EDR.pdf

PDF 170 KB Posted

Attached to
F-16 PANEL, POWER DISTRIB Federal contract opportunity
Solicitation number
SPRHA4-24-Q-0274
Issued by
Defense Logistics Agency Aviation

About this file

This document outlines engineering data requirements for the manufacture of a Matrix Assembly for wing stores stations 4 and 6 on an F-16 aircraft. Key specifications and standards are identified for the manufacture of the part, including applicable military specifications and standards, soldering requirements using MIL-STD-2000, counterfeit prevention plans, and lead-free manufacturing notifications. The related federal contract opportunity is for six each of the same part, NSN 6110-01-591-3036, through the Defense Logistics Agency Aviation under solicitation SPRHA4-24-Q-0274 for an F-16 panel power distribution item.

View the file

Other files for this federal contract opportunity

Other files attached to F-16 PANEL, POWER DISTRIB, newest first.
File Type Posted
SOW.pdf PDF
CDRLCPP.pdf PDF
MQR.pdf PDF
EDL.pdf PDF
SPRHA424Q0274.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REV: ENGINEERING DATA REQUIREMENTS

(ATTACHMENT “A”)

NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.

1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:

MATRIX ASSY – WING STORES STA 4 & STA 6 (F-16)

2. PART NUMBER:

16E2503-867

3. NATIONAL STOCK NUMBER:

6110-01-591-3036WF

PREPARED BY:

JUSTIN ALLRED

OFFICE SYMBOL:

416 SCMS/GUEAA

DATE:

NOV. 28, 2023

HILL AFB FORM 462 Page 1 of 4

4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE SUPERSEDED DATA

WILL NOT BE FURNISHED UNLESS SO INDICATED.

5. THE SOURCES/MATERIALS IF LISTED ON THE STANDARDS, SPECIFICATIONS AND DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT ENGINEERING

ACTIVITY.

6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR APPROVAL

BY THE COGNIZANT ENGINEERING ACTIVITY.

7. THIS IS AN AIRCRAFT PART. USE THE APPROPRIATE PORTION OF MIL-STD-2000 THAT APPLIES TO AIRCRAFT SOLDERING FOR ALL SOLDERING REQUIREMENTS. *NOTE: J-STD-001 MAY BE USED IN LIEU OF MIL-STD-2000, IF

SPECIFICATION MEETS OR EXCEEDS MIL-STD-2000.

7.1 EFFECTIVE 9 MAY 2005 THE DEPARTMENT OF THE AIR FORCE ISSUED AN AIR WORTHINESS ADVISORY (M-05-01) REGARDING THE USE OF LEAD-FREE SOLDER IN ELECTRICAL AND ELECTRONIC MILITARY PRODUCTS. TO DATE, NO LEAD-FREE SOLDER FORMULATION HAS MATCHED THE RELIABILITY AND PERFORMANCE QUALITIES OF THE STANDARD LEADED SOLDERS. THEREFORE, UNTIL SUCH TIME AS A SUITABLE, RELIABLE LEAD-FREE SOLDER REPLACEMENT IS IDENTIFIED, ALL ELECTRONIC EQUIPMENT SUPPLIERS SHALL CONTINUE TO PROVIDE THE DEPARTMENT OF THE AIR FORCE WITH ITEMS WHICH MEET ALL PERFORMANCE, COMPATIBILITY, AND RELIABILITY STANDARDS PREVIOUSLY ESTABLISHED WITH LEADED SOLDERS. FAILURE TO DO SO, COULD ADVERSELY IMPACT THE

PERFORMANCE AND RELIABILITY OF WEAPON SYSTEMS AFFECTING NATIONAL SECURITY.

7.2 THE USE OF LEAD-FREE SOLDER OR LEAD-FREE PLATED COMPONENTS IN MILITARY ELECTRONIC PRODUCTS IS CONSIDERED A FLIGHT SAFETY AND NATIONAL SECURITY CONCERN. FOR THIS REASON THE US AIR FORCE WANTS TO BE NOTIFIED WHEN LEAD-FREE COMPONENTS AND MANUFACTURING PROCESSES HAVE BEEN IMPLEMENTED. AS PART OF SATISFACTORY COMPLIANCE WITH THE REQUIREMENTS OF THIS CONTRACT THE US AIR FORCE REQUIRES

NOTIFICATION ON A NO-COST BASIS WHEN ANY OF THE FOLLOWING CONDITIONS EXIST:

1. COMMERCIAL OFF-THE-SHELF (COTS) OR ANY OTHER ELECTRICAL COMPONENTS THAT CONTAIN LEAD-

FREE SOLDER OR LEAD-FREE PLATED COMPONENTS ARE USED IN THE END-ITEM.

