BAA-2016_3_2_16.pdf
PDF 417 KB Posted
- Attached to
- FRA Broad Agency Announcement Federal contract opportunity
- Solicitation number
- DTFR53-16-R-00100
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BAA-2016_Appendix_C_3_29_16.pdf | ||
| BAA-2016_Appendix_C_3_3_16.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
i
BROAD AGENCY ANNOUNCEMENT
BAA-2016
Federal Railroad Adminstration
Office of Research, Development and Technology
Research Initiatives In Support of Rail Safety
March 2016 ii
Contents
1 Introduction
1.1 Background
1.2 Purpose
2 Strategic Research Focus
2.1 Safety
2.2 Human Factors Division
2.3 Track Division
2.4 Rolling Stock Division
2.5 Train Control and Communications Division
2.6 Program Evaluation
3 Program Guidelines
3.1 Schedule
3.1.1 Communications Protocol and Data Sources
3.1.1.1 Communications Protocol
3.1.1.2 Data Sources & Points of Contact:
3.2 Offeror Eligibility
3.3 Project Qualification Requirements
3.4 Project Funding
3.4.1 Program and Project Funding Limits
3.4.2 Cost Sharing
3.5 Project Selection Process
3.5.1 Project Concept Papers
3.5.2 Project Proposals
3.5.3 Oral Presentations
3.6 Intellectual Property Rights
3.6.1 Patents
3.6.2 Proprietary Data Restrictions
4 Submittal Requirements
4.1 Project Concept Papers
4.1.1 Cover page
iii
4.1.2 Technical Approach
4.1.2.1 Background
4.1.2.2 Scope of Work
4.1.2.3 Expected outcomes and impacts
4.1.2.4 QUAD Chart
4.1.3 Qualifications
4.1.3.1 Project Team
4.1.3.2 Past Experience
4.1.3.3 Unique Capabilities
4.1.4 Schedule and Cost Estimates
4.2 Project Proposals
4.2.1 Cover Page
4.2.2 Volume I: Technical Proposal
4.2.2.1 Background
4.2.2.2 Statement of Work
4.2.2.3 Technical Approach
4.2.2.4 Project Management Plan
4.2.3 Capabilities and Experience
4.2.3.1 QUAD Chart
4.3 Volume II: Cost and Pricing Proposal
4.3.1 General Requirements
4.3.2 Recommended Procurement Instrument and Pricing Arrangement
4.4 Volume III: Supplemental information
4.4.1 System for Award Management (SAM)
4.4.2 Administrative and Audit Offices
4.4.3 Intellectual Property
4.4.4 Subcontracting Plan
4.4.5 Past Performance
4.5 Oral Presentations
5 Evaluation and Award Process
5.1 Evaluation Criteria
5.1.1 Project Concept Papers
iv
5.1.2 Project Proposals
5.1.2.1 Technical Factors
5.1.2.2 Cost and Pricing Factors
5.1.2.3 Past Performance Factors
5.2 Awards
5.2.1 Notifications and Negotiations
Appendix A – Project QUAD Chart
Appendix B – Cost Proposal Format and Preparation Instructions
Appendix C – Research Topics
1 Introduction
1.1 Background
The Federal Railroad Administration (FRA) has a successful history of supporting the development of advanced rail technologies to meet the transportation needs of the country. Over the last few decades, the FRA has provided funding and technical support to facilitate research and to stimulate development of new equipment, infrastructure, and testing technologies to enhance the nation’s rail transportation safety and efficiency. These efforts are undertaken in support of the US DOT’s mission:
Serve the United States by ensuring a fast, safe, efficient, accessible and convenient transportation system that meets our vital national interests and enhances the quality of life of the American people, today and into the future.
The FRA’s Office of Research, Development and Technology is charged with conducting research and development in support of improved railroad safety and national rail transportation policy. These activities support the objectives of the US DOT, the mission critical needs of the FRA, and the rail industry as a whole, through technology development and demonstration, basic and applied research, and information exchange within the rail industry.
1.2 Purpose
The purpose of this Broad Agency Announcement (BAA) is to solicit a variety of basic and applied technology research projects that will support the strategic objectives of Office of Research, Development and Technology and the research needs of the four FRA research divisions:
• Track
• Rolling Stock and Equipment
• Train Control and Communications
• Human Factors
Projects shall develop technologies that have a direct impact on the safety and efficiency of freight and passenger rail operations in the US. Such technologies will:
• Reduce the operational and program deployment risks associated with mixed use rail lines;
• Improve safety by reducing human and technology failures;
• Bring about capital cost reductions and economy in producing equipment and facilities;
• Reduce operating costs of rail service by providing more efficient operations;
• Improve the reliability of equipment and infrastructure components by reducing failures and/or reducing false failure detections;
• Enhance the social benefits and/or environmental aspects of rail transportation; and
• Facilitate the development of domestic manufacture of rail equipment and infrastructure components.
