Report_Bridge_Insp_Rpt_STR_4290-006P.pdf
PDF 3 MB Posted
- Attached to
- Colonial National Historical Park Federal contract opportunity
- Solicitation number
- DTFH71-17-B-00021
About this file
Report_Bridge Insp Rpt_STR#4290-006P
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO_-_NP-COLO_1A19,_1D45.pdf | ||
| IFB_Solicitation_-_NP-COLO_1A19,_1D45.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| FP14_Eng.pdf | ||
| Report_NEPA.pdf | ||
| Report_Bridge_Insp_Rpt_STR_4290-002P.pdf | ||
| VETS-4212_-_Form.pdf | ||
| Plans_-_NP-COLO_1A19,_1D45.pdf | ||
| Report_Bridge_Insp_Rpt_STR_4290-025P.pdf | ||
| Synopsis__-_NP-COLO_1A19,_1D45.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 4290-006P
U.S. ROUTE 17 PARKWAY BRIDGE INSPECTION DATE: 6/8/15
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... STEEL NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 7 STRUCT. TOTAL LENGTH: .. 103.0 FT (31.4 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 51.5 FT (15.7 M) WEARING SURFACE: .......... NONE DECK W IDTH: ...................... 43.7 FT (13.3 M) ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB W IDTH: ..... 36.0 FT (11.0 M)
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 1A3 / 3006A SKEW ANGLE: ..................... 23 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO STRUCTURE HISTORY: ...... 1985-JOINT REPAIR. 2011-SUPERSTRUCTURE REPAINTED, DECK UNDERSIDE AND
ABUTMENT BREASTWALL CONCRETE REPAIRS.
LOCATION
COLONIAL NATIONAL HISTORICAL PARK MILE POINT: ..................... 0.41 (KM PT 0.66) STATE: ................................. VIRGINIA LOCATION: 1.0 MILE SOUTH OF ROUTE 238.
FACILITY CARRIED: ............ COLONIAL PARKWAY
FEATURE INTERSECTED: .. U.S. ROUTE 17
STRUCTURE EVALUATION SUMMARY
This steel multi-beam bridge is in fair condition overall. Current problems include deterioration of the deck, curb, and parapet expansion joints; deterioration of the brick masonry at the parapets, west abutment breastwall, and wingwalls;
transverse cracking of the deck surface and underside; and outward rotation of the northeast, northwest, and southeast wingwalls. The rotation of the wingwalls appears to have stabilized, and will continue to be monitored during future inspections.
It should be noted that the settlement of the west approach slab has contributed to a full length, 1-3/4" wide gap along the north curb that can be probed up to 17" deep. In addition, settlement of the east approach slab has contributed to a 30' long, 1/2" wide gap along the north curb that can be probed up to 21" deep (6" deep previously). Evidence of ponding was not observed due to dry conditions at this location during this inspection; however, historically severe ponding has been noted after periods of heavy rainfall. This situation poses a threat to the traveling public, as the ponding has encroached into the travel lanes and formed an icy surface during the winter months. Consideration should be given to installing a drop inlet at this location in order to mitigate further drainage problems.
Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: K.M. GREEN, J.C. KEETON (CLARK NEXSEN)
CONDITION ASSESSMENT:
KATIE M. GREEN, PE, FIELD TEAM LEADER
REPORT REVIEW :
CARLOS CASTRO, P.E., FIELD TEAM LEADER 571-434-1546
REPORT APPROVAL: DATE: 10/29/15
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 4290-006P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
58.2 CLEAN AND RESEAL DECK, CURB, AND PARAPET EXPANSION JOINTS. 88 LF
58.1,5, 59.8, 60.15
CLEAN EXPOSED REBAR ON DECK UNDERSIDE, NORTH CURB, FASCIAE, AND
PIER CAP, AND COAT WITH APPROVED SEALANT.
20 SF
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
58.6, 60.1,6 CLEAN AND REPOINT MORTAR JOINTS IN PARAPETS AND
WINGWALLS; REPLACE BROKEN BRICKS; SEAL CRACK IN WEST
ABUTMENT BREASTWALL.
1 LS
58.2, 222.6 CLEAN AND RESEAL LONGITUDINAL JOINTS BETWEEN APPROACH
SLABS AND CURBS. *ALSO SEE REMARK BELOW.