2. ANY LEAD-FREE COMPONENT OR PART USED TO MANUFACTURE THE END ITEM THAT IS NOT IDENTIFIED

WITH A SEPARATE PART NUMBER OR DESIGNATION.

7.3 IF NO LEAD-FREE, LEAD-FREE PLATED COTS OR ANY OTHER LEAD-FREE ELECTRICAL OR ELECTRONICS COMPONENTS EXIST IN THE MANUFACTURED END-ITEM, THE CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION

OF COMPLIANCE AS A DELIVERABLE WITH THE CONTRACT.

1. USE INDUSTRY STANDARD IPC-1066, "MARKING, SYMBOLS AND LABELS FOR IDENTIFICATION OF LEAD- FREE AND OTHER REPORTABLE MATERIALS IN LEAD-FREE ASSEMBLIES, COMPONENTS AND DEVICES,"

2. INCLUDE THE PROGRAM ENGINEER'S EVALUATION OF THE PURCHASING/REPAIR ITEM FOR ANY "LEAD- FREE" MILITARY PART(S) IN REFERENCE TO ITS' RELIABILITY, PERFORMANCE AND COMPATIBILITY FOR

THE SYSTEM.

7.4. 16PR106 IS NOT FURNISHED, BRAID PER 16PR8817 IF APPLICABLE. USE 1200 WEIGHT GREEN THREAD WHEN 200

WEIGHT THREAD IS EXHAUSTED.

HILL AFB FORM 462 Page 2 of 4

7.5. USE 16PR8817 IN CONJUNCTION WITH 16PR145 FOR THE MANUFACTURE OF THIS ITEM.

7.6. 16PR145, REVISION “G”, PAGE 7, PARAGRAPH 3.2.3.2, REFERRING TO THE USE OF WHITE TUBING, DOES NOT APPLY

TO THE MANUFACTURE OF THIS ITEM.

7.7. THE SOURCE FOR ANTI-SABOTAGE LACQUER (MATERIAL 114-136305) IF REQUIRED IS AVAILABLE FROM:

Organic Products Company

CAGE 01195,

PO Box 560625 Dallas, Texas 75356-0625 .

UNDER THE NAME "TORQUE SEAL" TORQUE SEAL (F-900), COLOR RED

8. COUNTERFEIT PREVENTION PLAN (CPP). CONTRACTORS THAT SUPPLY ELECTRONIC PARTS OR SYSTEMS THAT CONTAIN ELECTRONIC PARTS SHALL ESTABLISH POLICIES AND PROCEDURES TO AVOID, DETECT, MITIGATE AND DISPOSITION COUNTERFEIT ELECTRONIC PARTS TO PREVENT SUCH PARTS FROM ENTERING THE USAF/DOD SUPPLY CHAIN. THESE POLICIES AND PROCEDURES SHALL BE DOCUMENTED IN A CPP FOR SUBMISSION AND APPROVAL IN ACCORDANCE WITH DATA ITEM DESCRIPTION (DID) DI-MISC-81832 AND ACCOMPLISHED FOR ALL SPECIFIED CONTRACT ITEMS. DI-MISC-81832 IS APPLICABLE TO PARTS, MATERIAL AND PROCESSES SELECTION (PMPS) ASSOCIATED WITH DELIVERY OF SYSTEMS AND ASSEMBLIES TO THE USAF AND DOD. THE REQUIREMENTS ESTABLISHED BY DI-MISC-81832 ALSO APPLY TO ELECTRONICS COMPONENTS PROCURED IN SUSTAINMENT OF SUCH SYSTEMS AND ASSEMBLIES. THE REQUIREMENTS OF THE RECENTLY DOD-ADOPTED SAE 5553, AEROSPACE STANDARD, COUNTERFEIT ELECTRONICS

PARTS; AVOIDANCE, DETECTION, MITIGATION, AND DISPOSITION SHALL ALSO APPLY.

