Dye-Pen mchine Specification 15-21-6625.docx

DOCX document 40 KB Posted

Attached to
Dye Penetrant Inspection System Federal contract opportunity
Solicitation number
W911PT21Q0079
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

This document is a federal government equipment specification outlining requirements for a new dye penetrant inspection system. The specification calls for a nine-station machine approximately 35 feet in length to inspect mortar components at the Watervliet Arsenal. Each station performs a separate function such as submerging components in penetrant, washing with water, heating to dry, applying developer, and inspecting for cracks. The contractor must install the system by a specified date, provide training and warranty support, and demonstrate the system meets the specification through sample inspections. The solicitation number, agency, and anticipated award date are provided to procure this system in accordance with the attached specification requirements.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15-21-6625

U.S. ARMY

Watervliet Arsenal Watervliet, NY Equip. Eng. Spec #15-21-6625 Date: 7 June, 2021

New Dye Penetrant Inspection System

Abbreviated Description: The equipment purchased by this specification shall be a new Gould Bass UA-304 Dye Penetrant Inspection System or equal with the option for a second machine. The machine shall consist of nine connected stations with the capacity to inspect the Watervliet Arsenal’s mortar components.

Machine Stations: The machine shall consist of nine consecutive and connected stations. These stations will be connected in a straight line and will together be approximately 35’ in length. The height and width of each station will be specified below. Any station requiring connection to an electrical outlet shall be 110 VAC ±10%, 1 phase (Ø), 60 Hz, and any station requiring connection to a bus bar shall be 480 VAC ±10%, 3 phase (Ø), 60 Hz.

Station One – Penetrant Dip Station: Station one shall be a Gould Bass Model UAP-304S or equal with the function to process mortar components using the penetrant dip method by submerging them in the penetrant and then setting them to drain for a certain amount of time. This station shall require 1/2" air at 85 psi. The details and dimensions of station one are listed below.

· Tank constructed of 16 gauge stainless steel mounted in a painted two inch mild steel tubular frame

· Pneumatically operated lowerator capable of handling up to 300 pounds of load

· Full roller grille consisting of 1.9” diameter stainless steel rollers at 4” centers with non-corrodible bearings

· Complete set of manual controls that lower and raise the mortar components into and out of the penetrant

· Bi-folding stainless steel lid

· Centered drain valve capable of complete drainage

· Outer station length: 48”

· Outer station width: 46”

· Overall station height: 84”

· Working height: 36”

· Inner tank length: 44”

· Inner tank width: 35”

· Working tank depth (measured from the top of the rollers when they are in the down position to the top of the tank): 26”

· Roller grille length: 41”

· Roller griller width: 30-1/8”

· Drain valve size: 3/4”

Station Two – Drain Station: Station two shall be a Gould Bass Model UAB-304S or equal with the function to drain the penetrant from the mortar components. The details and dimensions of station two are listed below.

· Canted stainless steel drain pan and mild steel frame

· Full roller grille consisting of 1.9” diameter stainless steel rollers at 4” centers with non-corrodible bearings

· Plumbed to drain to station one

· Station length: 48”

· Station width: 36”

Station Three – Wash Station: Station three shall be a Gould Bass Model UAW-304 or equal with the function to wash the mortar components with pressurized water. This station shall require 1/2” water line at required temperature, 1/2" air at 85” and a suitable drain. The details and dimensions of station three are listed below.

· Constructed of 16 gauge stainless steel and mounted in a two inch mild steel tubular frame

· Fitted with a full stainless steel backsplash and a cantilevered roof

· Full roller grille consisting of 1.9” diameter stainless steel rollers at 4” centers with non-corrodible bearings

· Pneumatically operated vertically lifting doors at each end which can open to 30 inches and are fitted with mechanical safety stops to prevent the door from dropping in the event of a pneumatic or cable failure

· Drain above the floor on the back of the tank that is capable of complete draining

· Tri-Con wash gun or equal with six feet of hose fitted with a water and pressure regulator, as well as temperature gauges

· Side curtains on an overhead extension with side moving entrance curtains

· Front mounted controls

· A rinse gun with a hose coming from the mixer valve on the back of the station

· Water temperature and pressure gauges mounted on the upper portion of the back splash.

