinal, Yavapai & Yuma......$ 18.72 3.59 Drilling Machine (including Water Wells).....$ 20.58 5.65 Grade Checker Coconino, Mohave, Pima, Pinal, Yavapai & Yuma......$ 16.04 3.68 Hydrographic Seeder.........$ 15.88 7.67 Mass Excavator..............$ 20.97 4.28 Milling Machine/Rotomill....$ 21.42 7.45 Motor Grader (Finish-any type power blade) Coconino, Mohave, Pima, Pinal, Yavapai & Yuma......$ 21.92 4.66 Motor Grader (Rough) Coconino, Mohave, Pima, Pinal, Yavapai & Yuma......$ 20.07 4.13 Oiler.......................$ 18.15 8.24 Power Sweeper...............$ 16.76 4.44 Roller (all types Asphalt) Coconino, Mohave, Pima, Pinal, Yavapai & Yuma......$ 18.27 3.99 Roller (excluding asphalt)..$ 15.65 3.32 Scraper (pneumatic tired) Coconino, Mohave, Pima, Pinal, Yavapai & Yuma......$ 17.69 3.45 Screed Coconino, Mohave, Pima, Pinal, Yavapai & Yuma......$ 17.54 3.72 Shovel < 10 cu yd Coconino, Mohave, Pima, Pinal, Yavapai & Yuma......$ 18.72 3.59 Skip Loader (all types <3 cu yd)......................$ 18.28 5.30 Skip Loader (all types 3 < 6 cu yd) Coconino, Mohave, Pima, Pinal, Yavapai & Yuma......$ 18.64 4.86 Skip Loader (all types 6 < 10 cu yd)...................$ 20.15 4.52 Tractor (dozer, pusher -all) Coconino, Mohave, Pima, Pinal, Yavapai & Yuma......$ 17.26 2.65

PAINTER

Coconino, Maricopa, Mohave, Pima, Pinal & Yuma..$ 15.57 3.92

TRUCK DRIVER

2 or 3 Axle Dump or Flatrack....................$ 16.27 3.30 5 Axle Dump or Flatrack.....$ 13.97 ** 2.89 6 Axle Dump or Flatrack (< 16 cu yd)...................$ 17.79 6.42 Belly Dump..................$ 14.67 ** Oil Tanker Bootman..........$ 22.03 Self-Propelled Street Sweeper.....................$ 13.11 ** 5.48 Water Truck 2500 < 3900 gallons.....................$ 18.14 4.55 Water Truck 3900 gallons and over....................$ 15.92 3.33 Water Truck under 2500 gallons.....................$ 15.94 4.16

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications;

however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

INDUSTRIAL FIRE PLAN

PURPOSE

When operating on National Forest Lands, it is incumbent on the Contractor to know the current Industrial Fire Plan and to take the appropriate actions to meet the mitigation measures in these guidelines. In addition, it is also incumbent on the Contractor to inform any and all of their subordinates (subcontractors, etc.) of these precautions and to ensure that all requirements are being met.

The Contractor shall be responsible for the cost of suppressing all fires caused by their operation, and for all damage to any property of the United States Department of Agriculture Forest Service (USDA FS) or third parties. The USDA FS reserves the right to participate in extinguishing any fires caused by the Contractor’s operations and the Contractor shall reimburse the USDA FS for the cost of all suppression activities ordered or directed by the USDA FS.

GENERAL FIRE PRECAUTIONARY MEASURES

COMMUNICATIONS

Contractor shall ensure a serviceable telephone, radio-telephone or radio communication system is available to provide prompt and reliable communications between the Contractor’s operations and the Forest Service in the event of a wildland fire ignition. To report a fire on the Coconino National Forest, contact the Flagstaff Dispatch Center at 928-526-0600.

FIRE TOOLS

Contractors shall furnish and maintain, in good working order, fires tools to be used only for suppressing wildland fires. Each operation shall provide one firefighting tool per person to equip all personnel engaged in Contractor’s operations. Approved firefighting tools may include the following: Pulaski, McLeod tool, long-handled shovel, combination tool, fire rake, or bladder bag.

