EDR.pdf
PDF 225 KB Posted
- Attached to
- F-16 Cylinder Federal contract opportunity
- Solicitation number
- SPRHA425R0227
- Issued by
- Defense Logistics Agency Aviation
About this file
This is an Engineering Data Requirements (EDR) document for the manufacture of a hydraulic actuator (Part Number 16VH201-5, NSN 1650-01-417-8526WF) used in the F-16 main landing gear door/uplock system. The document, dated March 7, 2024, was prepared by the 416 SCMS/GUEAA office at Hill Air Force Base.
The EDR establishes key manufacturing requirements, specifically noting that military specifications/standards will not be furnished in the bid set. It mandates that sources and materials listed on standards, specifications, and drawings are the only authorized options, with substitutions requiring prior approval from OO-ALC Engineering. The document requires unique identification (UID) to be applied to each end-item per Drawing 16VH201, EO 12C0773-H, and explicitly prohibits any deviations from control drawing specifications without prior approval from OO-ALC Engineering (416 SCMS/GUEAA).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRHA425R0227 0001 CUI.pdf | ||
| EDL.pdf | ||
| MQR.pdf | ||
| SPRHA425R0227 CUI.pdf | ||
| Pkg_SOW.pdf | ||
| Unmarked Eng Data 2022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV: ENGINEERING DATA REQUIREMENTS
(ATTACHMENT “A”)
NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.
1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:
ACTUATOR ‐ HYDRAULIC, MLG DOOR/UPLOCK (F‐16)
2. PART NUMBER:
16VH201‐5
3. NATIONAL STOCK NUMBER:
1650‐01‐417‐8526WF
PREPARED BY:
BILL GARCIA
OFFICE SYMBOL:
416 SCMS/GUEAA
DATE:
7 MARCH 2024
HILL AFB FORM 462 Page 1 of 1
4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE SUPERSEDED DATA
WILL NOT BE FURNISHED UNLESS SO INDICATED.
5. THE SOURCE/MATERIAL IF LISTED ON THE STANDARDS, SPECIFICATION AND DRAWINGS ARE THE ONLY SOURCE/MATERIALS FOR THOSE ITEMS. SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY OO‐ALC COGNIZANT ENGINEERING ACTIVITY.
6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR APPROVAL
BY OO‐ALC ENGINEERING (416 SCMS/GUEAA).
7. UNIQUE IDENTIFICATION (UID) SHALL BE APPLIED TO EACH END‐ITEM PER DRAWING 16VH201, EO 12C0773-H.
File details come from the government source that posted it. Updated .