· Solid roof mounts for twin REL UV-4000 lights or equal

· A switchable 120V outlet on the roof for the overhead light

· An ON/OFF switch for the overhead light located at the front of the station

· A hand-held REL UV-3000 RV/WL lamp or equal

· A swivel mount for the REL UV-3000 UV hand help lamp or equal

· Outer station length: 48”

· Outer station width: 58” (includes a 22” extension for the machine operator)

· Overall station height: 84”

· Inner tank length: 44”

· Inner tank width: 32”

· Inner tank depth: 30”

· Roller grille length: 41”

· Roller griller width: 30-1/8”

· Drain size: 1-1/4”

· Drain height (above floor): 6”

Station Four – Drain Station: Station four shall be a Gould Bass Model UAB-304S or equal with the function to drain the water from the mortar components. The details and dimensions of station four are listed below.

· Canted stainless steel drain pan and mild steel frame

· Full roller grille consisting of 1.9” diameter stainless steel rollers at 4” centers with non-corrodible bearings

· Plumbed to drain to station three

· Station length: 48”

· Station width: 36”

Station Five – Dryer Station: Station five shall be a Gould Bass Model UAD-305D or equal with the function to dry the mortar components using recirculating hot air. Temperature settings shall be set on digital controls at the front of the station. These controls shall hold the temperature with ±10°F everywhere in the chamber and the dryer should provide ~2 air changes per minute to prevent humidity build up. A warm up period of 10 minutes shall be required to reach the preset temperature. This station shall require 1/2” air at 85 psi. The details and dimensions of station five are listed below.

· Constructed of mild steel, double-walled with glass insulation

· Pneumatically operated vertically lifting doors at each end which can open to 30 inches and are fitted with mechanical safety stops to prevent the door from dropping in the event of a pneumatic or cable failure

· 24” x 24” swing out door equipped to the front of this station

· Electrically heated recirculating design with a digital thermostat mounted externally to the unit

· 9000-watt heaters to maintain a temperature of 140°F

· Secondary over-temperature circuit set at 160°F

· Full roller grille consisting of 1.9” diameter stainless steel rollers at 4” centers with non-corrodible bearings

· Outer length: 60”

· Outer width: 36”

· Overall height: 84”

· Working height: 36”

· Inner length: 56”

· Inner width: 32”

· Inner depth: 40”

Station Six – Rest Station: Station six shall be a Gould Bass Model UAR-302 with the function to let the mortar components rest and cool after being heated. The details and dimensions of station six are listed below.

· Painted tubular frame structure

· Full roller grille consisting of 1.9” diameter stainless steel rollers at 4” centers with non-corrodible bearings

· Station length: 24”

· Station width: 36”

Station Seven – Dry Developer Station: Station seven shall be a Gould Bass Model UADD-305TI or equal with the function to draw excess developer and overspray from non-aqueous developer aerosol cans. The controls for this station shall include those for lights, vertical lifting doors, and the dust collector. This station shall require 1/2" air at 85 psi. The details and dimensions of station seven are listed below.

· Constructed of painted 16 gauge mild steel with a two inch tubular frame construction

· Pneumatically operated vertically lifting doors at each end which can open to 30 inches and are fitted with mechanical safety stops to prevent the door from dropping in the event of a pneumatic or cable failure

· Full roller grille consisting of 1.9” diameter stainless steel rollers at 4” centers with non-corrodible bearings

· Filtered rear extraction plenum

· Dust collector for extraction and collection of excess powder

· Ceiling mounted white light fixture

· Outer length: 60”

· Outer width: 36”

· Overall height: 84”

· Inner length: 56”

· Inner width: 32”

· Roller grille height: 36”

Station Eight – Rest Station: Station eight shall be a Gould Bass Model UAR-302 or equal with the function to let the mortar components rest after dry developer is applied. The details and dimensions of station eight are listed below.