Specific research topics for this BAA are contained in Appendix C. Additional research topics may be announced at any time during the open period of this BAA.
2 Strategic Research Focus
The following sections provide the strategic focus of FRA research. Additional information about FRA Office of Research, Development and Technology research goals can be found in the strategic plan published on the FRA website (http://www.fra.dot.gov/eLib/details/L04568). Some of the research areas described in this section may be part of this BAA research solicitation. See Appendix C for specific research topics.
The FRA’s research mission is to ensure the safe, efficient and reliable movement of people and goods by rail through basic, applied and developmental research. We will do this by providing the best available scientific and technical foundation for FRA’s railroad development and regulatory activities.
2.1 Safety
Safety is the DOT’s primary strategic goal and thus, the principal goal for FRA’s BAA program. The goal is to reduce safety risk by reducing both the likelihood of accidents occurring and the consequence should they occur. Consequence can be defined as the harm to which an individual or group of people is exposed, and, in this sense, is the weighted summation of fatalities, injuries, shock and trauma.
Reducing risk over time will reduce the number of accidents and actual harm.
While being driven by the safety goal, we seek projects that also contribute towards the other DOT strategic goals, including:
• Maintaining a state of good repair and economic competitiveness
• Environmental sustainability
• Fostering livable communities
• Workforce development
2.2 Human Factors Division
Human errors now account for more than one third of all train accidents in the U.S. railroad industry.
Railroads depend on the adaptability of people, as well as the performance of infrastructure, equipment, and control systems to keep the system safe. Railroad workers need knowledge, training, tools and alertness to do their jobs properly and to ensure the public, their coworkers’ and their own safety. When train crews are highly fatigued, the average total accident cost has been found to be more than triple the overall average cost of accidents. Strategic priorities for the human factors division include:
• Conduct pilot trials to improve safety and organizational culture in railroad organizations
• Conduct research on fatigue, distraction and ergonomics to address individual and team behavior
• Develop technology, automation and systems design to minimize the potential for human errors http://www.fra.dot.gov/eLib/details/L04568
2.3 Track Division
Track and infrastructure failure is the second leading cause of train derailments in the U.S. Incorrect interaction between moving vehicles and the track is a common cause of derailments. Strategic priorities for this division are:
• Develop track inspection technologies that detect defects before they become failures in service
• Develop computer modeling capabilities to improve understanding of vehicle-track interaction, wheel and rail profiles and contact conditions
• Expand the use of autonomous recording methods to provide more frequent and cost-effective measurements of track condition
• Develop new methods for monitoring difficult to detect safety issues such as longitudinal rail force, ballast lateral restraint and ballast condition
2.4 Rolling Stock Division
R&D in this division aims to reduce the likelihood of derailments from equipment failures and to mitigate the consequences should derailments occur through these or other causes. Strategic priorities are:
• Investigate the effectiveness of wayside and on-board monitoring systems to detect equipment defects
• Analyze component failure modes to identify necessary improvements in materials and construction methods
• Prioritize R&D projects to reduce the risk of transporting hazardous materials by rail
• Build on the recent progress in revising regulations for crashworthiness of rail vehicles to further improve safety in collisions and derailments
• Prioritize R&D projects to improve fire safety for passenger cars and for fuel tanks on both conventional locomotives and diesel multiple unit trains
2.5 Train Control and Communications Division
Train control and communications R&D is aimed at eliminating train-to-train collisions, avoiding over-speed derailments and increasing the safety of track workers. Strategic priorities are:
• Support the railroads in meeting the deadlines for implementation of Positive Train Control
(PTC)
• Continue to support the Generalized Train Movement Simulator to help the industry implement PTC optimally
• Identifying areas of residual risk after PTC implementation to determine future R&D needs
This division also addresses the top two causes of railroad fatalities and injuries: collisions at highway-rail grade crossings and trespassers hit by trains. The strategic priorities are:
• Advance safety technologies, education and community outreach to improve grade crossing and trespass safety through local pilot trials, and then publicize successes
• Explore opportunities offered by Intelligent Transportation Systems (ITS) to improve grade crossing and trespass safety
• Hold research needs workshops on highway-rail grade crossing safety and trespass prevention to identify further opportunities for research-driven improvements to safety
2.6 Program Evaluation
The Government Performance and Results Act (GPRA) and the GPRA Modernization Act of 2010 require Federal agencies to assess the manner and extent to which their programs achieve intended objectives.
Consistent with the GPRA directive, FRA is taking steps to integrate evaluation criteria within projects, and may seek specific, program evaluation research, as needed.
R&D evaluation goals focus on five broad areas:
• Inform and assist continuous improvement of program effectiveness and impact on railroad safety;
• Contribute to long-term improvements in knowledge diffusion and technology transfer;
• Strengthen the Office of R&D’s effectiveness, stature, credibility, and case for continued financial support;
• Meet accountability requirements; and
• Build evaluation capacity by making evaluation design, budgeting, and staffing a regular part of each division’s R&D budget requests, program planning, procurements in contracts and grants, program implementation, and program accountability.
