EDL.pdf

PDF 55 KB Posted

Attached to
STATOR TUBE, TORQUE Federal contract opportunity
Solicitation number
SPRHA1-23-Q-0291
Issued by
Defense Logistics Agency Aviation

View the file

Other files for this federal contract opportunity

Other files attached to STATOR TUBE, TORQUE, newest first.
File Type Posted
CDRL.pdf PDF
SPI.pdf PDF
SOW.pdf PDF
CUI - SPRHA1-23-Q-0291.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING DATA LIST

DATE:

10 AUG 2020

REVISION: 3 *HISTORY*

CAGE:

0B9R9

PAGE:

NSN:

1630001024365

DATA TECH:

Nelson, Boston B

END ITEM:

C-130 LANDING GEAR

ORGANIZATION/OFFICE SYMBOL:

429 SCMS GUMAC/

MANUFACTURER NAME:

MEGGITT AIRCRAFT BRAKING SYSTEMS

REFERENCE NUMBER:

9550151-1

NOUN:

STATOR TUBE,TORQUE,

LINE/

SUB CAGE

ENG DRAWING NUM/ ACCOMP

DOC NUM REV

NR

SHEETS

FURN

CODE

DIST

CODE NOUN REMARKS

L 98747 201416605 C S D LANDING GEAR

REQUIREMENTS DOCUMENT

Nelson, Boston B 10 AUG 2020

REFERENCE PARAGRAPH 5.2 FOR MATERIAL REVIEW BOARD (MRB).

NAME: DATE:

STANDARD ENGINEERING TEXT

Nelson, Boston B 10 AUG 2020

RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.

THE ENGINEERING NOTES ARE PROVIDED ON AIR FORCE DRAWING 201416605, CAGE CODE 98747, AND ADVANCED ENGINEERING SUPPLEMENTAL ORDER(S) (AESO'S). THE HILL AFB FORM 462, ENGINEERING DATA REQUIREMENTS (ATTACHMENT A /ENGINEERING INSTRUCTIONS) ARE NO LONGER UTILIZED FOR LANDING GEAR AND WILL NOT BE PROVIDED. ALL PREVIOUS LANDING GEAR VERSIONS OF THE HILL AFB FORM 462 FOR THIS NATIONAL STOCK NUMBER (NSN) HAVE BEEN SUPERSEDED AND WILL NOT BE UTILIZED FOR MANUFACTURE OF THIS

COMPONENT/ASSEMBLY.

NAME: DATE:

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH

CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING; (NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR MUST ACQUIRE.

A- DATA NOT AVAILABLE.

FURNISHED METHOD CODE LEGEND:

Page 1 of 1EDL Version 3Generated by PRPS using Jasper Reports on 12 Apr 2023

File details come from the government source that posted it. Updated .