FIRE TOOLS ON EQUIPMENT

Passenger carrying vehicles, including light pickup trucks and all-terrain vehicles, shall be equipped with one (1) long-handled round-pointed shovel and one (1) ABC dry chemical fire extinguisher not less than 2 ½ pounds capacity. Each internal combustion fuel-carrying piece of equipment (dumptruck, dozer, excavator, backhoe, etc.) shall be equipped with one long-handled round-pointed shovel, and one 5-pound capacity ABC dry chemical fire extinguisher. Shovels and fire extinguishers shall be mounted where they can be readily reached from the ground.

SPARK ARRESTERS AND MUFFLERS

Contractor will ensure that each internal combustion engine shall be equipped with a spark arrester qualified and rated under USDA Forest Service Standard (Spark Arrester Guide) 5100-1a or the latest revision of Society of Automotive Engineers "medium size engine, SAE recommended practice J350" unless it is:

(a) Equipped with a turbine-driven exhaust supercharger such as the turbocharger. There shall be no exhaust bypass.

(b) All internal combustion engines shall be equipped with an approved spark arrester/muffler containing a 0.023 inch mesh screen in good condition.

(c) A passenger carrying vehicle or light truck, or medium truck up to 40,000 GVW, used on roads and equipped with a factory designed muffler and an exhaust system in good working condition.

(d) A heavy duty truck, such as a dump truck, or other vehicle used for commercial hauling, used only on roads and equipped with a factory designed muffler and with a vertical stack exhaust system extending above the cab.

Exhaust equipment described in this Subsection, including spark arresters and mufflers, shall be properly installed and constantly maintained in serviceable condition.

POWERED HANDTOOLS (POWERSAWS)

During periods of use, each powered hand tool (power saw) operator shall have readily available for use, one long-handled round-pointed shovel and one chemical-pressurized ABC dry chemical fire extinguisher of not less than 8-ounce capacity by weight. Muffler, extinguisher, and shovel shall be maintained in good working order at all times. Fueling or refueling of a powered hand tool (power saw) shall be done in an area which has been completely cleared of material which will carry fire.

Powered hand tools (power saws) shall be moved at least 10 feet from the place of fueling or refueling before starting.

GAS AND OIL STORAGE AND SERVICE AREAS

The location of equipment service areas and gas and oil storage areas shall be approved in writing by the permit administrator. All areas shall be cleared of brush, litter, grass or other flammable debris for a radius of 50 feet.

SMOKING, LUNCH, AND WARMING FIRE RESTRICTIONS

Contractor shall prohibit smoking and building of camp and lunch fires by persons engaged in Contractor’s operations, except at established camps or in areas that the Forest Service may designate. Smoking may be permitted at these designated areas only after all flammable material has been cleared to mineral soil. All fires and smoking materials shall be completely extinguished at end of lunch or smoking period.

BURNING OF REFUSE

No slash or other debris, such as that resulting from clearing on right-of-way, shall be burned without the written consent of the Forest Service.

WELDING

An area of sufficient size but not less than a 10 foot radius shall be cleared down to mineral soil before welding operations are started. Prior to welding, authorized user shall have available a round-pointed long-handled shovel, at least 5-gallons of water, and a 5-pound fire ABC dry chemical extinguisher at each welding site. A fire guard must remain on the welding site for a minimum of one hour after welding operations have concluded.

EMERGENCY FIRE PRECAUTION SCHEDULE

FIRE RESTRICTION/CLOSURE “STAGE”

“STAGED” RESTRICTION LEVELS INDUSTRIAL FIRE PRECAUTION

PLAN

NO RESTRICTIONS A

STAGE I (General) B STAGE II (Enhanced) C

PARTIAL/FOREST CLOSURE ** D

RED FLAG WARNING

(Issued by National Weather Service)

D

** Partial Forest Closure:

Project areas which are outside the boundaries of the partial forest closure may continue to operate under Industrial Fire Plan “C” operating criteria as agreed upon between the Contracting Officer and Contractor in writing.

Project areas within the boundaries of the proclaimed partial forest closure area are to operate under Industrial Fire Plan “D”.

Staged restriction levels are determined by the appropriate Forest Line Officer in consultation with the Forest Fire Management Officer and Contracting Officer. The appropriate Forest Line Officer and / or Contracting Officer may adjust the predicted Industrial Fire Plan for local weather conditions within a Project Area. Changes in the predicted Industrial Fire Plan shall be agreed to in writing.

EMERGENCY FIRE PRECAUTION SCHEDULE DESCRIPTION

Contractor will restrict operations in accordance with the attached Emergency Fire Precaution Schedule and/or other precautions set forth by the individual forest:

A - Normal Fire Precautions - No fire guard required except for welding operations.

