Report_Bridge_Inspection_2015.pdf

PDF 3 MB Posted

Attached to
George Washington Memorial Parkway Federal contract opportunity
Solicitation number
DTFH71-17-B-00030
Issued by
Department of Transportation Federal Highway Administration

About this file

Report_Bridge Inspection_2015

View the file

Other files for this federal contract opportunity

Other files attached to George Washington Memorial Parkway, newest first.
File Type Posted
Amendment_0005_-_NP-GWMP_210(1).pdf PDF
Amendment_0004_-_NP-GWMP_210(1).pdf PDF
Amendment_0003_-_NP-GWMP_210(1).pdf PDF
Amendment_0002_-_NP-GWMP_210(1).pdf PDF
Amendment_0001_-_NP-GWMP_210(1).pdf PDF
Plans_-_NP-GWMP_210(1).pdf PDF
Report_NEPA.pdf PDF
FP14_Eng.pdf PDF
Report_Certification_Program_for_Bridge_Temporary_Works.pdf PDF
VETS-4212_Form.pdf PDF
Report_GWMP_Transportation_Management_Plan.pdf PDF
IFB_Solicitation_-_NP-GWMP_210(1).pdf PDF
Synopsis_-_NP-GWMP_210(1).doc DOC document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

CIA OVERPASS

CIA ENTRANCE RAMP OVER GWMP

GEORGE WASHINGTON MEMORIAL PARKWAY

LW

STRUCTURE NO. 3300-003P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 4/24/15

Report prepared by: SS

MILE POINT: 2.20

Federal Highway Administration KILOMETER POINT: 3.54 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

STRUCTURE SUMMARY STRUCTURE NO. 3300-003P

CIA OVERPASS INSPECTION DATE: 4/24/15

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... PRESTRESSED CONCRETE NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 10 STRUCT. TOTAL LENGTH: .. 167.3 FT (51.0 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 112.0 FT (34.1 M) WEARING SURFACE: .......... MONOLITHIC CONCRETE DECK WIDTH: ...................... 62.3 FT (19.0 M) ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 54.0 FT (16.5 M)

PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. 1984

PROJ./PLAN REF. NO: ......... 1A12 / 117.1- SKEW ANGLE: ..................... 22 °

NPS ROAD CLASS: .............. 7 - URBAN PARKWAY FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1984-MAJOR RECONSTRUCTION/SUPERSTRUCTURE. 2008-EXPANSION JOINT OVER EAST

PIER REPLACED, APPROACHES REPAVED. 2014-EXPANSION JOINT OVER EAST PIER

LOCATION

GEORGE WASHINGTON MEMORIAL PARKWAY MILE POINT: ..................... 2.20 (KM PT 3.54) STATE: ................................. VIRGINIA LOCATION: 2.2 MILES SOUTH OF I-495. IN

GENERAL VICINITY OF CIA BUILDING. PHONEFACILITY CARRIED: ............ CIA ENTRANCE RAMP

PARK POLICE (202-610-7500) AND CIA DISPATCH

FEATURE INTERSECTED: .. GW MP OFFICE (703-482-4368) ON DAY OF INSPECTION.

STRUCTURE EVALUATION SUMMARY

This three-span multi-girder prestressed concrete bridge is currently in fair to poor condition overall. The main problem is delamination and spalling with exposed rebar throughout the girders, diaphragms, pier caps, and east abutment breastwall. Steel prestressing strands are also exposed on several girders. A particular area of concern is the deterioration at the end of Girders #2 through #4 in the center span near the east pier, as the adjacent east span girders bear on the center span girders at this location. In addition, all of the bridge bearings are corroding.

Other problems include deteriorated silicone sealant in the sidewalks, inadequate anchor bolt lengths for the railing posts, and missing mortar at the top of southeast wingwall.

Since the previous inspection, the expansion joint over the east pier has been replaced.

Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: D.E. KENT, R. PARKER (GANNETT FLEMING)

CONDITION ASSESSMENT:

DANIEL E. KENT, P.E., FIELD TEAM LEADER

REPORT REVIEW :

MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 8/13/15

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3300-003P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

B226 PRIORITY OF IMPROVEMENT

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

58.2 REPLACE SILICONE SEALANT IN SIDEWALK EXPANSION JOINTS. 100 LF

59.1 RESET GIRDER #2 BEARING DEVICE AT EAST PIER, EAST SPAN. 1 LS

58.6 REPLACE RAILING ANCHOR BOLTS AS NECESSARY TO MEET MINIMUM LENGTH

REQUIREMENTS.

1 LS

60.6 REPLACE MISSING MORTAR AT TOP OF SOUTHEAST WINGWALL. 20 LF

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

59.2,6, 60.1,3,13,1

REMOVE DETERIORATED CONCRETE FROM SUPERSTRUCTURE

AND SUBSTRUCTURE ELEMENTS. CLEAN EXPOSED REBAR AND

PRESTRESSING STRANDS. PLACE CONCRETE TO ORIGINAL LINES.

1 LS

58.1 CLEAN AND SEAL CONCRETE DECK SURFACE. 1 LS

59.1 CLEAN AND PAINT BEARINGS. 1 LS

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 3300-003P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

OTHER

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

FOUNDATIONS

CAPS AND/OR BEARING SEATS

PILE BENTS

WALLS AND/OR COLUMNS

PIER(S)

OTHER

SLOPE PROTECTION

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

EXPANSION JOINTS

WEEP HOLES

WINGWALLS

FOUNDATIONS

BACKWALLS AND/OR BULKHEADS

CAPS AND/OR BEARING SEATS

PILE BENTS

BREASTWALLS OR COLUMNS

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

P P N N N F N N G

N G

F N F G N F F N G G G N

F N F N G G N

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

12.

13.

14.

15.

16.

17.

18.

19.

(BURIED)

(BURIED)

58.1 MINOR TRANSVERSE CRACKING OF DECK SURFACE. SAW CUT

FOR SENSOR IN DECK SURFACE FROM MIDSPAN TO WEST END OF

DECK IN WESTBOUND LANE ALONG NORTH CURBLINE HAS BEEN

SEALED IN PAST.

WIDESPREAD MINOR TO MODERATE TRANSVERSE CRACKING OF

DECK UNDERSIDE WITH EFFLORESCENCE. MINOR TRANSVERSE

CRACKING OF UNDERSIDE OF OVERHANGS, SOME WITH

EFFLORESCENCE.

58.2 MINOR ACCUMULATION OF DEBRIS IN STRIP SEAL EXPANSION

JOINT OVER EAST PIER. NEW EXPANSION JOINT INSTALLED SINCE

PREVIOUS INSPECTION OVER EAST PIER.

SILICONE SEALANT IN SIDEWALK EXPANSION JOINTS

DETERIORATED THROUGHOUT.

58.5 MINOR TRANSVERSE CRACKING OF CURBS, SIDEWALKS, AND

MEDIAN WITH EFFLORESCENCE. MINOR TO MODERATE

DELAMINATION AND SPALLING WITH EXPOSED REBAR ON BOTH

SIDEWALKS IN EAST SPAN. MODERATE TO SEVERE

DETERIORATION OF MORTAR BETWEEN SIDEWALK AND GRANITE

CAP FOR NORTHEAST WINGWALL. MINOR OPEN GAP BETWEEN

SIDEWALK AND GRANITE CAP FOR SOUTHWEST WINGWALL.

58.6 SEVERAL RAIL POST ANCHOR BOLTS TOO SHORT TO FULLY

ENGAGE NUT, PRIMARILY NEAR EAST END OF SOUTH RAILING.

END CAP MISSING FROM WEST END OF CENTER RAIL, SOUTH

RAILING.

58.7 DECK DRAINAGE PIPES INSIDE PIERS DISCONNECTED FROM DECK

DRAINS AND NO LONGER IN USE.

58.8 UTILITY ACCESS COVERS RUSTED THROUGHOUT SIDEWALKS.

59.1 MODERATE CORROSION OF ALL BEARINGS; SEVERE CORROSION

WITH SECTION LOSS ON MOST PIER BEARINGS. BEARING SOLE

PLATE FOR GIRDER #2 AT EAST PIER, EAST SPAN, MISALIGNED UP

TO 1".