1 LS
58, 59, 60 CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN/CONSTRUCTION ENGINEERING.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ..
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that the recommended actions will be combined with similar work being performed on other structures.
* Due to the poor drainage at the west approach, consideration should be given to installing a drop inlet at the north shoulder in order to mitigate further drainage problems.
FIELD INSPECTION REPORT STRUCTURE NO. 4290-006P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE
9 EXCELLENT CONDITION
8 VERY GOOD CONDITION - no problems noted.
7 GOOD CONDITION - some minor problems.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration.
5 FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 6
1. DECK SLAB F
2. EXPANSION JOINTS F
3. WEARING SURFACE N
4. RIDEABILITY G
5. CURBS, SIDEWALKS, AND MEDIAN F
6. PARAPETS AND/OR RAILINGS F
7. DRAINS AND DRAINAGE P
8. UTILITIES N
9. DEFLECTION AND/OR VIBRATION G
10. OTHER N
59. SUPERSTRUCTURE 6
1. BEARING DEVICES
2. GIRDERS OR BEAMS
3. ARCH(ES) OR SLAB(S)
4. FLOOR BEAMS AND STRINGERS
5. TRUSSES
6. DIAPHRAGMS AND BRACING
7. PAINT
8. FASCIA(E)
9. DEFLECTION AND/OR VIBRATION
10. ALIGNMENT
11. OTHER
60. SUBSTRUCTURE
ABUTMENTS
1. BREASTWALLS OR COLUMNS
2. PILE BENTS
3. CAPS AND/OR BEARING SEATS
4. BACKWALLS AND/OR BULKHEADS
5. FOUNDATIONS
6. WINGWALLS
7. WEEP HOLES
8. EXPANSION JOINTS
9. EROSION AND/OR SCOUR
10. SETTLEMENT OR DEFLECTION
11. SLOPE PROTECTION
12. OTHER
PIER(S)
13. WALLS AND/OR COLUMNS
14. PILE BENTS
15. CAPS AND/OR BEARING SEATS
16. FOUNDATIONS
17. EROSION AND/OR SCOUR
18. SETTLEMENT OR DEFLECTION
19. OTHER
G F N N N F G F G G N
G N G G N F G G G F N N
G N G N G G N
58.1
58.2
58.5
58.6
ITEM REFERENCE AND REMARKS
MINOR FULL-WIDTH TRANSVERSE CRACKING THROUGHOUT DECK
SURFACE. ISOLATED AREAS OF MINOR DELAMINATION AND
SPALLING THROUGHOUT DECK SURFACE. MINOR EDGE SPALLING
OF DECK SURFACE ALONG WEST EXPANSION JOINT. MINOR
SCALING OF DECK SURFACE ALONG SOUTH CURB OVER PIER.
MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE
THROUGHOUT DECK UNDERSIDE. MINOR SPALLING OF BEAM
BOLSTERS. ISOLATED AREAS OF MINOR DELAMINATION IN DECK
UNDERSIDE. MINOR DELAMINATION AND SPALLING OF DECK
POUR-DOWNS OVER END DIAPHRAGMS ADJACENT TO BEAMS
THROUGHOUT. ISOLATED SPALLING WITH EXPOSED REBAR DUE
TO INADEQUATE CONCRETE COVER IN DECK UNDERSIDE, EAST
SPAN.
MODERATE TO SEVERE DETERIORATION OF PARAPET AND CURB
EXPANSION JOINT SEALS WITH VEGETATION GROWTH. WEST
EXPANSION JOINT FILLED WITH SAND AND GRAVEL; EAST
EXPANSION JOINT PARTIALLY FILLED WITH VEGETATION GROWTH.
LOSS OF ADHESION WITH SEVERAL HOLES FOR 80% OF LENGTH OF
WEST EXPANSION JOINT POURABLE SEAL; MINOR VEGETATION
GROWTH FOR FULL LENGTH. MINOR ADHESION FAILURE OF EAST
EXPANSION JOINT POURABLE SEAL AT ISOLATED LOCATIONS.
