The proposal due date of April 25, 2017, at 2:00 p.m. EST remains the same.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DTFH7117R00011
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sterling VA 20166-6511
EFLHD-CO
21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.
Federal Highway Administration
Sterling VA 20166-6511
EFLHD-AC
21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.
Federal Highway Administration
SEE BLOCK 1404/20/20170001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/04/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project: GWMP 203(2)
The purpose of this Amendment is to revise the Special Contract Requirements (J Pages) to remove the lightweight fine aggregate requirements from Section 501.
The Proposal due date of April 25, 2017, at 2:00 p.m. EST will remain the same.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0001
Info Page
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Project NP-GWMP 203(2)
George Washington Memorial Parkway U.S. Marine Corps War Memorial (Iwo Jima)
Reconstruction of Access Roads, Parking Areas, Sidewalks, and Trails
Solicitation: DTFH71-17-R-00011
The purpose of this Amendment is to revise the Special Contract Requirements (J Pages) to remove the lightweight fine aggregate requirements from Section 501.
The Proposal due date of April 25, 2017, at 2:00 p.m. will remain the same.
SCR_Changes
Special Contract Requirements (J Pages) changes
1. Delete Table 501-1 of the Special Contract Requirements, page J-11, and substitute the following:
Table 501-1 Composition of Concrete
Total Cementitious
Range (Pounds per cubic foot)
Granulated Ground Blast Furnace Slag
Grade 100/120% of
Total Cementitious
Maximum Water/
Cementitious Material
Ratio
Slump (maximum), AASHTO
T 119
Air Content
(minimum)
Shrinkage Aggregate Size
Number
AASHTO M
43(1) (Gallons per cubic yard)
Coarse Aggregate
Size Number
AASHTO
M 43(1)
28-Day Compressive
Strength (minimum), AASHTO
T 22
517- 658 50 - 65 0.45 5 inches
(fixed form) 5.0% 1.5
Or
4000 psi
(1) Meet the processing requirements of AASHTO M 43, Table 1 – Standard Sizes of Processed Aggregate.
2. Delete Subsection 501.03 of the Special Contract Requirements, page J-11.
3. Add the following after Subsection 501.08 of the Special Contract Requirements, page J-14:
501.10. Delete the Subsection and substitute the following:
501.10 Curing. Immediately after finishing and when marring will not occur, cure the surface and exposed sides of concrete for at least 10 days. Do not leave the concrete exposed for more than 30 minutes during the curing period.
Provide initial curing by use of water method for 4 days. Cure according to Subsection 552.15(b). Cover the entire surface of the pavement and edges of the slab with water saturated mats. Extend the mats at least twice the thickness of the pavement beyond the edges of the slab.
Place the mats in complete contact with the surface. Use weights or other approved methods to maintain contact. After 4 days, remove water saturated mats and spray surface of pavement with liquid membrane curing compound according to Subsection 552.15(c). Cure remaining 6 days using liquid membrane curing compound.
Remove forms when the concrete has hardened sufficiently to resist damage, but no earlier than 12 hours after placing concrete. Protect the sides of the exposed slabs with a curing method equal to that provided for the surface. Prevent erosion of the base course beneath the exposed pavement edges until shoulders are constructed.