N G G F G G

N

G

G

F

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION3.

EROSION AND/OR SCOUR2.

ALIGNMENT1.

61. CHANNEL N

222. APPROACHES 6

OTHER 9.

ALIGNMENT 8.

SIGNS7.

SETTLEMENT 6.

EROSION5.

SURFACING4.

APPROACH GUARDRAIL 3.

2. RELIEF JOINTS

APPROACH SLABS1.

(VEGETATION)

N N N G G F G G P

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION5.

EROSION AND/OR SCOUR4.

FOUNDATION3.

WEEP HOLES2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDSD.

APPROACH GUARDRAILSC.

TRANSITIONSB.

BRIDGE RAILINGSA. 1

N N N

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

59.2 MINOR EFFLORESCENCE THROUGHOUT PRESTRESSED GIRDERS.

MINOR VERTICAL CRACKING OF EXTERIOR GIRDERS AT END

SPANS; MODERATE EFFLORESCENCE ON GIRDER #1 IN EAST SPAN.

MODERATE CRACKING, DELAMINATION, AND SPALLING WITH

EXPOSED REBAR ON CENTER SPAN GIRDER ENDS OVER BOTH

PIERS; MODERATE TO SEVERE DELAMINATION AND SPALLING WITH

EXPOSED REBAR ON ENDS OF CENTER SPAN GIRDERS #2 - #4

OVER EAST PIER. (NOTE THAT CENTER SPAN GIRDER ENDS SERVE

AS BEARING SEATS FOR EAST AND WEST SPAN GIRDERS.) MINOR

TO MODERATE DELAMINATION AND SPALLING WITH EXPOSED

REBAR AND PRESTRESSING STRANDS ON BOTTOM FLANGE OF

EAST AND WEST SPAN GIRDER ENDS, GIRDERS #2 - #9, AT PIERS.

MINOR SPALL WITH EXPOSED REBAR, BOTTOM FLANGE OF GIRDER

#6, EAST SPAN NEAR EAST ABUTMENT.

MINOR SPALL WITH EXPOSED REBAR STIRRUP, BOTTOM FLANGE

OF GIRDER #1, CENTER SPAN NEAR WEST PIER. MINOR SPALL

WITH EXPOSED REBAR AND TWO MINOR AREAS OF DELAMINATION,

BOTTOM FLANGE OF GIRDER #2, CENTER SPAN OVER

NORTHBOUND LANES. SEVERAL MINOR AREAS OF DELAMINATION,

WEB AND BOTTOM FLANGE OF GIRDER #2, CENTER SPAN OVER

MEDIAN AND SOUTHBOUND LANES (TWO DELAMINATED AREAS AT

NORTH FACE OF GIRDER #2 OVER SOUTHBOUND LANES COULD

FALL ON TRAFFIC). MINOR SPALLING WITH EXPOSED REBAR, TOP

FLANGE OF GIRDER #2, CENTER SPAN OVER SOUTHBOUND LANES.

MINOR SPALL WITH EXPOSED PRESTRESSING STRAND, BOTTOM

FLANGE OF GIRDER #3, CENTER SPAN NEAR EAST PIER.

MODERATE SPALL WITH EXPOSED REBAR AND PRESTRESSING

STRANDS, BOTTOM FLANGE OF GIRDER #3, CENTER SPAN OVER

NORTHBOUND LANE (VISUAL INSPECTION OF GIRDERS OVER

TRAVEL LANES DURING THIS INSPECTION).

MINOR DELAMINATION AND SPALLING, BOTTOM FLANGE OF ALL

BEAMS, WEST SPAN AT WEST ABUTMENT. MINOR AREA OF

DELAMINATION, BOTTOM FLANGE OF GIRDER #3, MID-LENGTH OF

WEST SPAN.