9.0. AT A MINIMUM, THE CPP SHALL ADDRESS:

9.1. APPLICABILITY. THE CONTRACTOR SHALL IDENTIFY ALL BUSINESS LOCATIONS AND PROGRAMS TO WHICH THE CPP APPLIES. THE CPP SHALL ADDRESS MATERIALS, HARDWARE, ELECTRONIC PARTS, AND PROCURED ASSEMBLIES.

9.2. DEFINITIONS. THE CONTRACTOR SHALL UTILIZE DEFINITIONS PER AS 5553 TO ENSURE CONSISTENCY. ANY CONTRACTOR DERIVED DEFINITIONS MUST BE INCLUDED IN AN APPROPRIATE CPP APPENDIX OR ANNEX. (REF. AS5553, PARAGRAPH 3, 3.1, 3.2, 3.3, APPENDIX H)

9.3. PARTS AVAILABILITY AND USE OF PARTS BROKERS. THE CONTRACTOR SHALL NOT PROCURE MATERIALS, SYSTEMS, ASSEMBLIES, SUBASSEMBLIES OR PARTS FROM PARTSBROKERS WHEN AVAILABLE FROM ORIGINAL MANUFACTURERS (OM) OR THEIR AUTHORIZED DISTRIBUTORS. IN CASES WHERE MATERIALS, SYSTEMS, ASSEMBLIES, SUBASSEMBLIES OR PARTS ARE NO LONGER AVAILABLE FROM THE OM OR THEIR AUTHORIZED DISTRIBUTORS, PROCUREMENT FROM BROKERS MAY BE AUTHORIZED AS DEFINED BY THE CONTRACTOR'S POLICY AND THEIR CPP.

(REF. AS5553, PARAGRAPH 4.1.1, 4.1.2.E., APPENDIX A)

9.4. PROCUREMENT POLICIES. THE CONTRACTOR SHALL PROVIDE AND IMPLEMENT POLICY DIRECTING DEVELOPMENT AND IMPLEMENTATION OF BUSINESS PRACTICES AND PROCEDURES, AND PROCESSES TO PREVENT PROCUREMENT OF COUNTERFEIT MATERIALS AND PARTS. THE CONTRACTOR SHALL IDENTIFY THE APPROPRIATE OFFICE(S), BUSINESS UNITS, FUNCTIONAL ORGANIZATIONS, AND PROGRAMS, WHO SHALL HAVE RESPONSIBILITY FOR DEVELOPMENT, MAINTENANCE, AND IMPLEMENTATION OF THE CPP. THE CPP SHALL IDENTIFY THE SPECIFIC ROLES AND

RESPONSIBILITY FOR EACH. (REF. AS5553, PARAGRAPH 4.1.2, 4.1.3, APPENDIX B, C, D)

HILL AFB FORM 462 Page 3 of 4

9.4.1 RISK ASSESSMENT. THE CONTRACT SHALL ADDRESS THE RISK OF USING UNKNOWN SOURCES AND OR UNAUTHORIZED SUPPLIERS IN THE CPP. APPLICATION OR TECHNICAL RISK ASSESSMENTS SHALL ESTABLISH THE EFFECT THAT COUNTERFEIT PARTS MAY HAVE ON PERFORMANCE. VENDOR OR SOURCE OF SUPPLY RISK ASSESSMENTS SHALL ESTABLISH THE POTENTIAL FOR OBTAINING COUNTERFEIT PARTS. USING ANY RISK ANALYSIS TOOL ACCEPTABLE TO THE GOVERNMENT, THE CONTRACTOR SHALL CONDUCT A RISK ASSESSMENT BASED UPON ITEM CHARACTERISTICS AND HOW LIKELY IT IS THAT A COUNTERFEIT PART WILL BE RECEIVED. THE CONTRACTOR SHALL IDENTIFY AND DESCRIBE IN THE CPP HOW PARTS ARE SELECTED FOR ASSESSMENT AND WHAT RISK IS ACCEPTABLE BASED UPON THE PARTS DESIGN, CONSTRUCTION, MATERIAL AND FUNCTIONAL REQUIREMENTS. AS A MINIMUM, ANALYSIS SHALL BE COMPLETED FOR FLAGGING HIGH RISK ITEMS, SUCH AS ITEMS THAT ARE OBSOLETE, DISCONTINUED, RARE, ETC. THE CONTRACTOR SHALL REQUIRE COMPLETION OF A TRADE STUDY, DOCUMENTED WITHIN THE CPP, THAT SHALL FACILITATE DETERMINING WHETHER 100% TESTING OF PARTS PROCURED FROM AFTER- MARKET SOURCES IS MORE COST EFFECTIVE THAN QUALIFICATION OR REQUALIFICATION OF A MANUFACTURER. (REF.