Additional information is available from the FRA’s e-library:
http://www.fra.dot.gov/eLib/details/L04865
3 Program Guidelines
This BAA, due to its broad research focus, does not lend itself to the use of a common work statement.
As such, no single North American Industry Classification System (NAICS) code (formerly Standard Industrial Classification (SIC) codes), will be issued for the BAA. NAICS codes will be specific to each individual contract award, as determined by the type of activity in which the offeror will be engaged.
The Government reserves the right to select for award any, all, part, or none of the proposals received in response to this announcement. This BAA is an expression of interest only and does not commit the Government to pay any concept paper or proposal preparation costs.
This announcement constitutes the public announcement, as contemplated by FAR 6.102(d)(2), and no formal Request for Proposals or other solicitation regarding this announcement will be issued. Requests for same will be disregarded.
http://www.fra.dot.gov/eLib/details/L04865
By participating in this BAA, the offeror agrees that if awarded a Firm-Fixed-Price type contract with milestone payments, the Government’s liability for any effort performed shall not exceed the payment amount of the preceding milestone. The offeror shall propose and implement a program consistent with this requirement. If it is determined that the offeror’s performance under the contract is not progressing to the satisfaction of the Government, the Government retains the right to commence a process to modify or end performance. This process will require a 60-day notice and may be used in conjunction with FAR clause 52.242-15, Stop-Work Order.
3.1 Schedule
The open period for BAA concept papers is defined in Appendix C. The FRA may modify the schedule or research topics. If such changes are made, Appendix C will be amended. This BAA and amendments issued thereto will be posted to the Federal Business Opportunities (FedBizOpps) website. It is the responsibility of the offeror and interested parties to be aware of BAA amendments by regularly checking Federal Business Opportunities (FedBizOpps) website by registering at www.fbo.gov to receive notifications and updates to this specific solicitation.
3.1.1 Communications Protocol and Data Sources
3.1.1.1 Communications Protocol
Those parties interested in responding to this BAA are strongly encouraged to first contact the FRA Office of Research, Development and Technology via phone or e-mail (see below) to discuss the prospective project prior to devoting resources towards completing the project concept paper. All non-technical inquiries should be directed to the Contracting Officer.
Any exchanges of information must be consistent with procurement integrity requirements of section 27 of the Office of Federal Procurement Policy Act (41 U.S.C. 423, as amended) (see Federal Acquisition Regulation (FAR) 3.104). Communication between offerors and FRA is encouraged prior to and throughout the project concept paper phase. After submission of project proposals, all information exchanges of a technical nature will be conducted through the BAA Program Manager, and exchanges of a non-technical nature through the BAA Contracting Officer. There shall be no discussion of proposals submitted by other offerors or proposal evaluation data.
Offerors are advised that any indication of interest, in the affirmative, is not meant to imply nor in any way impart an obligation on the part of the Government that an award will be forthcoming for the offered work or project.
All submittals shall be delivered in electronic format (Adobe PDF) to the BAA Program Manager with copy to the BAA Contracting Officer, via the e-mail addresses listed below.
3.1.1.2 Data Sources & Points of Contact:
BAA Official Documents www.fbo.gov www.fra.dot.gov www.grants.gov http://www.fbo.gov/ http://www.fbo.gov/ http://www.fra.dot.gov/ http://www.grants.gov/
BAA technical information exchange e-mail address
FRARDBAA@dot.gov
BAA Program Manager, Cameron Stuart TEL: 202-493-6384 Cameron.stuart@dot.gov
BAA Contracting Officer, Keith Boyea TEL: 202-493-1341 Keith.boyea@dot.gov
System for Award Management www.sam.gov
3.2 Offeror Eligibility
This is an unrestricted solicitation. Any responsible source may submit a proposal concept paper for consideration, including, but not limited to, states or local governments, or organizations of state or local governments, universities or institutions of higher education, hospitals, non-profit organizations, private individuals, corporations, and businesses or commercial organizations, except that any businesses owned in whole or in part by the Federal Government are not eligible. Although businesses owned in whole or in part by the Federal Government are not eligible for direct funding they may subcontract with eligible offerors. Cooperative arrangements (e.g., joint ventures, limited partnerships, teaming arrangements, or collaboration and consortium arrangements) are permitted and encouraged.
All offerors must be registered on the Federal Government’s System for Award Management (SAM) systems prior to project award (www.sam.gov).
Small, Small Disadvantaged (SD), and Service-Disabled Veteran-Owned Business Concerns, and Veteran-Owned (VO) and Woman-Owned (WO), and Historically Underutilized Business Zone (HUBZone) Small Business Concerns, and Historically Black Colleges and Universities (HBCU) and Minority Institutions (MIs) are encouraged to submit proposal concept papers on their own and/or in collaboration with others. However, no portion of this BAA will be set aside or reserved exclusively for Small, SD, or Service-Disabled Veteran-Owned Business Concerns, or for VO, WO, or HUBZone Small Business Concerns, or for HBCU and MIs.