B - Normal Fire Precautions – Contractor will provide fire guard.

C - Power equipment use, including welding operations as well as power saws and mechanical fellers (except for mechanical fellers equipped with hydraulic shears), will shut down from 9:00 am until 8:00 pm Mountain Standard Time (MST) (or 10:00 am until 9:00 pm Mountain Daylight Time [MDT]). All machine treatment of slash and mechanical equipment used for shearing, bunching, de-limbing, or skidding will be shut down from 12:00 noon until 8:00 pm MST (or1:00 pm until 9:00 pm MDT). No smoking, warming, or cooking fires are permitted at any time. Contractor will provide fire guard.

D - Shutdown all operations (including welding) unless an exemption is granted by the Contracting Officer. Contractor will provide fire guard.

FIRE GUARDS

To prevent, detect, and suppress wildland fire, the Contractor shall provide a fire guard at each operating area where power-driven equipment and tools have operated during the day. The fire guards shall constantly perform their duties during operating hours and for three (3) hours after the work stops for the day, when the Fire Precaution Plan is Plan “B”, “C”, or “D”.

A fire guard on one operating area shall satisfy the requirements on adjacent areas if the travel time with available transportation does not exceed (10) minutes to any of the other areas requiring such service and provided the fire guard patrols all areas where the Contractor’s activities occurred.

Each fire guard shall be vigilant, able and prepared to take actions to prevent, detect, and report any wildland fires and to promptly and efficiently take suppression action with available required firefighting equipment and personnel on any wildland fire that starts on project area. Each fire guard shall be equipped with a vehicle and a fire tool cache consisting of a cache box with a complement of fire tools (see section Fire Tools) maintained in serviceable condition. The fire guard will also carry at least 25 gallons of water for firefighting purposes.

RED FLAG WARNING

A Red Flag Warning is issued when a combination of dry fuels and weather conditions could lead to extreme fire danger. The National Weather Service (NWS) issues Red Flag Warnings to alert land management agencies about the onset, or possible onset, of critical weather and fuel moisture conditions in the next 24 hours that could lead to rapid or dramatic increases in wildfire activity.

When a Red Flag Warning is issued by the National Weather Service, all Contractor operations will adhere to Industrial Fire Precaution Plan “D” and will shut down operations (unless an exemption is granted by Contracting Officer) until the Red Flag Warning is rescinded.

STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON

FEDERAL HIGHWAY PROJECTS (FP-14 U.S. CUSTOMARY UNITS) (2014)

The Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14 U.S. Customary Units), 2014 are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.

The 746-page book entitled “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14 U.S. Customary Units), is available from:

Research & Technology Product Distribution Center (RTPDC) U.S. Department of Transportation Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590

Email: report.center@dot.gov Phone 814-239-1160 Fax 814-239-2156 https://highways.dot.gov/federal-lands/specs

Applicable sections include (1) Sections designated in the following list and (2) Sections referenced therein.

Section No. Title 101 Terms ̧Format ̧and Definitions 102 Bid ̧Award ̧and Execution of Contract 103 Scope of Work 104 Control of Work 105 Control of Material 106 Acceptance of Work 107 Legal Relations and Responsibility to the Public 108 Prosecution and Progress 109 Measurement and Payment 155 Schedules for Construction Contracts 156 Public Traffic 204 Excavation and Embankment 301 Untreated Aggregate Courses 303 Roadway Reconditioning 703 Aggregate mailto:report.center@dot.gov https://highways.dot.gov/federal-lands/specs

FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS TO THE STANDARD

SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL

HIGHWAY PROJECTS

Forest service supplemental specifications (FSSS) may add to, delete from, or modify the Forest Service Standard Specifications (FP-14). FSSS are applicable to this project and are included in full text as an attachment listed in Section J.

