EDR.pdf

PDF 77 KB Posted

Attached to
F-16 Cylinder Assembly, A Federal contract opportunity
Solicitation number
SPRHA4-26-Q-0211
Issued by
Defense Logistics Agency Aviation

About this file

This document is an Engineering Data Requirements form (Attachment "A") for a Cylinder Assembly Actuator, prepared by Bill Garcia from the 416 SCMS/GUEAA office at Hill Air Force Base on October 8, 2024. The form specifies technical manufacturing instructions for a specific part with National Stock Number 1650-01-417-8523WF and Part Number 1211262-006. Key requirements include: using specified sources/materials with prior approval for any substitutions, complying with Item Unique Identifier (IUID) expectations, and obtaining government engineering permission for any deviations from the established instructions.

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Cylinder Assembly, A, newest first.
File Type Posted
EDL.pdf PDF
MQR.pdf PDF
SOW.pdf PDF
SPRHA426Q0211.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REV: ENGINEERING DATA REQUIREMENTS

(ATTACHMENT “A”)

NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.

1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:

CYLINDER ASSEMBLY ACTUATOR

2. PART NUMBER:

1211262-006

3. NATIONAL STOCK NUMBER:

1650-01-417-8523WF

PREPARED BY:

BILL GARCIA

OFFICE SYMBOL:

416 SCMS/GUEAA

DATE:

October 8, 2024

HILL AFB FORM 462 Page 1 of 1

4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE

SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.

5. THE SOURCES/MATERIALS IF LISTED ON THE SPECIFICATION, STANDARDS AND DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. ANY SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT OO-

ALC ENGINEERING ACTIVITY.

6. IUID (ITEM UNIQUE IDENTIFIER) REQUIREMENTS AND EXPECTATIONS MUST BE COMPLIED WITH.

7. IF DEVIATIONS FROM THESE INSTRUCTIONS ARE REQUIRED OR DESIRED, PERMISSION FROM GOVERNMENT

ENGINEER IS REQUIRED.

File details come from the government source that posted it. Updated .