3.3 Project Qualification Requirements
This BAA solicits research projects in response to specific research topics detailed in this document (Appendix C). The FRA is interested in all research that may lead to safer and more efficient rail systems.
However, for the purposes of this BAA program, the FRA will respond only to concept paper submittals that are in direct response to a specific research topic, as defined in Appendix C.
Projects shall be designed to complete basic and applied technology activities, to increase the scientific knowledge base of the rail industry, to exploit the potential of existing technologies, and to address issues that impact the safety and efficiency of rail operations, including high speed rail, in the United States. Projects designed to develop magnetic levitation (Maglev) technologies, or other non-traditional rail transport modes, will not be considered under this BAA. Transit-oriented research topics such as light rail, trolley, or monorail systems will not be considered. This BAA will not be used to sponsor projects that develop specific products or systems for sale. In the context of the technology readiness mailto:Keith.boyea@dot.gov http://www.sam.gov/ levels defined below, this BAA is designed only for projects in Levels 1 through 7, with preference given to those projects that are already advanced to the proof-of-concept testing stage (Level 3).
Technology Readiness Levels Description
1. Basic principles observed and reported.
Lowest level of technology readiness. Scientific research begins to be translated into applied research and development. Examples might include paper studies of a technology’s basic properties.
2. Technology concept and/or application formulated.
Invention begins. Once basic principles are observed, practical applications can be invented. The application is speculative and there is no proof or detailed analysis to support the assumption.
Examples are still limited to paper studies.
3. Analytical and experimental critical function and/or characteristic proof of concept.
Active research and development is initiated. This includes analytical studies and laboratory studies to physically validate analytical predictions of separate elements of the technology. Examples include components that are not yet integrated or representative.
4. Component and/or breadboard validation in laboratory environment.
Basic technological components are integrated to establish that the pieces will work together. This is relatively “low fidelity” compared to the eventual system. Examples include integration of “ad hoc” hardware in a laboratory.
5. Component and/or breadboard validation in relevant environment.
Fidelity of breadboard technology increases significantly. The basic technological components are integrated with reasonably realistic supporting elements so that the technology can be tested in a simulated environment. Examples include “high fidelity” laboratory integration of components.
6. System/subsystem model or prototype demonstration in a relevant environment.
Representative model or prototype system, which is well beyond the breadboard tested for TRL 5, is tested in a relevant environment.
Represents a major step up in a technology’s demonstrated readiness. Examples include testing a prototype in a high fidelity laboratory environment or in simulated operational environment.
7. System prototype demonstration in an operational environment.
Prototype near or at planned operational system. Represents a major step up from TRL 6, requiring the demonstration of an actual system prototype in an operational environment, such as in a rail vehicle or on an actual track system.
8. Actual system completed and qualified through test and demonstration.
Technology has been proven to work in its final form and under expected conditions. In almost all cases, this TRL represents the end of true system development. Examples include developmental test and evaluation of a component of subsystem in its intended system to determine if it meets design specifications.
9. Actual system proven through successful deployment.
Actual application of the technology in its final form and under operational conditions, such as those encountered in operational test and evaluation. In almost all cases, this is the end of the last “bug fixing” aspects of true system development.
Source: GAO/NSIAD-99-162
3.4 Project Funding
3.4.1 Program and Project Funding Limits
Funding for this program is appropriated in the Federal budget for railroad research and development.
FRA will make available approximately $2.0 million during fiscal year 2017 (FY 17) for projects determined by the FRA to be technically consistent with the objectives of this BAA and of interest to the Government, and for which adequate funding exists. Awards are subject to the availability of funds.
No funding provision or commitment can be made at the time of award for phased or expanded work or projects beyond the initial or base phase funded at time of award that the applicant may propose in its submissions. In the event future appropriated funds are authorized, FRA may, at its discretion, provide additional funding for phased or expended effort under existing awards.
Awards may be of any dollar value (so long as those amounts do not exceed the total amount available under the BAA), but it is anticipated that most individual awards (or that part of the Government’s portion in a cost sharing arrangement) will have dollar values ranging between $25,000 and $500,000.
Awards resulting from this BAA will be made based on the evaluation results of a two-phased process.
The Government reserves the right to fund all, some, one, or none of the proposals submitted; may elect to fund only part of a submitted proposal; and may incrementally fund any or all awards under this BAA. In either case, the Contracting Officer will have the ultimate authority and responsibility to make final scope determinations for selections of proposals that will not be totally funded to ensure the portion selected meets the solicited requirements. In addition, the Government reserves the right to create and maintain a reserve list of proposals for potential funding, in the event that additional funding becomes available.