AS5553, PARAGRAPH 4.1.2, 4.1.3, APPENDIX B, C, D)

9.5. DETECTION AND AVOIDANCE RESPONSIBILITIES. THE CONTRACTOR SHALL ESTABLISH PROCESSES FOR THE REVIEW AND APPROVAL OF CONTRACTOR AND APPLICABLE SUBCONTRACTOR SYSTEMS FOR THE DETECTION AND AVOIDANCE OF COUNTERFEIT ELECTRONIC PARTS AND SUSPECT COUNTERFEIT ELECTRONIC PARTS, WHICH PROCESSES SHALL BE COMPARABLE TO THE PROCESSES ESTABLISHED FOR CONTRACTOR BUSINESS SYSTEMS UNDER SECTION 893 OF THE IKE SKELTON NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2011 (PUBLIC LAW 111- 383; 124 STAT. 4311; 10 U.S.C. 2302 NOTE). THE CONTRACTOR SHALL FLOW DOWN SUCH REQUIREMENTS AND PROCESSES TO THEIR SUBCONTRACTORS PER ODASD MEMO TITLED "OVERARCHING DOD COUNTERFEIT PREVENTION GUIDANCE", DATED 16 MARCH 2012. (REF. AS5553, PARAGRAPH 4.1.4, 4.1.5, APPENDIX E)

9.6. TESTING AND VERIFICATION. THE CONTRACTOR SHALL ESTABLISH AND ACCOMPLISH TESTING AND VERIFICATION PROCESSES FOR ITEMS NOT RECEIVED FROM AN ORIGINAL EQUIPMENT MANUFACTURER, ORIGINAL COMPONENT MANUFACTURER, OR AUTHORIZED DISTRIBUTOR THAT ARE IDENTIFIED AS HAVING HIGH RISK FOR COUNTERFEIT POTENTIAL. THESE PROCESSES APPLY TO PRIME CONTRACTS, AND TO SUBCONTRACTS OR SUPPLIERS BELOW THE PRIME CONTRACTS. THE CONTRACTOR SHALL PROVIDE A LIST OF ACCEPTABLE TEST FACILITIES IF THE SUBCONTRACTOR OR SUPPLIER DOES NOT HAVE THE CAPABILITY TO PERFORM REQUIRED TESTING. SUBMITTAL OF CERTIFICATES OF COMPLIANCE INDICATING THE PARTS ARE NOT COUNTERFEIT SHALL BE ACCEPTABLE FOR

VERIFICATION OF TESTING. (REF. AS5553, PARAGRAPH 4.1.4, APPENDIX E)