59.6 MINOR HORIZONTAL CRACKING OF SEVERAL DIAPHRAGMS.

MODERATE CRACKING, DELAMINATION, AND SPALLING WITH

EXPOSED REBAR ON END DIAPHRAGMS AT BOTH ENDS OF CENTER

SPAN OVER PIERS. MINOR TO MODERATE SPALLING WITH

EXPOSED REBAR ON SEVERAL OTHER END DIAPHRAGMS, END

SPANS OVER PIERS.

60.1,3 MINOR VERTICAL CRACKING OF ABUTMENT BREASTWALLS AND

BEARING SEATS. MODERATE CRACKING, DELAMINATION, AND

SPALLING WITH EXPOSED REBAR ON BEARING SEAT AREA AT

SOUTH END OF EAST ABUTMENT BREASTWALL.

60.6 MINOR DETERIORATION OF AND EFFLORESCENCE FROM MORTAR

JOINTS ON ALL WINGWALLS. MINOR MISSING MORTAR BETWEEN

GRANITE CAP AND TOP OF SOUTHEAST WINGWALL. MINOR

CRACKING OF GRANITE CAP AT RAIL POST ATTACHMENTS OVER

BOTH WINGWALLS AT EAST ABUTMENT.

ADDITIONAL ITEM REFERENCE AND REMARKS

60.7 MINOR RUSTING OF WEEP HOLE PIPES.

60.11 SMALL SIZE RIPRAP ON ABUTMENT SLOPES.

60.13 MINOR DELAMINATION AT TOP OF CENTER COLUMN, EAST FACE OF WEST PIER. MINOR VEHICLE SCRAPES ON

SOUTH AND CENTER COLUMNS, WEST FACE OF EAST PIER.

60.15 MODERATE TO SEVERE CRACKING, DELAMINATION, AND SPALLING WITH EXPOSED AND RUSTED REBAR THROUGHOUT BOTH PIER CAPS, PRIMARILY EAST CAP; PREVIOUS REPAIRS EXHIBIT MODERATE TO SEVERE

DETERIORATION.

222.6 MODERATE SETTLEMENT OF SOUTH SIDEWALK AT WEST APPROACH. MODERATE SETTLEMENT OF CURBS AT

BOTH APPROACHES.

222.7 REFLECTIVE OBJECT MARKERS AT UNDERPASS APPROACHES ON SOUTH END OF EAST PIER AND NORTH END

OF WEST PIER.

222.9 PREVIOUS MODERATE TO HEAVY VEGETATION AND TREES OVERHANGING EASTBOUND LANE AT WEST

APPROACH HAVE BEEN REMOVED.

STRUCTURE LOAD RATING STRUCTURE NO. 3300-003P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 15 14 25 23

HS 23 21 39 35

TYPE 3 23 21 38 34

TYPE 3S2 26 24 44 40

TYPE 3-3 29 26 48 43

DESIGN LOADING: H20 (M18)

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

X CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: RATING HAS BEEN REDUCED DUE TO DETERIORATION OF SUPERSTRUCTURE. STRUCTURE DOES NOT

REQUIRE POSTING AT THIS TIME, HOW EVER.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-003P

STRUCTURE IDENTIFICATION

(201) PARK: GEORGE WASHINGTON MEMORIAL PARKWAY

(202) STRUCTURE NAME: .......... CIA OVERPASS

(203) STRUCTURE KIND: ............ 1 - BRIDGE

(204) STRUCTURE NUMBER: ..... 3300-003P

(205) NPS REGION: .................... 2 - NATIONAL CAPITAL

(206) ROUTE CODE NUMBER: ... 210

(207) ROAD SECTION NO: .......... 003P

(208) NPS ROAD CLASS: ............ 7 - URBAN PARKWAY

(209) WITHIN NPS BNDRY?: ....... YES

(210) OPERATING UNIT: ............. PARK

(211) PROJECT NO(S): ................ 1A12

(212) DRAWING NUMBERS: ....... 117.1-

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE

(22) OWNER: ............................... 01 - STATE HIGHWAY AGENCY

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY/PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR: ..

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORICAL DESIGNATION: ..