All awards are subject to the availability of funds. Offers considered unresponsive to the Government’s requests for information in a timely manner, defined as meeting government deadlines established and communicated with the request, may be removed from further consideration.
3.4.2 Cost Sharing
For the purposes of this BAA, cost sharing is a generic term denoting any situation where the Government does not fully reimburse the offeror for all allowable costs necessary to accomplish the project under the contract or other award instrument. The term encompasses cost matching, participation in-kind, or other investment of resources as a means of venture sharing in lieu of a formal cost sharing arrangement, third-party in-kind contributions, cost limitations (direct or indirect) and similar concepts. Generally, many forms of cost participation, by their very nature and definition, minimize or negate the opportunity for profit or fee.
Cost sharing by awardees is not mandatory under this BAA, but because of the potential for long-term benefits to those firms or institutions involved in these research, development and demonstration activities, it is FRA’s policy to obtain cost participation, whenever possible. This is preferred when FRA supports efforts where the principal purpose is ultimate commercialization and utilization of the technologies by the private sector, and when there are reasonable expectations that the offeror will receive present or future economic benefits beyond the instant contract/agreement as a result of the effort. It is important that research conducted under this BAA be applicable to the development objectives of the program, and that the results of these research activities are practical for deployment within the railroad industry. Projects that include partnerships with, and cost sharing from railroad operators and other industry stakeholders, will facilitate future industry adoption of developed technologies. Such projects are preferred.
3.5 Project Selection Process
This BAA selection process is structured as a two-step process.
3.5.1 Project Concept Papers
The first step of the process is the submission and evaluation of project concept papers. As detailed in Section 4.1, the concept paper provides a brief overview of the research effort, including the current state of development, the next steps in the development plan and rough order magnitude cost and schedule data. Concept papers will be used to gauge applicability of and the Government’s interest in the technology research area. All offerors must submit a project concept paper in order to be considered for an award.
Discussions between the offeror and FRA are required at this point in the process in order to develop or refine project concepts and to avoid unnecessary work efforts, by either party, on project concepts that the Government does not value, or cannot fund.
Concept papers shall be submitted in electronic form via e-mail. FRA will work to complete concept paper evaluations within 60 days of receipt and will notify the offeror of final disposition.
3.5.2 Project Proposals
Following concept paper evaluation and discussion, FRA may invite the offeror to submit a detailed technical and cost/price proposal for award evaluation. Proposals shall be prepared in accordance with the requirements of Section 4.2 – 4.4. Submissions that are incomplete, materially lacking, or not responsive to the technical requirements of this BAA, may be returned unevaluated, or evaluated as is, without further opportunity for revision, at the discretion of the FRA’s evaluation committee.
Project proposals shall be submitted in electronic form via e-mail.
3.5.3 Oral Presentations
FRA may request that offerors conduct an oral presentation of the proposal following an initial evaluation. Oral presentations may be conducted in person or via telephone or computer conference at the discretion of FRA. Oral presentations shall be prepared in a technical briefing format following the requirements of Section 4.5. FRA may ask technical questions for clarification during the oral presentation.
3.6 Intellectual Property Rights
Awards will generally contain detailed provisions concerning patent rights, rights in technical data and computer software, data reporting requirements, and other terms and conditions which may be negotiated as part of the award process.
Offerors must describe any limitations on any intellectual property (patents, inventions, trade secrets, copyrights, or trademarks) that will impact the Offeror’s performance of the contract or impact the Government’s subsequent use of any deliverable under the contract. In particular, the Offeror must describe the intellectual property in sufficient detail to describe the limitations (Data assertions of the Offeror or any subcontractor, potential patent licenses required by the Government, etc.), and to describe why or how the Government can accomplish the stated objectives of this BAA with the limitations described or proposed by the Offeror. This information must be included in Volume III, Supplemental Information, of the proposal.
3.6.1 Patents
Offerors must list any known patents, patent applications, or inventions which may require the Government to obtain a license should the Offeror’s proposal be selected for award. If any patent, patent application or invention is owned by the Offeror, the Offeror must provide a statement, in writing, that it either owns or possesses the appropriate licensing rights to patent, patent application or invention for which the Government may require a license for this program. If an Offeror does not own or have license rights to license the Government for any such patent or patent application, the Offeror must explain how the Government may obtain a license or whether the Offeror plans to obtain these rights on behalf of the Government.
For any patent or patent application listed above, the Offeror must provide the patent number or patent application publication number, a summary of the patent or invention title, and indicate whether the Offeror is the patent or invention owner. If a patent or invention is not licensed by the Offeror, identify the licensor. Be advised that no patent, patent application, or invention disclosure will be accepted if identified in the Data Rights Assertion list described below. Rights in patents, patent applications, and invention disclosures are addressed in the patent rights clause to be included in the contract and therefore, no assertion of limited rights in patents or patent applications will be accepted. The list of patents, patent applications and inventions of this section must be a separate list from the Data Rights Assertion list described below.