9.7. CONFIGURATION IDENTIFICATION AND TRACEABILITY. THE CONTRACTOR SHALL IDENTIFY AND CONTROL THE CONFIGURATIONS OF ALL SYSTEMS, ASSEMBLIES, SUBASSEMBLIES AND PARTS, AND ENABLE MECHANISMS TO PROVIDE TRACEABILITY OF PARTS. THE CONTRACTOR SHALL REPORT TO THE GOVERNMENT WHEN CONTROL OF THE CONFIGURATIONS OF ALL SYSTEMS, ASSEMBLIES, SUBASSEMBLIES AND PARTS, AND MECHANISMS TO PROVIDE TRACEABILITY OF PARTS ARE NOT POSSIBLE. THE CONTRACTOR SHALL IDENTIFY THE SPECIFIC SYSTEMS, ASSEMBLIES, SUBASSEMBLIES AND PARTS BEYOND THE CONTRACTORS' CONTROL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETECTING AND AVOIDING THE USE OR INCLUSION OF COUNTERFEIT MATERIALS AND PARTS, TO INCLUDE PROCURED ASSEMBLIES AND SUBASSEMBLIES, IN SUCH PRODUCTS AND SHALL BE RESPONSIBLE FOR THE REWORK OR CORRECTIVE ACTION THAT MAY BE REQUIRED TO RESOLVE THE USE OR INCLUSION OF COUNTERFEIT MATERIALS AND PARTS. THE COST OF COUNTERFEIT ELECTRONIC PARTS AND SUSPECT COUNTERFEIT ELECTRONIC PARTS AND THE COST OF REWORK OR CORRECTIVE ACTION THAT MAY BE REQUIRED TO REMEDY THE USE OR INCLUSION OF SUCH PARTS ARE NOT ALLOWABLE COSTS UNDER DEPARTMENT CONTRACTS , UNLESS: A) THE CONTRACTOR HAS ESTABLISHED A COUNTERFEIT AVOIDANCE/DETECTION SYSTEM APPROVED BY THE DOD, B) THE COUNTERFEIT PARTS WERE PROCURED FROM A DOD-ACCREDITED TRUSTED SUPPLIER OR PROVIDED AS GOVERNMENT PROPERTY, AND C) THE CONTRACTOR HAS PROVIDE TIMELY NOTIFICATION TO THE GOVERNMENT. (REF. AS5553, PARAGRAPH 4.1.6, APPENDIX F)

HILL AFB FORM 462 Page 4 of 4

9.8. COUNTERFEIT NOTIFICATION AND REPORTING. THE CONTRACTOR SHALL REPORT IN WRITING TO THE PROCURING ACTIVITY WITHIN 30 DAYS OF DETERMINING ANY END ITEM, COMPONENT, PART, OR MATERIAL CONTAINED IN SUPPLIES PURCHASED BY THE DEPARTMENT OF DEFENSE, OR PURCHASED BY A CONTRACTOR OR SUBCONTRACTOR FOR DELIVERY TO, OR ON BEHALF OF, THE DEPARTMENT, CONTAINS COUNTERFEIT ELECTRONIC PARTS OR SUSPECT COUNTERFEIT ELECTRONIC PARTS FOR THE PURPOSE OF INVESTIGATION AND NOTIFICATION OF THE AIR FORCE OFFICE OF SPECIAL INVESTIGATIONS (AFOSI). THE PROCURING CONTRACTING OFFICER (PCO) SHALL COORDINATE REPORTING TO THE APPROPRIATE PROGRAM MANAGEMENT/ITEM MANAGEMENT, SYSTEM ENGINEERING MANAGEMENT, THE AFMC DISCREPANT MATERIEL REPORTING PROGRAM (DMRP) OFFICE IN 406 SCMS/GULAB, AND THE AFOSI. ADDITIONALLY, THE CONTRACTOR SHALL WITHIN THE SAME 30-DAY PERIOD ENSURE ALL SUSPECTED OR CONFIRMED COUNTERFEIT ITEMS ARE ENTERED INTO THE GOVERNMENT-INDUSTRY DATA EXCHANGE PROGRAM (GIDEP) SYSTEM, WHICH WILL SERVE AS THE DOD CENTRAL REPORTING REPOSITORY. (REF. AS5553, PARAGRAPH 4.1.7, APPENDIX G)

9.9. COUNTERFEIT PREVENTION TRAINING. THE CONTRACTOR SHALL PROVIDE APPROPRIATE TRAINING AND SHALL REQUIRE ALL PERSONNEL WORKING PROCUREMENT WITHIN THEIR COMPANY, TO INCLUDE AT A MINIMUM THEIR SUPPLY CHAIN MANAGEMENT SPECIALISTS, RECEIVING INSPECTORS, AND ENGINEERS, TO COMPLETE SAID TRAINING.

THE CONTRACTOR SHALL DETERMINE THE APPROPRIATE TRAINING REQUIRED. TRAINING MAY BE DEVELOPED IN- HOUSE OR MAY BE OTHER INDUSTRY ACCEPTED TRAINING. THE CPP SHALL DESCRIBE AND LIST THE TRAINING

PROVIDED BY THE CONTRACTOR TO THEIR PERSONNEL.

File details come from the government source that posted it. Updated .