OH0195ZZ Dayton FB CTHSE Asbestos Notification Letter pdf.pdf

PDF 13 KB Posted

Attached to
Rice FB & USCH Elevator Services, Dayton Ohio Federal contract opportunity
Solicitation number
EQ5P2SS2F1-20-0001
Issued by
General Services Administration Public Buildings Service Region 5

View the file

Other files for this federal contract opportunity

Other files attached to Rice FB & USCH Elevator Services, Dayton Ohio, newest first.
File Type Posted
SF33-14c.pdf PDF
GSA527-15e.pdf PDF
SF30-16c.pdf PDF
RFP 47PF0020Q0241.pdf PDF
GSA R5 Electric Traction Elevator Checklist 08-2018.pdf PDF
Contractor Proposal Worksheet - Dayton Elevator.xls XLS spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 10/08/2020

Prospective Contractors (bidders), Pursuant to the Code of Federal Regulations all building owners are required to provide notification of the presence, location, and quantity of asbestos containing materials (ACM) and presumed asbestos containing materials (PACM) in their facilities. This notification is provided as a safeguard, to ensure prospective contractors (bidders) are aware of this information.

Asbestos containing material is present in the Federal Building and US Courthouse, Dayton

(OH0195ZZ) in the following forms, locations, and quantities:

Type Location Quantity

2' x 2' Ceiling Tile 9th Floor Courtroom 4050 sf

Roofing Material

Roof 20000 sf

Vibration Dampener

Penthouse Elevator Room, and B-11 3 sf

Pipe Wrap

VP3-1 through 8 96 lf

Floor Tile and Mastic Basement & 1st Floor Hallways, B-8 CORA, 2nd-4th & 6th-8th Floor Elevator & Stairwell Lobbies, and Rooms 133 & 210

1894 sf

If you have any questions, please contact

Rebecca A. Vaccari Contracting Officer Southern Services Contracting Team U.S. General Services Administration Acquisition Management Division

(513) 246-4411 (Office)

(513) 305-7063 (Cell)

Denotes material was not tested at the time of the most recent survey. Testing is not feasible in some cases as it would result in damage to the material or its structural components. In other cases, the material or area may not have been accessible. As such, the material must be presumed to be ACM based on its characteristics, age or other technical factors. Material is presumed to be ACM to ensure appropriate precautions and methods are employed when contemplating or executing activity that may disturb the material.