LONGITUDINAL JOINT MATERIAL SEPARATED AND TORN BETWEEN
APPROACH SLABS AND CURBS DUE TO SETTLEMENT OF
APPROACH SLABS (SEE 222.6).
MINOR MAP AND TRANSVERSE CRACKING OF CURBS AND
SIDEWALKS. MINOR SPALLING WITH EXPOSED REBAR ON NORTH
CURB, EAST SPAN DUE TO INADEQUATE CONCRETE COVER.
MODERATE SPALLING OF SIDEWALKS AT NORTHEAST AND
NORTHWEST CORNERS DUE TO INADEQUATE ROOM FOR
EXPANSION; PREVIOUSLY REPORTED SPALL AT SOUTHWEST
CORNER HAS BEEN REPAIRED SINCE LAST INSPECTION.
1-3/8" GAP BETWEEN NORTH CURB AND PARAPET AT WEST END.
MODERATE TO SEVERE JOINT SEPARATION AND MORTAR
DETERIORATION ON PARAPETS WITH SEVERAL CRACKED AND
BROKEN BRICKS. MINOR CRACKING OF BRICKS ON EXTERIOR
FACES. LIGHT VEGETATION GROWTH IN MORTAR JOINTS.
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL N
222. APPROACHES 6
OTHER9.
ALIGNMENT8.
SIGNS7.
SETTLEMENT6.
EROSION5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS2.
1. APPROACH SLABS G
F G G G F G F N
223. RETAINING WALL N
OTHER6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 1
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
58.7, 222.6 MODERATE SETTLEMENT OF APPROACH SLABS; 1-1/2" AT WEST
AND 1" AT EAST. 1-3/4"W GAP BETWEEN WEST APPROACH
CONCRETE PAVEMENT AND NORTH CURB FOR FULL LENGTH; GAP
CAN BE PROBED UP TO 17"D. 1/2" GAP BETWEEN EAST APPROACH
CONCRETE PAVEMENT AND NORTH CURB FOR APPROXIMATELY
30'L; GAP CAN BE PROBED UP TO 21" (PREVIOUSLY 6") AND
PARTIALLY FILLED WITH DIRT. PREVIOUS REPORTS OF EVIDENCE
OF SEVERE PONDING ON WEST APPROACH CONCRETE PAVEMENT
AT NORTH SIDE UNABLE TO BE VERIFIED DUE TO DRY CONDITIONS.
MINOR ACCUMULATION OF DEBRIS ALONG BOTH CURBS AT
APPROACHES.
DROP INLET AT NORTH END OF EAST APPROACH.
59.1 UP TO 3/8" PACK RUST BETWEEN GROUT PAD AND MASONRY PLATE
AT EAST ABUTMENT. NORTH SIDE OF BEARING DEVICE BELOW
BEAM #6 AT PIER NOT CLEANED AND REPAINTED; MINOR RUSTING.
MINOR RUSTING OF BEARING MASONRY PLATES BELOW BEAMS AT
ABUTMENTS. ISOLATED ANCHOR BOLT NUTS NOT FULLY SEATED.
59.2,6,7 MINOR PITTING PREDATING PAINT AT ISOLATED LOCATIONS ON
BEAMS AND DIAPHRAGMS. BAY #2 DIAPHRAGM AT BEAM #3
CONNECTION NEAR PIER IN EAST SPAN IS MISSING ONE
CONNECTION BOLT. MINOR SURFACE RUST BEGINNING TO FORM
ON BEAM ENDS AT ISOLATED LOCATIONS. AREA OF PEELING PAINT
(~1 SF) ON SOUTH SIDE OF BEAM #6 WEB AND TOP FLANGE IN
WEST SPAN AT WEST ABUTMENT.
59.8 MINOR VERTICAL CRACKING WITH EFFLORESCENCE AND POPOUTS
ON CONCRETE FASCIAE; MINOR EFFLORESCENCE FROM BRICK
MASONRY MORTAR JOINTS. MINOR SPALLING OF UNDERSIDE OF
FASCIAE IN WEST SPAN. MINOR SPALLING WITH EXPOSED REBAR
DUE TO INADEQUATE CONCRETE COVER ON SOUTH FACE OF
SOUTH FASCIA IN WEST SPAN. MINOR SPALL ON SOUTH SIDE OF
SOUTH FASCIA AT EAST ABUTMENT. MINOR SPALL WITH EXPOSED
REBAR DUE TO COLLISION ON NORTH FASCIA IN WEST SPAN.