3.6.2 Proprietary Data Restrictions
Offerors are advised that the proposal concept papers and/or proposals may contain data the offeror does not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes. If the offeror wishes to restrict such data, the cover page of any and all submittal documents must be marked with the following legend, and relevant sheets marked as instructed.
This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed – in whole or in part – for any purpose other than to evaluate this proposal. However, if a contract is awarded to this offeror as a result of – or in connection with – the submission of these data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government’s right to use information contained in these data if they are obtained from another source without restriction. The data subject to this restriction are contained in Sheets [insert numbers or other identification of sheets].
Each restricted data sheet shall be marked as follows:
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this document.
To the extent that such restrictions on proprietary data or information would not interfere with the intent of the Government to make the results of the work and projects awarded under the BAA available to all interested parties, and if in conformance with the Freedom of Information Act (5 U.S.C. 552, as amended), the Government will honor those desires.
4 Submittal Requirements
4.1 Project Concept Papers
All project concept papers must respond to a specific research topic (Appendix C). The FRA will not evaluate concept papers that do not respond to a specific research topic. In the case of multiple project proposals from a single offeror, a separate concept paper is required for each project. No project will be considered for an award without an approved project concept paper.
Project concept papers shall be prepared simply and economically, and shall provide a concise description of the proposed research project, organized as defined in the following sections. Concept papers shall be no more than 5 pages in length (excluding cover page and QUAD chart), no less than 10 point type, and single-spaced, single-sided letter size pages with 1” margins (minimum). Project concept paper submissions should not include promotional brochures, advertisements, taped recordings, or other extraneous material.
4.1.1 Cover page
Project concept papers shall include a cover page containing the following information:
• Working title of the proposed project
• BAA Research Topic title and reference Number (Appendix C)
• Names, phone numbers, mailing and e-mail addresses for the principal technical and contractual points of contact (person or persons authorized to negotiate on the behave of the offeror and who can contractually obligate the offeror organization)
• Secondary offeror organization addresses (project partners), if any
• Date of submittal
• Proprietary data restrictions, if any (See Section 3.6.2)
4.1.2 Technical Approach
4.1.2.1 Background
In this section, the offeror shall describe the following:
Mission Statement – Briefly describe the technology proposed for research. Provide a statement(s) that conveys the offeror’s vision of the fully developed technology and its impact on the FRA’s research topic.
Description of Need – Describe the specific issue intended to be solved or improved by the technology proposed for research and development. Discuss the proposed application to rail safety and/or efficiency improvement in the United States. Estimate the probability of the rail industry adopting this technology, and provide a rationale for this estimate.
Technology Assessment – Quantify the maturity of the technology in the context of the technology readiness levels detailed in Section 3.3. Provide analytic and empiric evidence to support the assessment. Describe how the proposed research or technology is technically or scientifically innovative with respect to the research topic description.
Development Framework – Describe the development history of the technology, both within the offeror’s organization and from other sources, as applicable. Discuss the technical, financial, programmatic, or other significant factors that have impacted the development of this technology to date, both positively and negatively. Provide a technological risk assessment for future development of this technology.
4.1.2.2 Scope of Work
The offeror shall describe the general scope of work planned for this research activity. This section shall describe the major research, testing, and analysis activities in sufficient detail to communicate the breadth of activities proposed. A detailed work breakdown structure is not required. The offeror shall indicate major progress milestones and associated deliverables as part of this section.
The scope of work shall identify all offerors and associated stakeholder groups in the major activities of the project, and shall indicate the estimated work effort required from each offeror, expressed as a percentage of the total effort for each activity. In addition, the offeror shall identify any third party resource needs that are required during the project. These resources may include Government-furnished equipment.
4.1.2.3 Expected outcomes and impacts
Identify the significant outcomes expected from the project and their impact on the safety and efficiency of the rail industry, including short, medium and long term effects. Describe these outcomes and impacts in the context of the technology readiness levels, and in terms of their impact on the realization of FRA goals as described by the specific research topic.
4.1.2.4 QUAD Chart
Include a Quad chart summarizing the project concept, as per the example and instructions provided in Appendix A.
4.1.3 Qualifications
4.1.3.1 Project Team
List all key offerors proposed for the project, including offerors from outside the prime offeror’s organization. Organize the team by organization name and briefly describe each person’s roles and responsibilities on the project. Provide a short synopsis of each key person’s education, experience, and other qualifications applicable to the proposed project. Provide information on the business type (small, large, or disadvantaged) for each offeror organization.
4.1.3.2 Past Experience
Describe the relevant past experience of each organization participating in the project. Identify any publicly available and accessible resources that may provide more details regarding this experience, e.g.
public web site links to past or current project documents.
4.1.3.3 Unique Capabilities
Briefly describe any unique capabilities that the offeror team possesses that may reduce project risk, may reduce project duration, or may improve project financial performance. Describe these capabilities within the context of the research topic BAA and the proposed project’s scope of work.
