Engineering Data Requirements (8884).pdf

PDF 40 KB Posted

Attached to
F-16 Cable Assembly Federal contract opportunity
Solicitation number
FA8212-20-Q-0018
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Cable Assembly, newest first.
File Type Posted
CDRL (8885).pdf PDF
Engineering Data Requirements (9786).pdf PDF
Transportation Data (8884).pdf PDF
SOW (9786).pdf PDF
FA8212-20-Q-0018.pdf PDF
Item Description (8884).pdf PDF
SOW (8884).pdf PDF
Transportation Data (9786).pdf PDF
IUID (8884).pdf PDF
Packaging Requirements (9786).pdf PDF
Engineering Data List (8885).pdf PDF
First Article (9786).pdf PDF
Qualification Requirements (9786).pdf PDF
Engineering Data List (8884).pdf PDF
Packaging Requirements (8884).pdf PDF
IUID (9786).pdf PDF
Item Description (9786).pdf PDF
Engineering Data Requirements (8885).pdf PDF
Qualification Requirements (8884).pdf PDF
Item Description (8885).pdf PDF
SOW (8885).pdf PDF
Packaging Requirements (8885).pdf PDF
CDRL (8884).pdf PDF
Engineering Data List (9786).pdf PDF
CDRL (9786).pdf PDF
Transportation Data (8885).pdf PDF
IUID (8885).pdf PDF
First Article (8884).pdf PDF
First Article (8885).pdf PDF
Qualification Requirements (8885).pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REV: ENGINEERING DATA REQUIREMENTS

(ATTACHMENT “A”)

NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.

1.THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:

CABLE ASSEMBLY,SPECIAL PURPOSE,ELECTRICAL

2. PART NUMBER:

8389754-1

3. NATIONAL STOCK NUMBER:

6150-01-555-8884

PREPARED BY:

Tim Lucas

OFFICE SYMBOL:

416 SCMS / GUEAA

DATE:

9 April 2018

HILL AFB FORM 462 Page 1 of 3

4. Deviations from specifications identified in drawings or this document are not authorized without prior approval by 416 SCMS/GUEAA Engineering.

5. IUID (Item Unique Identifier) requirements and expectations which the contractor must ensure are complied with.

a. Contractors drawings shall be changed or supplemented by contractor for IUID compliance.

b. Label shall contain all data on existing label, (if existing label is to be replaced), only delete existing label with government engineering permission.

c. Use HRI (Human Readable) and Machine Readable Matrix. (USAF not equipped to read barcode).

d. IUID Matrix needs to be highly visible, in a location easily accessible.

e. IUID marking must be permanent.

f. MIL-STD-130, ISO 15434, ISO 15415, and ISO 15418, (Part Marking as per MIL-STD-130 in lieu of FPS-3008)

i. IUID marking specifications.

1. Minimum 1/8 inch lettering on Human readable to include:

a. Cage (17V)

b. P/N (1P)

c. Serial Number (IS)

2. Minimum 1/4 inch square on Machine Readable 2D Matrix -construct 2 - to include

a. Cage (17V)

b. P/N (1P)

c. Serial Number (IS)

6. Part Marking as per MIL-STD-130 in lieu of FPS-3008.

7. Where the drawing calls for TWINAX contact per M39029/90 use COAX contact per M39029/60-367, see below:

HILL AFB FORM 462 Page 2 of 3

WAS:

HILL AFB FORM 462 Page 3 of 3

IS:

COAX CONTACT

PER M39029/60-367

2 PLACES

File details come from the government source that posted it. Updated .