Engineering Data Requirements.pdf
PDF 12 KB Posted
- Attached to
- Viper Computer Test Component (FMS) Federal contract opportunity
- Solicitation number
- FA8212-20-R-0021
About this file
This document outlines engineering data requirements for the procurement of ruggedized notebook computers to support the F-16 Viper aircraft. The engineering data requirements specify that the computers shall meet specification MIL-STD-130 for marking, and that any deviations from control drawings or use of alternative materials must be approved in advance by the cognizant Air Force engineering activity. The related federal contract opportunity is a solicitation from Hill Air Force Base to provide an F-16 Viper Computer Test Component on a firm-fixed-price basis. Interested contractors must submit a source qualification request package unless they have been prequalified as a source. Award will be made only to a qualified source.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8212-20-R-0021-0002.pdf | ||
| FA8212-20-R-0021-0001.pdf | ||
| Qualification Requirements.pdf | ||
| Item Description.pdf | ||
| Engineerin Data List.pdf | ||
| Transportation Data.pdf | ||
| FA8212-20-R-0021.pdf | ||
| SOW.pdf | ||
| CDRL CPP.pdf | ||
| Packaging Requirements.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV: ENGINEERING DATA REQUIREMENTS
(ATTACHMENT “A”)
NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.
1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:
PORTABLE MAINTENANCE AID; COMPUTER, NOTEBOOK, RUGGEDIZED. F-16
2. PART NUMBER:
8546015-1
3. NATIONAL STOCK NUMBER:
4920-01-677-2063WF
PREPARED BY:
CURTIS BLANCO
OFFICE SYMBOL:
416 SCMS/GUEAA
DATE:
9 MAY 2019
HILL AFB FORM 462 Page 1 of 1
4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE
SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.
5. THE SOURCES/MATERIALS IF LISTED ON THE STANDARDS, SPECIFICATION AND DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT
ENGINEERING ACTIVITY.
6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR
APPROVAL BY THE COGNIZANT ENGINEERING ACTIVITY.
7. MARKING PER MIL-STD-130.
File details come from the government source that posted it. Updated .