60.1 FULL HEIGHT MINOR TO MODERATE VERTICAL AND DIAGONAL
CRACKING OF ABUTMENT BREASTWALLS WITH MOISTURE STAINS ,
MAINLY AT WEEP HOLES. MINOR MAP CRACKING OF BOTTOM 2' OF
WEST ABUTMENT BREASTWALL WITH MOISTURE STAINS. ONE
VERTICAL CRACK IN WEST ABUTMENT BREASTWALL BELOW BEAM
#3 SEALED UP TO MID-HEIGHT. MODERATE TO SEVERE VERTICAL
CRACKING OF MASONRY AT SOUTH SIDE OF WEST ABUTMENT
BREASTWALL. ONE LOOSE BRICK AT TOP OF MASONRY ON NORTH
SIDE OF EAST ABUTMENT BREASTWALL BELOW BAY #6.
60.3 MINOR TO MODERATE VERTICAL CRACKS (1/8"W) IN ABUTMENT
GROUT PADS. MINOR ACCUMULATION OF DEBRIS (UP TO 4"D) ON
ABUTMENT BEARING SEATS. MINOR SPALLING OF GROUT PAD
UNDER BEAM #6 AT WEST ABUTMENT. MINOR SPALL WITH
EXPOSED REBAR ON NORTH SIDE OF BEAM #1 BEARING SEAT AT
EAST ABUTMENT DUE TO INADEQUATE CONCRETE COVER.
60.4 MINOR VERTICAL CRACKING WITH EFFLORESCENCE ON WEST
ABUTMENT BACKWALL.
ADDITIONAL ITEM REFERENCE AND REMARKS
60.6,10 MINOR DETERIORATION OF WINGWALL MORTAR JOINTS WITH MODERATE VEGETATION GROWTH. MINOR SETTLEMENT CRACK IN NORTHEAST WINGWALL NEAR EAST ABUTMENT AND NORTHWEST WINGWALL NEAR
WEST ABUTMENT. LIGHT EFFLORESCENCE ON END PORTION OF NORTHWEST WINGWALL.
APPROXIMATELY 1" OUTWARD ROTATION OF NORTHEAST WINGWALL AND 1/2" OUTWARD ROTATION OF SOUTHEAST WINGWALL (NO CHANGE SINCE LAST INSPECTION); APPROXIMATELY 3/4" OUTWARD ROTATION OF
NORTHWEST WINGWALL (1/2" OUTWARD ROTATION PREVIOUSLY).
60.7 MINOR LOSS OF FILL THROUGH WEEP HOLES WITH VEGETATION GROWTH. SOUTH WEEPHOLE AT WEST
ABUTMENT IS BURIED.
60.9 MINOR EROSION ALONG WEST ABUTMENT UNDER NORTH WEEP HOLE.
60.13,15 MINOR VERTICAL CRACKING OF PIER WALL AND CAP. SEVERAL SPALLS WITH EXPOSED REBAR DUE TO INADEQUATE CONCRETE COVER ON WEST SIDE OF CAP. TWO SMALL SPALLS WITH EXPOSED REBAR DUE TO INADEQUATE CONCRETE COVER ON EAST SIDE OF CAP. MINOR SPALL WITH EXPOSED REBAR DUE TO
INADEQUATE CONCRETE COVER ON NORTH SIDE OF BEAM #5 BEARING SEAT AT PIER.
222.1 MINOR TRANSVERSE CRACK IN SOUTHEAST CORNER OF WEST APPROACH SLAB.
222.2 MINOR TO MODERATE LOSS OF ADHESION AND DETERIORATION OF POURABLE SEALS IN APPROACH RELIEF
JOINTS.
222.3 MINOR CHECKING OF STEEL-BACKED TIMBER APPROACH GUARDRAILS. MINOR SPLITTING OF NORTH
GUARDRAIL, EAST APPROACH. MINOR SPLINTERING OF NORTH GUARDRAIL, WEST APPROACH.