513 - VIRGINIA (VA)

059 - FAIRFAX

162000010

GWMP

CIA ENTRANCE RAMP

3300003P0000000

2.2 MILES SOUTH OF I-495.

99.99 FT (99.99 M)

2.20 (KM PT 3.54)

3 - FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

5 - PRESTRESSED CONCRETE

02 - STRINGER/MULTI-BEAM or GIRDER

112.0 FT (34.1 M)

167.3 FT (51.0 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 1 - MONOLITHIC CONCRETE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... YES

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 4 - H20 (M18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 23.4 TONS (21.2 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 39.1 TONS (35.5 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 4/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-003P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 38°57'30.10"

(17) LONGITUDE: ......................... 77°08'36.60"

(19) DETOUR LENGTH: ............... 0 MI (0 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 05

(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN

(42B) SERVICE UNDER: .............. 1 - HIGHWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... N

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 8.3 FT (2.5 M)

(56) LEFT: ......................... 8.1 FT (2.5 M)

(51) CURB TO CURB WIDTH: ........... 54.0 FT (16.5 M)

(52) DECK WIDTH: ............................ 62.3 FT (19.0 M)

(32) APPR. ROADWAY WIDTH: ........ 54.0 FT (16.5 M)

(213) APPR. PAVEMENT WIDTH: ..... 54.0 FT (16.5 M)

LEFT SHOULDER: .................. 0.0 FT (0.0 M)

RIGHT SHOULDER: ................ 0.0 FT (0.0 M)

(33) BRIDGE MEDIAN: ....................... 2 - CLOSED MEDIAN (no barrie

(34) SKEW ANGLE: ............................ 22 °

(35) DECK FLARE?: ........................... NO

(47) TOTAL HORIZ. CLEARANCE: .... 24.0 FT (7.3 M)

(50) SIDEWALKS:

LEFT : ...................................... 2.9 FT (0.9 M)

RIGHT : ................................... 2.9 FT (0.9 M)

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE

MATERIAL: .............................. 4 - STEEL

DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL

(215) BRIDGE RAIL HEIGHT: ............ 3.67 FT (1.12 M)

(53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 15.17 FT (4.62 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL: .......................... N

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK: .............. 35 - GENERAL REHAB

(75B) WORK DONE BY: ............. 1 - CONTRACT

(76) IMPROVEMENT LENGTH: .. 167.0 FT (50.9 M)

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

N - Not over waterway.

2 - REHAB/RECONSTRUCTION

B - MAJOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1984-MAJOR RECONSTRUCTION/SUPERSTRUCTURE. 2008-EXPANSION JOINT OVER EAST PIER REPLACED, APPROACHES

REPAVED. 2014-EXPANSION JOINT OVER EAST PIER REPLACED.

(231) ADDITIONAL CONSIDERATIONS:

PHONE PARK POLICE (202-610-7500) AND CIA DISPATCH OFFICE (703-482-4368) ON DAY OF INSPECTION. STRUCTURE IS USED FOR

ACCESS/EGRESS TO CIA ENTRANCE GATE. DO NOT PHOTOGRAPH THE GATE OR VEHICLES.

(330) ADDITIONAL CONFIG. INFO.:

