The Bid Opening date remains January 5 2015.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO_-_NC_ERFO_FSR_2013-1(2).pdf | ||
| FP14_Eng.pdf | ||
| Plans_-_NC_ERFO_FSR_2013-1(2).pdf | ||
| VETS-4212_-_Form.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Soils_and_Foundations_Report.pdf | ||
| IFB_Solicitation_-_NC_ERFO_FSR_2013-1(2).pdf | ||
| Categorical_Exclusion_Form_(NEPA).pdf | ||
| Synopsis_-_NC_ERFO_FSR_2013-1(2).doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DTFH7116B00014
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sterling VA 20166-6511
EFLHD-CO
21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.
Federal Highway Administration
Sterling VA 20166-6511
EFLHD-AC
21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.
Federal Highway Administration
SEE BLOCK 1412/29/20150001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/04/2015
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NC ERFO FSR 2013-1(2)
The purpose of this Amendment is to:
1) Revise the Plans to replace all erosion and sediment control and four detail sheets to meet permit requirements.
2) Provide a summary of responses to question/clarification asked by potential bidder.
The Bid Opening date remains January 5, 2016, at 2:00 p.m. EST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0001
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001 Project NC ERFO FSR 2013-1(2)
Nantahala National Forest Tuni Gap Road (FSR 440)
Solicitation: DTFH71-16-B-00014
The purpose of this Amendment is to:
1) Revise the Plans to replace all erosion and sediment control and four detail sheets to meet permit requirements.
2) Provide a summary of responses to question/clarification asked by potential bidder.
The Bid Opening date remains January 5, 2016, at 2:00 p.m. EST.
Plan Sheet changes
Delete Plan Sheets M1 thru M10, S1, S2, S4, and S6, and substitute the amended Plan Sheets M1 thru M10, S1, S2, 04, and S6.
a) Sheet M1 revised to add texts under Phase II intermediate controls header.
b) Sheet M2 revised to add trout buffer impact table.
c) Sheets M3 and M4 revised to add callout notes and general note.
d) Sheets M5 thur M7 revised to add callout notes, trout buffer impact area, and general note.
e) Sheets M8 thru M10 revised to add callout notes and general notes.
f) Sheet S1 revised to delete detail.
g) Sheet S2 revised to delete check dam detail and replace with fiber roll detail.
h) Sheet S4 revised to delete detail.
i) Sheet S6 revised to modify detail number.
Questions / Clarifications
The following question was submitted via email at eflhd.contracts@dot.gov. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.
The Government’s direct response to the sender may also have been updated below for better clarity.
Subsection 108.01 of FP14 states that (b) No tree cutting will be permitted from April 15 to October 15. Should the Notice to Proceed not be issued prior to April 1, the time frame until the moratorium would not be long enough to safely remove the trees. Can there be any anticipated changes on the moratorium should the Notice to Proceed be issued later than April 1st?
Response: Government anticipates Notice to Procced (NTP) prior to April 1.
mailto:eflhd.contracts@dot.gov
| Amendment 1 info.pdf |
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0001 |
| Project NC ERFO FSR 2013-1(2) |
| Nantahala National Forest |
| Tuni Gap Road (FSR 440) |
| Solicitation: DTFH71-16-B-00014 |
| Plans_Amendment 1.pdf |
| AMEND M1-NC-ERFO FSR 2013-1(2)_E&S Narrative |
| AMEND M2-NC-ERFO FSR 2013-1(2)_E&S Plan |
| AMEND M3-NC-ERFO FSR 2013-1(2)_E&S Plan |
| AMEND M4-NC-ERFO FSR 2013-1(2)_E&S Plan |
| AMEND M5-NC-ERFO FSR 2013-1(2)_E&S Plan |
| AMEND M6-NC-ERFO FSR 2013-1(2)_E&S Plan |
| AMEND M7-NC-ERFO FSR 2013-1(2)_E&S Plan |
| AMEND M8-NC-ERFO FSR 2013-1(2)_E&S Plan |
| AMEND M9-NC-ERFO FSR 2013-1(2)_E&S Plan |
| AMEND S1-NC-ERFO FSR 2013-1(2)_Detail |
| AMEND S2-NC-ERFO FSR 2013-1(2)_Detail(Fiber roll) |
| AMEND S4-NC-ERFO FSR 2013-1(2)_Detail |
| AMEND S6-NC-ERFO FSR 2013-1(2)_Detail |
File details come from the government source that posted it. Updated .