222.7 TYPE 3 OBJECT MARKERS PRESENT AT BOTH APPROACHES.
222.8 BRIDGE ON HORIZONTAL CURVE.
36.B,D APPROACH GUARDRAILS NOT ATTACHED TO PARAPET. RAILING ENDS NOT TERMINATED SAFELY.
STRUCTURE LOAD RATING STRUCTURE NO. 4290-006P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 19 17 32 29
TYPE 3 17 16 29 26
TYPE 3S2 26 24 44 40
TYPE 3-3 32 29 54 49
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 4290-006P
STRUCTURE IDENTIFICATION
(201) PARK: COLONIAL NATIONAL HISTORICAL PARK (1) STATE: ....................................... 513 - VIRGINIA (VA)
(202) STRUCTURE NAME: .......... U.S. ROUTE 17 PARKWAY BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 199 - YORK
(204) STRUCTURE NUMBER: ..... 4290-006P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 3 - NORTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... U.S. ROUTE 17
(207) ROAD SECTION NO: .......... 006P (7) FACILITY CARRIED: .................. COLONIAL PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 4290006P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 1.0 MILE SOUTH OF ROUTE 2
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 1A3 (11) MILE POINT: ............................. 0.41 (KM PT 0.66)
(212) DRAWING NUMBERS: ....... 3006A (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
3 - STEEL
02 - STRINGER/MULTI-BEAM or GIRDER
51.5 FT (15.7 M)
103.0 FT (31.4 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 0 - NONE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)
(66) INVENTORY RATING: ...... 18.9 TONS (17.1 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 31.6 TONS (28.6 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 4290-006P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(51) CURB TO CURB WIDTH: ........... 36.0 FT (11.0 M) (16) LATITUDE: ............................. 37°13'44.00"
(17) LONGITUDE: ......................... 76°30'54.00"
(19) DETOUR LENGTH: ............... 1 MI (2 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 04
(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... N
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 5.0 FT (1.5 M)
(56) LEFT: ......................... 3.0 FT (0.9 M)
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
43.7 FT (13.3 M)
38.0 FT (11.6 M)
30.0 FT (9.1 M)
4.0 FT (1.2 M)
4.0 FT (1.2 M)
0 - NO MEDIAN
23 °
NO
36.0 FT (11.0 M)
2.0 FT (0.6 M)
2.0 FT (0.6 M)
3 - PARAPET ONLY
9 - OTHER
5 - OTHER
3.42 FT (1.04 M)
99.99 FT (99.99 M)
16.00 FT (4.90 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL: .......................... N
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1010
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
C - MODERATE
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1985-JOINT REPAIR. 2011-SUPERSTRUCTURE REPAINTED, DECK UNDERSIDE AND ABUTMENT BREASTWALL CONCRETE REPAIRS.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 4290-006P
PHOTOGRAPHS STRUCTURE NO. 4290-006P
PHOTO #1 - LOOKING WESTBOUND TOWARD WILLIAMSBURG
PHOTO #2 - NORTH SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING EAST