Table of Contents Preface

101 - Terms¸ Format¸ and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid¸ Award¸ and Execution of Contract

Delete Section 102

103 - Scope of Work

Delete Subsections 103.02, 103.03, 103.04, 103.05

104 - Control of Work

Delete Subsections 104.01, 104.02, 104.04

104.06 Use of Roads by Contractor

105 - Control of Material

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.01 Conformity with Contract Requirements

106.02 Visual Inspection

107 - Legal Relations and Responsibility to the Public

Delete Subsection 107.05

108 - Prosecution and Progress

Delete Section 108

109 - Measurement and Payment

Delete Subsections 109.06, 109.07, 109.08, 109.09

109.01 Measurement of Work

109.02 Measurement Terms and Definitions

155 - Schedules for Construction Contracts

Delete Section 155

156 - Public Traffic

Section 156. – PUBLIC TRAFFIC

204 - Excavation and Embankment

Section 204. — EXCAVATION AND EMBANKMENT

301 - Untreated Aggregate Courses

301.03 General

301.05 Compacting

303 - Road Reconditioning

303.07 Roadway Reconditioning

703 - Aggregate

703.05 (c) Surface course aggregate. (3) Plastic Index

Preface Preface_wo_01_11_2022

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.

101 - Terms¸ Format¸ and Definitions 101.01_National_11_9_2016

Add the following paragraph to Subsection 101.01:

101.01 Meaning of Terms.

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_National_11_9_2016

Add the following to Subsection 101.03:

101.03 Abbreviations.

(a) Acronyms.

AGAR — Agriculture Acquisition Regulations

AFPA — American Forest and Paper Association

FSAR — Forest Service Acquisition Regulations

MSHA — Mine Safety and Health Administration

NESC — National Electrical Safety Code

WCLIB — West Coast Lumber Inspection Bureau

(f) Miscellaneous unit abbreviations.

MP — milepost location ppm — parts per million volume

STA station location

101.04_National_1_22_2020

Make the following changes to Subsection 101.04:

101.04 Definitions.

Delete these definitions and replace the following:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.

Utilization Standards —

The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid¸ Award¸ and Execution of Contract 102.00_National_11_9_2016

Delete Section 102 in its entirety.

Delete Section 102.

103 - Scope of Work 103.00_National_11_9_2016

Delete all of Section 103 except Subsection 103.01 Intent of Contract.

Delete Subsections 103.02, 103.03, 103.04, 103.05.

104 - Control of Work 104.00_National_11_9_2016

Delete Subsections 104.01, 104.02, and 104.04.

Delete Subsections 104.01, 104.02, 104.04.

104.06_National_11_9_2016

Add the following to Subsection 104.06:

104.06 Use of Roads by Contractor.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.05_National_6_29_2020

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.

106 - Acceptance of Work 106.01_National_7_18_2017

Delete Subsection 106.01 and replace with the following:

106.01 Conformity with Contract Requirements.

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work; providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

1. Sampling method;

2. Number of samples;

3. Sample transport;

4. Test procedures;

5. Testing laboratories;

6. Reporting;

7. Estimated time and costs; and

8. Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol.

If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

1. Have the work accepted at a reduced price; or

2. Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.02_National_11_9_2016

Delete Subsection 106.02 and replace with the following:

106.02 Visual Inspection.

Acceptance is based on visual inspection of the work for compliance with the specific contract requirements.

Use prevailing industry standards in the absence of specific contract requirements or tolerances.

107 - Legal Relations and Responsibility to the Public 107.05_National_7_18_2017

Delete Subsection 107.05.

Delete Subsection 107.05.

108 - Prosecution and Progress 108.00_National_11_9_2016

Delete Section 108 in its entirety.

Delete Section 108.

109 - Measurement and Payment 109.00_National_11_9_2016

Delete Subsections 109.06, 109.07, 109.08, and 109.09:

Delete Subsections 109.06, 109.07, 109.08, 109.09.

109.01_National_2_22_2019

Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:

109.01 Measurement of Work.

Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.

Table 109-1

Decimal Accuracy of Quantities for Final Payment

Pay Item Level of Precision Linear Foot 1

Exception--Timber, Steel, and concrete Piles 0.1 Station 0.1 Mile 0.01 Square Foot 0.1 Square Yard 0.1 Each 1 Acre 0.01 Gallon 1 M-Gals. 0.1 Cubic Yard 1

Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;

0.1

Exception--Concrete; Masonry 0.01 Pound 1 Ton 0.1

Exception--Calcium Chloride;

Sodium Chloride; Hydrated Lime;

Bituminous Materials; Pavements;

Bed Course Materials

0.01

Hour 0.1

MFBM 0.01

Station Yard 1 Cubic Yard Mile 1 Ton Mile 1

109.02_National_11_9_2016

Add the following sentence to Subsection 109.02(b):

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

155 - Schedules for Construction Contracts 155.00_National_11_9_2016

Delete Section 155 in its entirety.