· Painted floor mounted tubular frame structure with a steel dust pan

· Full roller grille consisting of 1.9” diameter stainless steel rollers at 4” centers with non-corrodible bearings

· Roller grille working height: 36”

· Station length: 24”

· Station width: 36”

Station Nine – Inspection Station: Station nine shall be a Gould Bass Model UAC-305R or equal with the function to inspect the mortar components after resting. This station shall have the necessary switches located at the front of the station to control the ventilation fan, overhead white light, and overhead U.V. lights. The details and dimensions of station nine are listed below.

· 2” tubular frame structure

· Full roller grille consisting of 1.9” diameter stainless steel rollers at 4” centers with non-corrodible bearings

· Front curtains of the station split into sections and on roller tracks to allow them to be moved side to side

· Full enclosure of flame retardant curtains

· Flame retardant split curtains at the entrance and exit of the station

· Overhead extraction fan

· Overhead white light fixture

· Solid roof with overhead REL profusion (triple) mounts or equal

· Swivel mounts for two REL UV-3000 UV/WL lamps

· Split curtain for entry and exit

· Operator switch panel to control the fan, white light, and REL Profusion overhead light or equal

· Quad outlet box inside of the booth into which a REL UV-3000 hand held light or equal can be plugged into

· Outer length: 60”

· Outer width: 58”

· Overall height: 84”

· Inner length: 56”

· Inner width: 32” (includes a 22” overhang for the operator)

· Working height: 36”

Machine Accessories: This machine shall come with the additional accessories:

· TAM Panel

· Met-L-Chek FP-923 Level III, Water Wash Fluorescent Penetrant or equal: One 55 Gallon Drum

· Met-L-Chek D-70 Developer or equal: One case of 16 ounce cans (12 cans per case)

· Met-L-Chek E-59A Cleaner or equal: One case of 16 ounce cans (12 cans per case)

Work to be Performed by the Contractor: This project is classified as a turn-key with the contractor being responsible for all-work associated with the installation. The Contractor shall be solely responsible for costs associated with skidding and shipment, rigging and installation at WVA. The contractor is responsible for the removal of wood block flooring for the footprint of the machine. If any anchoring is needed, it is the contractor’s responsibility. The contractor shall also provide competent English speaking service personnel to install the machine, rough and finish level the machine, startup, and conduct the acceptance tests specified. The contractor personnel shall remain until the machine activation and testing have been successfully completed. Watervliet Arsenal personnel will not provide assistance for installation, diagnosis, troubleshooting, or repair of the equipment during activation and testing. WVA is responsible for hooking up electricity to the machine. Note: It is preferred to not drill into the concrete floor. Typical floor thickness at Watervliet is 8”-10”.

Contractor personnel shall coordinate the shipment of the machine to Watervliet. Contractor personnel shall arrange for rigging services to off load the machine and contractor personnel shall be on-site at Watervliet when the machine arrives and is off loaded. The Contractor shall ensure any outside rigging services only use certified chain hoists, with all rigging slings tagged and certified for the weights being lifted. Contractor personnel shall supervise the placement of the machine on the installation site by the rigging service. Arsenal forklifts and Arsenal personnel are typically not available to assist with installation. All forklifts used shall be propane powered forklifts and equipped with a roll cage and backup signal. Operators of forklifts shall have and be able to produce valid forklift licenses. Arsenal overhead pendant cranes (within load capacities) may be used by the contractor/rigging service for the installation to be operated by Arsenal personnel. Crane capacity within each building is limited (2 tons). The Contractor shall provide alternate lifting means if installation tasks exceed capacity. Contractor personnel shall also adhere to the WVA requirements to wear OSHA approved safety glasses and safety shoes while in the manufacturing shop areas. The contractor shall provide all equipment and materials necessary for the installation of the machine. The contractor shall remove from WVA and dispose of all wastes (other than hazardous wastes) generated from uncrating and unpacking the machine at a permitted off-post disposal facility, in accordance with Attachment D of this specification and the document "WATERVLIET ARSENAL (WVA) INFORMATION FOR CONTRACTORS" which is available on the Watervliet Arsenal website. https://www.wva.army.mil/Documents/Contracting/WAIC.pdf

IMPORTANT: Under normal circumstances the contractor will be allowed to work as long as is desired during normal work days. Contractor work outside Watervliet’s normal work days cannot be guaranteed. Watervliet is on a condensed work schedule. Normal work hours/days for this schedule are four 9-hour workdays (Friday off) one week and four 9-hour days, one 8-hour day (Friday) the following week. Contractor work on the Friday off and weekends cannot be guaranteed. Foreign National contractor personnel require escort, which may restrict installation site availability based on Watervliet’s ability to provide the escort.

