Exhibit 1 CDRL.pdf
PDF 118 KB Posted
- Attached to
- Repair Fuel Flow Power Supply Federal contract opportunity
- Solicitation number
- FA811720R0041
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 4 Wage Determination 15-5645.pdf | ||
| Exhibit 6 DID 80969.pdf | ||
| Exhibit 5 DID 81832.pdf | ||
| Attachment 3 Transportation.pdf | ||
| Attachment 1 Performance Work Statement.pdf | ||
| FA811720R0041.pdf | ||
| Exhibit 4 DID 80441C.pdf | ||
| Exhibit 7 DID 80639E.pdf | ||
| Exhibit 2 DID 81838.pdf | ||
| Exhibit 3 DID 81995.pdf | ||
| Attachment 2 Packaging.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52, C130, KC-135 / Power Supply
E. CONTRACT / PR NO.
FD20302000985
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Commercial Asset Visibility (CAV) Reporting
3. SUBTITLE
CFM End Item Reporting
4. AUTHORITY
DI-MGMT-81838
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
See Block 16
6. REQUIRING OFFICE
422 SCMS/GUME
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
Seee Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Tate, Anthony DNAME: 01 MAY 2020DATE:
THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 5: Contract Reference: PWS and CAV AF Reporting Requirements Document.
2. Block 4: All reporting shall be submitted in the English Language.
3. Blocks 10, 11, 12, 13:
a. Date of first submission shall be within 24 hours following a supply or maintenance transaction, after the contract award date.
b. Contractor reporting requirements to CAV AF shall be submitted daily and/or within 24 hours of a supply or maintenance action occurrence IAW the CAV AF Reporting Requirements Document.
c. Data shall be current within 24 hours of the last End Item maintenance occurrence.
4. Blocks 7, 8, 14:
a. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF website or CICA XML.
b. The contractor shall submit a DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://wawf.eb.mil, using DODAAC FA8251. MARK FOR: Address in block 14A.
c. A Letter of Transmittal shall be submitted in the month the delivery order is completed, covering all reports transmitted for that order. Submit the Letter to the following email address: jeremy.marshall.5@us.af.mil
COORDINATORS:
Marshall, Jeremy P 422 SCMS / GUME 405-734-5839 / 884-5839 04 MAY 2020
See Block 16 0 1 0
0 1 015. TOTAL
G. PREPARED BY
Tate, Anthony D
424 SCMS / GUBAB
405-739-2266
H. DATE
04 MAY 2020
I. APPROVED BY
//DIGITALLY SIGNED//
TATE.ANTHONY.DON.1124023900
424 SCMS / GUBAB 405-739-2266 / 339-2266
J. DATE
04 MAY 2020
Page 1 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 13 May 2020
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52, C130, KC-135 / Power Supply
E. CONTRACT / PR NO.
FD20302000985
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Contract Depot Maintenance (CDM) Production Report
3. SUBTITLE
CDM Production Monthly Status Report
4. AUTHORITY
DI-PSSS-81995
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
422 SCMS/GUME
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Tate, Anthony DNAME: 01 MAY 2020DATE:
THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4:
a. All reporting shall be submitted in the English Language.
b. The Contractor's CAV AF Reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair.
c. The Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.
d. The Contractor shall report on production, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.
2. Blocks 10, 11, 12, 13:
a. The reports shall be provided monthly within 5 (five) business days of the previous month's last calendar date.
b. Reports shall continue to be submitted by the contractor unless the requirement is terminated by the assigned Contracting Officer at the request of the Program Manager (PM) and the Production Management Specialist (PMS).
c. The Final Report submitted following the final reporting period on the contract shall be annotated "Final Report".
3. Block 9:
a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only, critical technology. Other requests for this document shall be referred to 848 SCMG/EN DoD Controlling Office.
b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:
EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App.
2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.
c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
See Block 16 0 1 0
0 1 015. TOTAL
Page 2 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 13 May 2020
4. Block 7, 14: Submit the CDM Production Monthly Status Reports to the following email address:
jeremy.marshall.5@us.af.mil
COORDINATORS:
Marshall, Jeremy P 422 SCMS / GUME 405-734-5839 / 884-5839 04 MAY 2020
G. PREPARED BY
Tate, Anthony D
424 SCMS / GUBAB
405-739-2266
H. DATE
04 MAY 2020
I. APPROVED BY
//DIGITALLY SIGNED//
TATE.ANTHONY.DON.1124023900
424 SCMS / GUBAB 405-739-2266 / 339-2266
J. DATE
04 MAY 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52, C130, KC-135 / Power Supply
E. CONTRACT / PR NO.
FD20302000985
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Government Property Inventory Report
3. SUBTITLE
Annual Government Property Physical
4. AUTHORITY
DI-MGMT-80441C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
422 SCMS/GUME
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ANNLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Tate, Anthony DNAME: 01 MAY 2020DATE:
THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4:
a. All reports shall be submitted in the English Language.
2. Blocks 10, 11, 12, 13:
a. This report will be provided annually. Reporting Period is one year.
b. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the annual reporting period. If requested outside of an annual cadence, the data shall be current as of the date requested.
c. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.
3. Block 9:
a. DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only, critical technology. Other requests for this document shall be referred to 848 SCMG/EN.
b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:
EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended.
Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.
c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
4. Block 7, 14: Submit the Annual Government Property Physical Inventory Report to the following email address:
jeremy.marshall.5@us.af.mil
See Block 16 0 1 0
0 1 015. TOTAL
Page 3 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 13 May 2020
COORDINATORS:
Marshall, Jeremy P 422 SCMS / GUME 405-734-5839 / 884-5839 04 MAY 2020
G. PREPARED BY
Tate, Anthony D
424 SCMS / GUBAB
405-739-2266
H. DATE
04 MAY 2020
I. APPROVED BY
//DIGITALLY SIGNED//
TATE.ANTHONY.DON.1124023900
424 SCMS / GUBAB 405-739-2266 / 339-2266
J. DATE
04 MAY 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52, C130, KC-135 / Power Supply
E. CONTRACT / PR NO.
FD20302000985
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Counterfeit Prevention Plan (CPP)
3. SUBTITLE
CPP
4. AUTHORITY
DI-MISC-81832
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
422 SCMS/GUEA
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Tate, Anthony DNAME: 01 MAY 2020DATE:
THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS
Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, Critical Technology. Other requests shall be referred to 848 SCMG/EN.
Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
Destruction Notice for Unclassified Documents: destroyed by any method that will prevent disclosure of contents or reconstruction of the document.
Destruction Notice for Classified Documents: Follow the procedures in DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DOD 5220.0 I M, Information Security Program , Vol 3, Protection of Classified Information.
The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award. (FA8117)
Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).
DID Requirements NOT Tailored
Delivery CANNOT Be Deferred
COORDINATORS:
Marshall, Jeremy P 422 SCMS / GUME 405-734-5839 / 884-5839 04 MAY 2020
422 SCMS/GUEA
3001 Staff Drive Tinker AFB, OK 73145
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Tate, Anthony D
424 SCMS / GUBAB
405-739-2266
H. DATE
04 MAY 2020
I. APPROVED BY
//DIGITALLY SIGNED//
TATE.ANTHONY.DON.1124023900
424 SCMS / GUBAB 405-739-2266 / 339-2266
J. DATE
04 MAY 2020
Page 4 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 13 May 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52, C130, KC-135 / Power Supply
E. CONTRACT / PR NO.
FD20302000985
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Production Surge Plan
3. SUBTITLE
Capability Analysis Plan (CAP)
4. AUTHORITY
DI-MGMT-80969
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
422 SCMS/GUME
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Tate, Anthony DNAME: 01 MAY 2020DATE:
THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS
In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge, reference DFARs 217.208-70 and DFARs 252.217.7001), and invokes surge: The Contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements.
Block 9: Approved for Unlimited Public and Foreign Distribution. Other requests shall be referred to 848 SCMG/EN.
Block 10, 11, 12, 13: The Capability Analysis Plan (CAP) shall be prepared IAW DI-MGMT-80969 and shall be submitted 30 days after the contract award.
This Plan shall include a delivery schedule showing the maximum sustainable rate of delivery for items in this contract.
This delivery schedule shall provide acceleration by month up to the maximum sustainable rate of delivery achievable within the Contractor's existing facilities, equipment, and subcontracting structure. This Plan will address the surge capacity possible at no increase to the contract prices as well as the surge capacity possible at an additional cost. Based on this Plan, a mutually agreed to increase the quantity of supplies or services called for under this contract by no more than x % percent; and the accelerate the rate of delivery may be established for this contract, at a price or cost established after contract award or to be established by negotiation.
COORDINATORS:
Marshall, Jeremy P 422 SCMS / GUME 405-734-5839 / 884-5839 04 MAY 2020
422 SCMS/GUME
3001 Staff Drive, Annex 4,Suite 1AG1 92B Tinker AFB, OK 73115-3033 Attention : Jeremy Marshall
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Tate, Anthony D
424 SCMS / GUBAB
405-739-2266
H. DATE
04 MAY 2020
I. APPROVED BY
//DIGITALLY SIGNED//
TATE.ANTHONY.DON.1124023900
424 SCMS / GUBAB 405-739-2266 / 339-2266
J. DATE
04 MAY 2020
Page 5 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 13 May 2020
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52, C130, KC-135 / Power Supply
E. CONTRACT / PR NO.
FD20302000985
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Engineering Change Proposal (ECP)
3. SUBTITLE
N/A
4. AUTHORITY
DI-SESS-80639E
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
422 SCMS/GUEA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
See Block 16
10. FREQUENCY
ASREQ
11. AS OF DATE
As Required
12. DATE OF FIRST
SUBMISSION
As Required
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Tate, Anthony DNAME: 23 APR 2020DATE:
THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS
Blk 4: Contractor format or as 9102 format or equivalent is acceptable. The contract, CDRL number, document name, date of submission and document number shall appear on the first page of deliverable.
Blk 7: All inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.
Blk 8: Government written notice of approval/disapproval is 30 days after receipt of contractor's report.
Blk 9: DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies proprietary information (3 April 2020). Other requests for this document shall be referred to 848 SCMG/EN, Tinker Air Force Base, Oklahoma.
Control Warning Notice: WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Destruction notice for unclassified/limited documents: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
The above Distribution Statement, Warning, Destruction Notice shall be displayed or affixed to the data in a conspicuous position.
Blk 13: To be determined
COORDINATORS:
Marshall, Jeremy P 422 SCMS / GUME 405-734-5839 / 884-5839 04 MAY 2020
422 SCMS/GUEA
3001 Staff Drive, Annex 4 Tinker Air Force Base, Oklahoma 73145
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Tate, Anthony D
424 SCMS / GUBAB
405-739-2266
H. DATE
04 MAY 2020
I. APPROVED BY
//DIGITALLY SIGNED//
TATE.ANTHONY.DON.1124023900
424 SCMS / GUBAB 405-739-2266 / 339-2266
J. DATE
04 MAY 2020
Page 6 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 13 May 2020
File details come from the government source that posted it. Updated .