Delete Section 155.

156 - Public Traffic 156.00_National_2_5_2019

Delete Section 156 in its entirety and replace with the following:

Section 156. – PUBLIC TRAFFIC Description

156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.

Material

156.02 Conform to the MUTCD and the following Sections and Subsections:

Permanent Traffic Control 633

Traffic Signing and Marking Material 718

Concrete Barriers and Precast Guardwalls 618

Temporary plastic fence 30 30 710.11

Construction Requirements

156.03 General. Accommodate traffic according to MUTCD, approved traffic control plan and this section.

Perform work in a manner that ensures safety and convenience of the public. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed 30 minutes at any one time followed by an open period of no less than 30 minutes. Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to Subsection 106.07(b).

Submit traffic control plan at least 30 days prior to intended use. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.

Post construction signs and traffic control devices in conformance with MUTCD and Forest Service EM 7100-15.

All required signs will be in place and approved prior to beginning work on project.

If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.

156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:

(a) Furnish and install traffic control devices before the start of construction operations.

(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.

(c) Install only those traffic control devices needed for each stage or phase.

(d) Relocate temporary traffic control devices as necessary.

(e) Remove devices that no longer apply to the existing conditions.

(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.

(g) Keep temporary traffic control devices clean.

(h) Remove all temporary traffic control devices upon contract completion or when approved.

(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.

156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.

Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.

Table 156-1 Temporary Road Closures

Road Number

From Terminus

To Terminus

Maximum Consecutive Days of Closure

Minimum Consecutive Days Open

N/A

156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.

Measurement and Payment

156.07 Do not measure Public Traffic for payment. Payment for contract work is provided indirectly. See Subsection 109.05.

204 - Excavation and Embankment 204.00_National_11_4_2016

Delete Section 204 in its entirety and replace with the following.

Section 204. — EXCAVATION AND EMBANKMENT Description

204.01 This work consists of excavating material and constructing embankments. This work also includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.

204.02 Definitions.

(a) Excavation. Excavation consists of the following:

(1) Roadway excavation. Material excavated from within the right-of-way or easement areas, except subexcavation covered in Subsection 204.02(a)(2) and structure excavation covered in Sections 208 and

209. Roadway excavation includes all material encountered regardless of its nature or characteristics.

(2) Sub excavation. Material excavated from below subgrade elevation in cut sections or from below the original ground-line in embankment sections. Subexcavation excludes the work required by Subsection

204.05 or 204.06.

(3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism. Borrow excavation includes unclassified borrow, and topping.

(b) Embankment construction. Embankment construction consists of placing and compacting roadway or borrow excavation. This work includes:

(1) Preparing foundation for embankment;

(2) Constructing roadway embankments;

(3) Benching for side-hill embankments;

(4) Constructing dikes, ramps, mounds, and berms; and

(5) Backfilling subexcavated areas, holes, pits, and other depressions.

(c) Conserved topsoil. Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation.

(d) Waste. Excess and unsuitable roadway excavation and subexcavation that cannot be used.

Material

204.03 Conform to the following Subsections:

Topping 704.05

Unclassified borrow 704.06

Water 725.01(c)

Construction Requirements

204.04 Preparation for Roadway Excavation and Embankment Construction. Clear the area of vegetation and obstructions according to Sections 201 and 203.

Road pioneering, slash disposal, and grubbing of stumps may proceed concurrently with excavation and embankment. Maintain drainage during pioneering operations.

204.05 Conserved Topsoil. When designated, conserve topsoil from roadway excavation and embankment foundation areas. Stockpile conserved topsoil in low windrows immediately beyond the rounding limits of cut and embankment slopes or in other approved locations. Separate conserved topsoil from other excavated material.

When designated, place conserved topsoil on completed slopes according to Section 624.

204.06 Roadway Excavation. Excavate as follows:

(a) Rock cuts. Blast rock according to Section 205. Excavate rock cuts to 6 inches (150 millimeters) below subgrade within the roadbed limits. Backfill to subgrade with topping or other suitable material. Compact the material according to Subsection 204.11.

(b) Earth cuts. Scarify earth cuts to 6 inches (150 millimeters) below subgrade within the roadbed limits.

Compact the scarified material according to Subsection 204.11.

(c) Pioneer Roads. Conduct excavation and placement operations so material to be treated under Section 201 will not be incorporated into the roadway unless specified in the slash treatment method.