Certification: The contractor shall provide written certification that the machine tool including all specified systems, accessories, and geometric accuracies are provided with offer.

Test of Conformance to Specified Workpiece: The contractor shall perform a penetrant inspection of a Watervliet Arsenal mortar component. The machine shall be observed for proper function and compliance with the requirements of this specification. Specifically, as the mortar component moves through the stations the machine shall either perform an action or give a functional area to allow the operator to perform an action. These are thoroughly soaking the mortar component in penetrant, washing it with water, heating it to the desired temperature, applying the developer, and inspecting the mortar component for dye remaining in cracks. The machine shall have an ample resting area between all of these stations. The details and requirements of these stations can be found in the specification above. The Watervliet Arsenal may elect to perform this test on more than one workpiece.

Penetrant Solution: The penetrant solution shall be provided by the contractor for the preliminary and final acceptance testing.

Preliminary Acceptance Inspection: Preliminary acceptance inspection shall occur at the contractor's facility prior to machine shipment to WVA and shall consist of performing a full inspection of a mortar component provided by WVA as specified above.

Re-Inspection Provisions: If, during the course of preliminary acceptance inspection, deficiencies are disclosed which cannot be satisfactorily corrected during this visit, preliminary acceptance will be withheld and the contractor will be required to take corrective actions. In such cases, the Arsenal's Technical POC reserves the right to dispatch Arsenal representatives to observe a re-inspection and to charge the contractor's account for the travel and per diem costs of such re-inspections.

NOTE: If in the course of preliminary acceptance inspection, deficiencies are not disclosed, it is still the responsibility of the contractor to take corrective action when and if deficiencies are discovered at Watervliet Arsenal.

Post Preliminary Inspection Procedures: The Arsenal's representatives will not grant authority to ship the machine following preliminary acceptance inspection, even in cases where there have been no apparent instances of nonconformance. Authority to ship will be granted only by the Arsenal's Contracting Officer. In cases where it is determined that the machine and its equipment conform to specification, the Arsenal's Contracting Officer will grant shipping authority within (10) working days of completion of the preliminary acceptance inspection. In cases where deficiencies requiring correction are disclosed, the Arsenal's Contracting Officer will furnish a formal listing of required corrective actions within 15 working days of completion of the preliminary acceptance inspection.

Final Acceptance Inspection: Final inspection and acceptance of the machine shall be after installation at the Arsenal. At this time the machine shall again be subjected to, and required to pass, the test procedures performed at the preliminary inspection. The person or persons attending the final acceptance inspection shall be the same as the preliminary acceptance inspection.

Warranty: Upon final acceptance of the machine a Standard Commercial Warranty shall commence for duration of three years, to include as a minimum, parts and labor for the duration of the warranty, at no cost to the Government. The three year period shall commence from the date of notification by the Contracting Officer of the final acceptance.

Attachment D – Environmental Protections Requirements

1. Compliance with Environmental Laws and Regulations: Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of-Forces Agreement. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR).

2. Compliance with Green Procurement Requirements: Contractor shall follow Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) and Army Contracting Command Quick Guide (https://acc.aep.army.mil/accapps/ACCMAP/Documents/Quick-Guide-for-Sustainable-Procurement.docx) for acquisition of building materials and products and select materials that have a long life cycle; the least toxic materials; recyclable materials; materials that are resource-efficient; materials with the maximum recycled content; materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse.

3. Compliance with License and Certification Requirements: Contractor shall obtain all license and certification required by Federal, State, and Local environmental laws and regulations necessary to adhere to the specifications of this contract. The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority and/or agency as necessary to adhere to the specification of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws and/or regulations shall be considered a contract deliverable upon award.

4. Notification of Federal and State Regulators: Contractor shall immediately notify the Designated Government Representative (DGR) and COR of the arrival on site of any Federal, State, and/or DoD environmental regulator or enforcement agent and/or the receipt of any correspondence from a Federal or State environmental agency.