4.1.4 Schedule and Cost Estimates
Provide milestones for the proposed project that includes start, finish, and major activity completion times. Express milestones dates as the number of weeks from project start.
Provide a rough order magnitude cost estimate. Provide a breakdown of these costs (percentage) for each organization in the project team.
Provide a funding plan for the project. Identify each funding source and their contribution to the whole, expressed as a percentage. Include all anticipated sources, including offeror internal sources, Government funds, and other offeror organizations.
4.2 Project Proposals
Following review, evaluation and discussion of the concept paper, the FRA may invite the offeror to submit a formal proposal for the project. The project proposal builds upon the contents of the concept paper, as modified through discussions between the offeror and FRA. Additional content and more detailed information is required in the proposal document, as described in the sections that follow.
Proposal documents are produced to the same formatting requirements as the concept papers, except for a 20 page limit. This 20 page limit is for Volume I only. Submissions that are incomplete, materially lacking, or not responsive to the technical requirements of this BAA, may be returned unevaluated, or evaluated as is, without further opportunity for revision, at the discretion of the FRA’s evaluation committee.
The proposal shall be organized into 3 Volumes, as follows:
Volume I: Technical Proposal
Volume II: Cost and Pricing Data
Volume III: Supplemental Information
Offerors are advised that the FRA’s evaluation of a project for possible award is based solely on the contents of the offeror’s project proposal document, oral presentation documents (see Section 4.3), and the offeror’s answers to any technical clarification questions, as transmitted through the Contracting Officer.
It is the policy of FRA to treat all proposals as competitive information and to disclose the contents only for the purposes of evaluation.
Please note that prior to an award, the Government reserves the right to perform a review of past performance. Sources for past performance may include the Past Performance Information Retrieval System (PPIRS), the Federal Award Performance and Integrity System (FAPIIS), and Government program managers and contracting officers who are familiar with the offeror’s relevant past performance may also be contacted.
4.2.1 Cover Page
Project proposals shall include a cover page containing the following information:
• Working title of the proposed project
• BAA Research Topic title and reference Number (Appendix C)
• “Project Proposal” written below the project title
• Names, phone numbers, mailing address and e-mail addresses for the principal technical and contractual points of contact (person or persons authorized to negotiate on the behave of the offeror and who can contractually obligate the offeror organization)
• Secondary offeror organization addresses (project partners), if any
• Date of submittal
• Proprietary data restrictions, if any (See Section 3.6.2)
4.2.2 Volume I: Technical Proposal
4.2.2.1 Background
Proposal documents shall address the same requirements with the concept papers, see Section 4.1.2.1.
Offerors shall explain, specifically, how the proposed technology or method enhances the ability to meet the research topic goals; how it could be incorporated into existing railroad equipment, infrastructure, or operations (to include how major barriers, impediments or obstacles could be overcome or mitigated); and the interface modifications required to accomplish a demonstration. Also explain how its application will bring about an improvement to capital equipment or infrastructure, or operating methods, safety and/or performance improvements. Correlative benefits to general railroad operations, if any, should also be cited, since they can also enhance the feasibility of passenger service added to freight routes. Quantitative support should be provided for assertions made.
Proposals may include a discussion of optional, future phase or phases of work. Such discussion shall be clearly labeled as “optional future phase or phases of work.” The original phase or work shall in no way depend on work described under future phases in order to meet the program criteria. If a future phase or phases are included, a rough order magnitude cost estimate shall be provided as a separately labeled section in the costs and pricing section of the proposal.
Proposals shall include references to past relevant research describing capabilities, work, and significant accomplishments in areas directly associated with proposed research area or in closely related areas. A bibliography of relevant technical papers and research notes that support the technical concepts and innovative ideas described in this proposal shall be included for technical reference.
Mission Statement – Describe the technology proposed for research. Provide a statement(s) that conveys the offeror’s vision of the fully developed technology and its intended impact on the FRA’s research topic.
Description of Need – Describe the specific issue intended to be solved or improved by the technology proposed for research and development. Discuss the proposed application to rail safety and/or efficiency improvement in the United States. Discuss the intended stakeholder groups expected to utilize this technology and discuss how each group is expected to leverage this technology to improve safety and operating efficiency. Estimate the probability of the rail industry adopting this technology, and provide a rationale for this estimate.
Technology Assessment – Quantify the maturity of the technology in the context of the technology readiness levels detailed in Section 3.3. Describe the technology readiness in the context of the rail industry (operations, legal, regulatory, etc.). Provide analytic and empiric evidence to support the assessment. Describe how the proposed research or technology is technically or scientifically innovative with respect to the research topic description.
Development Framework – Describe the development history of the technology, both within the offeror’s organization and from other sources, as applicable. Discuss the technical, financial, programmatic, or other significant factors that have impacted the development of this technology to date, both positively and negatively. Provide a technological risk assessment for future development of this technology.