PHOTO #4 - TYPICAL AREAS OF DELAMINATION AND SPALLING OF
DECK SURFACE, DECK SURFACE NEAR CENTERLINE OVER PIER
SHOWN
PHOTO #5 - TYPICAL TRANSVERSE CRACKING
THROUGHOUT DECK SURFACE, WEST SPAN
NEAR MIDSPAN SHOWN
PHOTO #6 - SCALING OF DECK SURFACE
ALONG SOUTH CURB OVER PIER
PHOTO #7 - LOSS OF ADHESION WITH
SEVERAL HOLES IN WEST EXPANSION JOINT
POURABLE SEAL; ALSO NOTE JOINT FILLED
WITH SAND, GRAVEL, AND VEGETATION
GROWTH
PHOTO #8 - GAP BETWEEN WEST APPROACH
PAVEMENT AND NORTH CURB; ALSO NOTE
TYPICAL SEPARATED AND TORN
LONGITUDINAL JOINT MATERIAL BETWEEN
APPROACH SLAB AND CURBS
PHOTO #9 - TYPICAL SPALLING OF SIDEWALKS DUE TO INADEQUATE
ROOM FOR EXPANSION, NORTH CURB, WEST SPAN SHOWN; ALSO
NOTE GAP BETWEEN CURB AND PARAPET
PHOTO #10 - SPALLING WITH EXPOSED REBAR ON NORTH CURB, EAST
SPAN, DUE TO INADEQUATE CONCRETE COVER
PHOTO #11 - OUTWARD ROTATION OF
NORTHEAST WINGWALL
PHOTO #12 - TYPICAL JOINT SEPARATION,
MORTAR DETERIORATION, AND CRACKED
BRICKS ON PARAPETS, NORTH PARAPET AT
EAST APPROACH SHOWN
PHOTO #13 - TYPICAL CHECKING OF TIMBER
APPROACH GUARDRAILS, NORTH GUARDRAIL,
WEST APPROACH SHOWN; ALSO NOTE
SPLINTERING
PHOTO #14 - TYPICAL ACCUMULATION OF
DEBRIS ALONG BOTH CURBS AT
APPROACHES, SOUTH CURB, WEST
APPROACH SHOWN
PHOTO #15 - TYPICAL LOSS OF ADHESION
AND DETERIORATION OF APPROACH
PAVEMENT JOINTS, JOINT IN WESTBOUND
LANE AT WEST APPROACH PAVEMENT SHOWN
PHOTO #16 - GENERAL UNDERSIDE VIEW
LOOKING EAST, WEST SPAN
PHOTO #17 - TYPICAL SPALLING OF BEAM BOLSTERS; WEST SPAN
ALONG SOUTH SIDE OF BEAM #6 SHOWN
PHOTO #18 - TYPICAL TRANSVERSE CRACKING WITH
EFFLORESCENCE THROUGHOUT DECK UNDERSIDE, EAST SPAN
SHOWN
PHOTO #19 - TYPICAL SPALL WITH EXPOSED REBAR IN DECK
UNDERSIDE, EAST SPAN, BAY #6 NEAR EAST ABUTMENT SHOWN
PHOTO #20 - SPALL DUE TO COLLISION ON NORTH FASCIA IN WEST
SPAN
PHOTO #21 - NORTH SIDE OF BEARING DEVICE BELOW BEAM #6 AT
PIER NOT CLEANED AND REPAINTED; ALSO NOTE RUSTING
PHOTO #22 - PACK RUST BETWEEN GROUT PAD AND MASONRY PLATE
AT EAST ABUTMENT; ALSO NOTE TYPICAL VERTICAL CRACKS IN
GROUT PAD
PHOTO #23 - TYPICAL SURFACE RUST ON ISOLATED BEAM ENDS,
BEAM #7 AT EAST ABUTMENT SHOWN; NOTE TYPICAL WET SOIL IN
CONTACT WITH STEEL; NOTE ALSO RUSTING OF BEARING MASONRY
PHOTO #24 - PEELING PAINT ON SOUTH SIDE OF BEAM #6 WEB AND
TOP FLANGE IN WEST SPAN AT WEST ABUTMENT
PHOTO #25 - GENERAL VIEW OF WEST ABUTMENT
PHOTO #26 - MAP CRACKING OF BOTTOM OF WEST ABUTMENT
BREASTWALL WITH MOISTURE STAINS; ALSO NOTE TYPICAL VERTICAL
AND DIAGONAL CRACKING AT WEEP HOLES
PHOTO #27 - SETTLEMENT CRACK IN
NORTHWEST WINGWALL NEAR WEST
ABUTMENT
PHOTO #28 - VERTICAL CRACKING OF
MASONRY AT SOUTH SIDE OF WEST
ABUTMENT BREASTWALL
PHOTO #29 - TYPICAL DETERIORATION OF WINGWALL MORTAR JOINTS
WITH VEGETATION GROWTH, SOUTHWEST WINGWALL SHOWN
PHOTO #30 - GENERAL VIEW OF PIER, WEST SIDE
PHOTO #31 - SPALLS WITH EXPOSED REBAR DUE TO INADEQUATE
CONCRETE COVER ON EAST SIDE OF PIER CAP BELOW BEAM #5
PHOTO #32 - SPALL WITH EXPOSED REBAR ON NORTH SIDE OF BEAM
#5 BEARING SEAT IN WEST SPAN AT PIER DUE TO INADEQUATE
CONCRETE COVER