5. Inspections of Work Sites: Contractor shall submit to potential Federal, State, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements. If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality.

6. Reporting Noncompliance: Contractor shall immediately report any nonconformance and/or noncompliance with applicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies to the COR and DGR.

7. Verification of National Environmental Policy Act Documents: Contractor shall obtain from the COR or DGR, a copy of AMC's National Environmental Policy Act Policy and 32 CFR 651 which addresses actions to be taken by contractor. These documents include but is not limited to the analysis-associated decision document of an Environmental Impact Statement and Record of Decision; Environmental Assessment and Finding of No Significant Impact or Notice to Proceed; or Record of Environmental Consideration on the proposed contract actions prior to commencement of such actions.

8. Conformance with Environmental Management System: Contractor shall take the necessary actions to identify, monitor, and control those contract operations and activities that pose risk of contamination, or can negatively impact the natural and/or human environment.

9. Assignment of Environmental Compliance Designee (ECD): Contractor shall appoint an ECD for all contract work periods exceeding 180 consecutive days. Contractor shall appoint a primary and alternate ECD for each production, shop or work area that uses and/or stores hazardous materials and/or generates hazardous wastes. Contractor ECDs shall monitor implementation of all environmental regulatory requirements, report all environmental noncompliance to the work site supervisor, correct all environmental noncompliance, and verify implementation of directed actions to correct identified environmental noncompliance. Contractor shall have at least one ECD on duty at all times at each shop or work area. Contractor shall require all personnel designated as ECDs to complete the initial ECD training through the installation or Major Subordinate Command (MSC) environmental compliance point of contact within 15 days of the start of contract performance. Contractor personnel appointed as ECDs may perform other duties provided they do not prevent the performance of ECD duties. Contractors may request a waiver of this requirement through the COR and DGR, if using and/or storing very small quantities of hazardous materials.

10. Competency Training for Contractor Personnel: Contractor shall not allow personnel to perform any activities and/or tasks on AMC installations without proper and adequate qualifications or job competency training. In the event of any identified noncompliance, the Contractor shall, if requested, provide proof of contract personnel training or qualification (individual name, training/qualification type, training/qualification certificate, and date of training/qualification) to perform those contract activities associated with the identified noncompliance.

11. Generation of Solid Waste: Contractor shall remove from the installation and dispose of all solid waste generated, which cannot be recycled to an approved and permitted off-post disposal facility.

11.1. Contractor shall make every effort to divert construction, demolition debris, and all other solid waste to comply with the Army Integrated Solid Waste Management Policy.

11.2. The Contractor shall establish a program to promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials.

11.3. The Contractor shall make maximum effort to reduce and prevent waste.

12. SEGREGATION OF HAZARDOUS WASTE

a. All waste items collected on this contract must be segregated and kept physically separate from any other waste items. All wastes must be properly containerized and labeled. Waste containers are to be supplied by the Contractor and must be designed for the waste type being disposed of according to all Federal, State and Local laws. In the event the waste classification is unknown prior to containerization, the container must be marked “under analysis”. All waste must be properly sampled and characterized at the Contractors expense, with copies of all analytical results submitted to the Environmental Department within 24 hours of receipt. Any waste characterized as Hazardous Waste must be properly labeled and will be relocated to the WVA RCRA Storage Area by Government employees or it’s Hazardous Waste Contractor under separate contract.

b. All waste items must be so marked, that they are readily identified to this contract throughout the process. In addition, the contractor must ensure that there is a clear audit trail for all items until final treatment/disposal is accomplished.

c. The Contractor is responsible for proper disposal of all excess samples, they shall be added to the corresponding waste container.

12.1 TREATMENT OF HAZARDOUS WASTE ON GOVERNMENT FACILITY

a. Treatment of hazardous waste (including solidification) on Government facilities is not permitted. Treatment is defined as any process which meets the definition of treatment as set forth in applicable local, state, and Federal (including 40 CFR 260.10) laws and regulations.

b. The contractor shall not drain and/or flush PCB items at Government installations. Draining will be allowed only to prevent leaking and to meet DOT regulations.

c. Treatment, disposal, or release of gas (other than inert) to the atmosphere on Government premises is not permitted by this contract. The contractor may perform gas extraction for other than inert gas cylinders at the pickup location using self-contained apparatus. This apparatus shall emit no gas into the atmosphere, and purge the entire cylinder contents into a closed receiver for transport to a recycling or disposal site.