APPENDIX STRUCTURE NO. 3300-003P

PHOTOGRAPHS STRUCTURE NO. 3300-003P

PHOTO #1 - LOOKING EAST TOWARD POTOMAC RIVER

PHOTO #2 - NORTH SIDE

PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING WEST

PHOTO #4 - GENERAL UNDERSIDE VIEW OF CENTER SPAN LOOKING

WEST

PHOTO #5 - VEGETATION GROWTH OBSCURING WEST APPROACH OF

BRIDGE FOR EASTBOUND ROADWAY REMOVED SINCE PREVIOUS

INSPECTION

PHOTO #6 - DETERIORATION OF SOUTH SIDEWALK AT EAST SPAN

PHOTO #7 - NEW EXPANSION JOINT OVER

EAST PIER INSTALLED SINCE PREVIOUS

INSPECTION

PHOTO #8 - TYPICAL SHORT RAIL POST

ANCHOR BOLTS, EAST END OF NORTH

RAILING SHOWN

PHOTO #9 - TYPICAL TRANSVERSE AND

DIAGONAL CRACKING OF DECK SURFACE,

CENTER SPAN SHOWN

PHOTO #10 - TYPICAL DETERIORATION OF

SILICONE SEALANT IN SIDEWALK EXPANSION

JOINTS, NORTH SIDEWALK OVER WEST

ABUTMENT SHOWN

PHOTO #11 - GENERAL VIEW OF EAST ABUTMENT

PHOTO #12 - TYPICAL RUSTING AND SECTION LOSS OF BEARINGS

UNDER EXTERIOR BEAMS AT ABUTMENTS, BEAM #1 AT EAST

ABUTMENT SHOWN

PHOTO #13 - TYPICAL CONDITION OF

INTERIOR BEARINGS AT ABUTMENTS,

BEARING #9 AT EAST ABUTMENT SHOWN

PHOTO #14 - DETERIORATION OF BEARING

SEAT AREA AT SOUTH END OF EAST

ABUTMENT BREASTWALL

PHOTO #15 - TYPICAL TRANSVERSE

CRACKING OF DECK UNDERSIDE WITH

EFFLORESCENCE, BAY #1 OF EAST SPAN

SHOWN

PHOTO #16 - TYPICAL DETERIORATION OF

PIER CAPS, WEST FACE OF EAST PIER CAP

SHOWN

PHOTO #17 - TYPICAL DETERIORATION OF

PIER CAPS, UNDERSIDE OF EAST PIER CAP

BETWEEN SOUTH AND CENTER COLUMNS

SHOWN

PHOTO #18 - TYPICAL DETERIORATION OF

BEAM ENDS FOR EAST SPAN, BEAM #2 OVER

EAST PIER SHOWN; NOTE DETERIORATED

BEARING DEVICE AND EXPOSED

PRESTRESSING STRANDS

PHOTO #19 - TYPICAL RUSTING AND SECTION LOSS OF BEARINGS,

BEAM #2 OVER EAST PIER SHOWN

PHOTO #20 - TYPICAL DETERIORATION OF END SPAN BEAM ENDS AT

PIERS, BEAM #4 FOR EAST SPAN SHOWN

PHOTO #21 - TYPICAL DETERIORATION OF END SPAN DIAPHRAGMS,

BAY #3 OVER EAST PIER SHOWN

PHOTO #22 - TYPICAL DETERIORATION OF END SPAN DIAPHRAGMS,

BAY #8 OVER EAST PIER SHOWN

PHOTO #23 - DETERIORATION OF CENTER

SPAN BEAMS #2 AND #3 OVER EAST PIER

PHOTO #24 - DETERIORATION OF CENTER

SPAN BEAM #2 OVER EAST PIER; NOTE

EXPOSED REBAR

PHOTO #25 - DETERIORATION OF CENTER

SPAN BEAM OVER EAST PIER; NOTE EXPOSED

REBAR

PHOTO #26 - SPALLING WITH EXPOSED

REBAR IN TOP FLANGE OF BEAM #2, CENTER

SPAN OVER SOUTHBOUND LANES; NOTE

DELAMINATION OVER SOUTHBOUND LANE OF

UNDERPASS ROADWAY

PHOTO #27 - SPALLING WITH EXPOSED REBAR AND PRESTRESSING

STRANDS IN BOTTOM FLANGES OF BEAMS #2 AND #3, CENTER SPAN

OVER NORTHBOUND LANE SHOWN

PHOTO #28 - SPALLING WITH EXPOSED REBAR AND PRESTRESSING

STRANDS OF BEAM #3 IN CENTER SPAN OVER NORTHBOUND LANE OF

UNDERPASS ROADWAY

PHOTO #29 - DELAMINATED AREA ON UNDERSIDE OF BEAM #2,

CENTER SPAN OVER SOUTHBOUND LANE OF UNDERPASS ROADWAY

PHOTO #30 - GENERAL VIEW OF WEST PIER, EAST FACE; NOTE

SPALLING WITH EXPOSED REBAR

PHOTO #31 - MISSING MORTAR BETWEEN GRANITE CAP AND TOP OF

SOUTHEAST WINGWALL