Expected Outcomes and Impact - Identify the significant outcomes planned for the project and their impact on the safety and efficiency of the rail industry, including short, medium and long term effects.
Describe these outcomes and impacts in the context of the technology readiness levels, and in terms of their impact on the realization of FRA goals as described by the specific research topic.
4.2.2.2 Statement of Work
A statement of work document shall be prepared as a separate document contained within the proposal submittal. There shall be no company-sensitive or proprietary data included in this document.
This statement of work shall contain the following information:
Work Scope: Describe the work to be accomplished as part of the research project. Include the technology under development, the objectives and goals of the effort, major milestones, and the expected outcomes.
Requirements: Define the work. Separate the work effort into major tasks and subtasks as numbered paragraphs, or in a table. Identify all project reviews, test, demonstrations, and all deliverables resulting from the execution of the project.
Deliverables: All project deliverables should be clearly listed and described.
4.2.2.3 Technical Approach
Offerors shall provide a narrative description of work to be performed, organized as it is expected to be performed. The technical approach shall include activities designed to integrate rail industry in the development effort, either through active participation in the technology development or through demonstration and/or testing support. Describe the steps, tasks, and activities necessary to achieve the desired project results. Identify and describe all deliverables, presentations, demonstrations, test, and periodic reports. Describe the quality requirements for the project and identify the processes and/or procedures that will be employed to ensure these requirements are satisfied.
The technical approach shall include a risk assessment. Technical, programmatic, market and other risk elements shall be analyzed for their impact on the project. A scoring or ranking scheme shall be developed to quantify potential impacts. Data shall be presented in a probability/impact chart or other suitable format.
4.2.2.4 Project Management Plan
The proposal shall contain a detailed management plan for the project based upon the following minimum requirements.
Work Breakdown Structure (WBS) – Divide the project requirements into tasks and work packages.
Hierarchically organize the project work down to the work package level. A table or chart format is preferred.
Project Schedule – Sequence the project activities, identify and estimate resource requirements and activity durations. Identify the critical path. Present the project schedule as a bar, or Gantt-style chart, including activity relationships (dependencies). Provide a milestone chart for the project illustrating key activities and their expected completion time (weeks from project start). Include intermediate progress reviews, demonstrations or tests, and periodic reporting activities in the schedule. All project deliverables shall be clearly indicated on the project schedule.
Mobilization Plan –In the context of the project schedule, describe the plan to acquire and deploy resources needed for the project, including personnel, facilities, equipment, and other resources, including Government Furnished Equipment (GFE), deemed necessary for project execution.
Organization Chart – Deliver an organization chart for the project illustrating resource roles and reporting relationships. Include all offeror organizations. Clearly highlight organizations that are participating in cost sharing activities. Identify the type of business (large, small, disadvantaged, or educational) for each offeror organization. Provide resumes (2 page maximum) for all key personnel on the project. Resumes shall be organized in an appendix to the proposal. Resumes do not count toward the 20 page limit for the proposal.
Subcontracts/Teaming/Cost Sharing Management Plan – Identify and describe the offeror’s plans for subcontracting, teaming, and cost sharing. Clearly identify the roles and responsibilities of all organizations working within the project team, including technical and financial elements.
Testing Plan - Describe the testing requirements, environments and methods needed to assess or demonstrate the suitability of the technology in the railroad environment and to demonstrate the success of the proposed project. Cite railroad companies or other rail-related organizations, such as railroad industry suppliers, that have expressed their willingness to permit and/or support such testing or demonstrations. Letters or statements attesting to an outside organization’s interest or commitment to permit and/or support testing or demonstrations should be furnished with the proposal as an attachment. Such letters or statements will not count towards the proposal’s 20 page limit.
4.2.3 Capabilities and Experience
Identify and describe the capabilities and experience of key personnel and organizations within the project team as these elements relate to the proposed project specifically and the high speed rail industry as a whole. Describe any relevant technological and scientific, railroad or other industrial or defense capabilities, experience, and resources (or those of its team members) that will serve to demonstrate its ability to successfully conduct the proposed research or technology advancement project. Describe the team member’s (or organization’s) familiarity with or position in the railroad community and access to critical resources for the project.
Describe any unique capabilities that the offeror team possesses that may reduce project risk, may reduce project duration, and/or may improve project financial performance. Describe these capabilities within the context of the objectives of the BAA and the proposed project’s scope of work.
4.2.3.1 QUAD Chart
Include a Quad chart summarizing the project proposal, as per the example and instructions provided in Appendix A. Quad charts shall be submitted electronically in native formats.
4.3 Volume II: Cost and Pricing Proposal
See Appendix B for specific requirements for cost and pricing information content and formatting requirements. Cost and pricing proposals must conform to the requirements in Appendix B and below.
4.3.1 General Requirements
Identify each funding source and their contribution to the whole, expressed as a percentage. Include all anticipated sources, including offeror internal sources, Government funds, and other offeror organizations.