12.2 WASTE DISPOSAL REQUIREMENTS AND DOCUMENTATION

a. The Contractor shall not, under any circumstances, transport or dispose of any Hazardous Waste from the WVA. Non-RCRA regulated (Non-Hazardous) waste will be properly disposed of by the Contractor, at the Contractor’s expense. The contractor shall, without additional expense to the Government, be responsible for paying all fees, preparing or obtaining any necessary licenses, permits, notifications, waste profiles, or reports, which result from a contractor’s transportation, recycling, or disposal decision of such wastes.

b. The Contractor shall pay any and all fees, surcharges, fines or civil penalties resulting from errant or illegal waste profiling, packaging, labeling, documentation, transport or disposal of any waste from the project. The Contractor shall contact the Environmental Department immediately upon learning of any of the above.

c. All references to manifests in this provision relate to the “appropriate shipping paper” as required. The Contractor shall obtain and prepare all manifests, required for acceptance of waste into a Qualified Facility, and any other shipping documents. The contractor shall provide the COR with a copy of the completed form(s), for review by the appropriate Government official at least five (5) business days prior to removal.

Prior to removal from the site, completed copies of all manifests shall be furnished to the Environmental Office. Disposal receipts, weight slips and/or recycling receipts shall be submitted to the Environmental Office within 24 hours of receipt by Contractor. Each manifest, as well as all other documentation required herein, shall be clearly and distinctly marked with the generator and the contract and task order number, as applicable.

Emergency response information and twenty-four hour emergency phone numbers shall be listed on the manifest as well. If blocks are not provided, this information shall be placed in the upper, right-hand corner of each document.

d. The contractor shall notify the Environmental Department at least five (5) business days BEFORE attempting analysis or pickups of any waste for disposal.

e. The Government reserves the right to take appropriate action, such as the pursuit of monetary consideration and/or annotation of negative past performance if the contractor fails to meet the above applicable notification of waste removal from the pick-up location.

f. Contractor may not ship waste outside of the United States to circumvent Environmental Protection Agency (EPA) land disposal restrictions.

13. Use of Hazardous Materials: Contractor shall assign all hazardous materials management responsibilities to the appointed ECD. Contractor shall contact the DGR or COR to obtain technical assistance from Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous material storage, issue, use, and disposal requirements. Contractor shall submit to the COR and/or DGR a hazardous material inventory. The hazardous material inventory will be submitted 30 days prior to commencement of work for contracts that exceed 180 consecutive days. The inventory list will contain the hazardous material type and maximum quantities of materials anticipated to be stored on-site. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. The Contractor shall maintain copies of Safety Data Sheets for all hazardous materials used and stored on-site during performance of the contract. Contractor shall not supply or deliver any hazardous materials or chemicals to an installation that are listed on EPA toxic chemical list without prior written approval from DGR and/or COR.

14. Prevention of Storm Water Pollution: The Contractor shall perform, track, participate, implement, and comply with storm water pollution prevention minimum control measures, protocols, and best management practices (BMP) and ensure that water quality standards are not violated in accordance with all regulations and policies as applicable to the Pollutant Discharge Elimination System general permit requirements. Applicable permits include:

1) The Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activities (MSGP); and,

2) All Construction Activity Storm Water permits minimum control measures include, but not limited to:

• Public Education and Outreach on Storm Water Impacts

• Public Involvement and Participation

• Illicit Discharge Detection and Elimination

• Construction Site Storm Water Run-off Control

• Post Construction Storm Water Management in New Development and Redevelopment

• Pollution Prevention/Good Housekeeping for Municipal Operations Contractors will comply with the MSGP permit when the activity is identified as a permitted industrial activity. BMPs include, but are not limited to:

• Practicing spill prevention and good housekeeping.

• Installing and managing erosion and sediment control.

