About this file

This is an Engineering Data Requirements document (Attachment A) specifying manufacturing requirements for an F-16 forward fuselage fuel tank (Part Number 16VB004002-7, NSN 1560-01-224-0803WF) for the Defense Logistics Agency Aviation.

The document outlines key manufacturing controls including: military specifications/standards will not be provided in the bid set, only listed sources/materials on standards and drawings are authorized, any substitutions or deviations require prior approval from the cognizant engineering activity, and marking must comply with MIL-STD-130. The document was prepared by George Slaughter of office 416 SCMS/GUEAA at Hill AFB on June 29, 2023.

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Fuel Cells, newest first.
File Type Posted
MQR.pdf PDF
SPRHA425R0383 CUI.pdf PDF
Unmarked Eng Data 2022.pdf PDF
CDRL_FATR.pdf PDF
SPI.pdf PDF
EDL.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REV: ENGINEERING DATA REQUIREMENTS

(ATTACHMENT “A”)

NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.

1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:

FUEL TANK - FUSELAGE TWO PL AIRCRAFT, FORWARD, REM. F-16

2. PART NUMBER:

16VB004002-7

3. NATIONAL STOCK NUMBER:

1560-01-224-0803WF

PREPARED BY:

GEORGE SLAUGHTER

OFFICE SYMBOL:

416 SCMS/GUEAA

DATE:

29 JUNE 2023

HILL AFB FORM 462 Page 1 of 1

4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE

SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.

5. THE SOURCES/MATERIALS IF LISTED ON THE STANDARDS, SPECIFICATION AND DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT

ENGINEERING ACTIVITY.

6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR

APPROVAL BY THE COGNIZANT ENGINEERING ACTIVITY.

7. MARKING PER MIL-STD-130.