EAO Electrician RFP.docx

DOCX document 12 KB Posted

Attached to
Install 220V plug, remove 110v ceiling drop downs. State and local contract opportunity
Solicitation number
S-X21600-00013088
Issued by
Lane County, Oregon

About this file

This Scope of Work is for the Eugene Area Office (New) project, located in Eugene, Oregon, involving electrical renovation and upgrade work. The project requires installing a 220v electric plug for an oven, a 110v electric plug for a hood fan, relocating 1-2 plug-ins, removing ceiling drop-down plugs, and replacing existing fluorescent lighting with LED bulbs. The work involves pulling new wire, installing conduit, and ensuring compliance with current state and federal electric codes. The contractor will be responsible for complete disposal, haul-away, and site cleanup, maintaining a clean and accessible work area for other contractors and CTSI employees.

The bid requires a bid guarantee equivalent to 20% of the bid price, which can be submitted as a bid bond, certified check, bank draft, or US Government Bonds at par value. Contractors must include a Certificate of Insurance (COI) with their proposal. Questions or issues related to the project should be directed to Public Works Director Syd Somes at 541-351-0141. The scope of work appears to be a specific electrical upgrade project for a single office location, with emphasis on modernization, safety, and code compliance.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This Scope of Work is for Eugene Area Office (New) project located at 2892 Crescent Ave. Eugene Or. 97408.

Install 220v electric plug (oven), 110v electric plug Hood fan for oven), relocate 1 or 2 plug –ins, remove ceiling drop down plug 3 or 4.

Moving 1 or 2 plug-in outlets from their current location to another location within same office. This is to accommodate installation of additional entrance/exit door for this office.

Remove existing ceiling drop down 110v plugs and wiring.

Remove old florescent bulbs and install new LED bulb that are ballast bypass direct wire bulbs, re-using existing lighting fixtures.

Includes pulling wire install new conduit and wiring with plugs for break room oven and hood fan. Current electric codes will be followed both state and federal. Contractor is responsible for disposal/haul away and clean-up when work has been completed.

The work area will be kept clean and accessible for other contractors and employees of CTSI. Any questions or problems will be directed to the Public Works Director Syd Somes at 541-351-0141.

Please include COI and proof of a bid guarantee equivalent to 20% of the bid price. This bid guarantee can be in the form of a bid bond, certified check, bank draft or US Government Bonds at par value.

File details come from the government source that posted it. Updated .