• Contractors will obtain permit coverage for construction activities disturbing over one acre of land (total acreage is cumulative across all portions of the project). BMPs include, but are not limited to:

• Preparing and implementing a site-specific Storm Water Pollution Prevention Plan (SWPPP) as outlined in the permit and prior to any soil disturbance.

• Installing and managing erosion and sediment control.

• Make available, upon request, permit associated documentation.

• Practicing spill prevention and good housekeeping.

• Schedule inspections and provide corrective actions for noted deficiencies.

15. Storm Water Management Low Impact Design/Development (LID): The Contractor shall perform, track, participate, implement, and comply with Section 438 of the Energy Independence and Security Act; Executive Order 13514; and the DOA memorandum (2010) for full implementation of low impact design/development (LID) techniques to restore predevelopment hydrology to the maximum extent technically feasible for both new and renovation construction projects regardless of size. In support of LID, Contractors will adhere to installation landscape codes and the guidance found in the Installation Design Guide concerning Low Impact Design/Development for storm water management. The following LID practices include, but are not limited to:

• Restoring predevelopment hydrology to the maximum extent technically feasible

• Promoting natural removal of pollutants such as nutrients, oil and grease, and sediments from storm water

• Managing rainfall at the point where it falls

• Meeting the requirements of the MS4 permit

• Important Note: Utilization of permanent retention/detention ponds is prohibited without authorization from the Installation Planning Division.

16. Use of Pesticides: N/A

17. Protection of Work Site Resources: Contractor shall confine all activities to areas defined by the drawings and specifications. Prior to the beginning of any work, the Contractor shall identify any land resources to be preserved within the work area. Except in areas indicated on the drawings or specified to be cleared, the Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms. The Contractor shall provide effective protection for land and vegetative resources at all times. Prior to site clearing and grubbing, the Contractor shall coordinate harvesting of saleable timber with the DGR and/or COR. Contractor shall notify the DGR and/or COR if any trees are required to be disposed or removed. The Contractor is not authorized to remove or dispose of any tree greater than 6 inches in diameter unless permission has been granted in writing by the DGR or COR.

18. Prevention of Spills: Contractor shall adopt the installation's Spill Prevention Control and Countermeasures Plan (SPCC) if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils-lubricants, or other restricted items. In case of a spill, the person in control of the spill site or their designated representative shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely); secure the spill site; restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department).

19. Protection of Sensitive Areas: Contractor shall comply with all installation designated sensitive and/or off-limit area restrictions. Sensitive areas are generally demarked indicating what activities (e.g., driving, digging, foot traffic) are prohibited. The Contractor shall also adhere to the following installation sensitive areas requirements:

19.1. Cultural Resources Sites: Do not excavate, remove, damage, or otherwise deface any archeological resource located on public lands.

20. Corrective Action for Noncompliance: Contractor shall when given a verbal and/or written notice of environmental noncompliance or nonconformance by the COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken.

21. Noise: Make the maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during the designated times. Pile-driving operations shall be coordinated through the DGR and COR.

22. Mercury: Mercury is prohibited, unless specified otherwise, and with the exception of mercury vapor lamps and fluorescent lamps. Dumping of mercury-containing materials and devices such as mercury vapor lamps, fluorescent lamps, and mercury switches, in rubbish containers is prohibited. Remove without breaking, pack to prevent breakage, and transport out of the activity in an unbroken condition for disposal as directed. Immediately report to the DGR and COR instances of breakage or mercury spillage. Clean mercury spill area to the satisfaction of the Contracting Officer. Cleanup of a mercury spill shall not be recycled and shall be managed as a hazardous waste for disposal.

23. Universal Waste / e-Waste Management: Universal waste including but not limited to some mercury containing building products such florescent lamps, mercury vapor lamps, high pressure sodium lamps, CRTs, batteries, aerosol paint containers, electrical equipment containing PCBs, and consumed electronic devices, shall be managed in accordance with applicable environmental law and installation instructions.

24. Pollution Prevention / Hazardous Waste Minimization: Minimize the use of hazardous materials and the generation of hazardous waste. Consult with the Environmental Office for suggestions and to obtain a copy of the installation's pollution prevention/hazardous waste minimization plan for supporting waste minimization goals.