ROBO_-_VA_ERFO_FS_2013-1(1).pdf
PDF 29 KB Posted
- Attached to
- George Washington National Forest Federal contract opportunity
- Solicitation number
- DTFH71-16-B-00006
About this file
Results of Bid Opening.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Plans_VA_ERFO_FS_2013-1(1).pdf | ||
| IFB_Solicitation_-_VA_ERFO_FS_2013-1(1).pdf | ||
| Soils_and_Foundation_Report.pdf | ||
| Categorical_Exclusion_Form_(NEPA).pdf | ||
| FP14_Eng.pdf | ||
| VETS-100A-Form.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Synopsis_VA_ERFO_FS_2013-1(1).doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration
Eastern Federal Lands Highway Division
Bid Opening for
George Washington
National Forest
PROJECT:
VA ERFO FS 2013-1(1)
SOLICITATION NO. DTFH71-16-B-00006
November 24, 2015 at 2:00 p.m.
Sterling, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. DTFH71-16-B-00006
PROJECT NUMBER: VA ERFO FS 2013-1(1)
November 24, 2015, 2:00 p.m. local time
BIDDER BID TOTAL DAYS TOTAL PRICE
Pavkov Contracting Co., Inc. Schedule A $341,225.00
Calendar Days
Schedule A $421,225.00
Estes Bros. Construction, Inc. Schedule A $189,770.50
Calendar Days
Schedule A $224,770.50
Schedule A
Calendar Days
Schedule A
Engineer’s Estimate Schedule A $140,000.00
Calendar Days
Schedule A $220,000.00
The total calendar days bid to complete all contract work must be greater than or equal to ( > ) 30 and less than or equal to ( < ) 80