Plans_-_PRA-NATR_2B5.pdf
PDF 3 MB Posted
- Attached to
- Natchez Trace Parkway 2B5 Federal contract opportunity
- Solicitation number
- DTFH71-16-B-00003
About this file
Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Slides_Schedule_A.pdf | ||
| Amendment_0001_-_PRA-NATR_2B5.pdf | ||
| Bridge_Inspection_Report_2011_and_2013.pdf | ||
| VETS-100A-Form.pdf | ||
| Categorical_Exclusion_Form_(NEPA).pdf | ||
| FP03_Errata.pdf | ||
| IFB_Solicitation_-_PRA-NATR_2B5.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| FP03_Eng_.pdf | ||
| Certification_for_Bridge_Temporary_Works.pdf | ||
| Synopsis_PRA-NATR_2B5.doc | DOC document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R01
STATE PROJECT
SHEET
NO.
REGION
ALSE
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BY
AR
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
RE 4
BRP NO.
-A u g -2
:5
A M
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N A
T R
B P
R O J E
C T
S .d g n
REVISIONSNO. DATE BY REVISIONS NO. DATE BY
Structure Number
NATCHEZ TRACE PARKWAY
5570-028P
EMA BRP-1192
090593
PMIS NO.
NO.
109198
NPS
PRA-NATR 2B5
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
Dan Weston August, 2015
-A u g -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N A
T R
B P
R O J E
C T
S .d g
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
DRAWING TITLESHEET NO.
GENERAL NOTES AND INDEX
GENERAL NOTES:
SPECIFICATIONS:
Construction:
MATERIALS:
(U.S. Customery Units).
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03.
SCOPE OF WORK:
Clean and paint bridge railing and rail posts.
INDEX OF DRAWINGS
Coatings:
Utilities:
A C
T U
A L F I L E R
N A
T R
B
G N .D
G N
Install containment system.
Not to scale
Miscellaneous:
Contact National Park Service, Natchez Trace Parkway.
R04
R03
R02
R01
Remove containment system after painting is complete.4.
3.
2.
1.
Verify locations of utilities in field prior to any work.
Verify all dimensions and locations in field prior to ordering materials.
563-2 for spans 1 and 38 superstructure spot painting.
Furnish Paint System 1 from Table 563-1 for bridge railing and rail posts, and Paint Sytem 4 from Table in spans 1 and 38 as required.
Spot clean and paint steel girders, crossframes and bearings
Rail Details
Span 1 and 38 Typical Section & Framing Plan
Plan and Elevation
General Notes and Index
R02
SHEET
NO.
REGION
ALSE
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BY
AR
U.S. DEPARTMENT OF TRANSPORTATION
-A u g -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N A
T R
B P
R O J E
C T
S .d g
5570-028P
EMA BRP-1192
090593
PMIS NO.
NO.
109198
NPS
PRA-NATR 2B5
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
Dan Weston August, 2015
PLAN AND ELEVATION
-A u g -2
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N A
T R
B P
R O J E
C T
S .d g n
A C
T U
A L F I L E R
N A
T R
B P
E .D
G N
PLAN
ELEVATION
= 320’-0’’
9 Spa. @ 100’-0’’ = 900’-0"
= 500’-0’’
4 Spa. @ 125’-0’’
= 525’-0’’
3 Spa. @ 175’-0’’275’-0’’375’-0’’275’-0’’
= 525’-0’’
3 Spa. @ 175’-0’’6 Spa. @ 100’-0’’ = 600’-0’’
= 500’-0’’
4 Spa. @ 125’-0’’
80’-0’’= 160’-0’’
CL CL
KEY
Expansion
CL
E F E E
E E E E E E EE E E E E
E E
EEEEE F E F FE E FE FE EF F E F E F E EE EF EEF
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 25 26 27 28 29 30 31 32 33 34 35 36 3724
Span number E
F
Expansion
Fixed
Pier #
Span number
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
Abutment 1
(West Abutment)
Abutment 2
(East Abutment)
Pier number
StructureCL
N
CLNatchez Trace Parkway on tangent
T e n n e s s e e R iv e r
40+00 45+00 50+00 55+00 60+00 65+00 70+00 75+00 80+00
4955’-0"
Bridge length = 4,955 ft.
Post Type A
End hand rail
Sta. 75+57.50
Not to scale
CL Pier 17Pier 16
350’-0"
375’-0’’
CL
T y p
Min. clr.
350’-0"
Min. clr.
2 Spans @ 4 Spa @ 80’-0’’
25+00 30+00 35+00
Begin Bridge
Elev. 449.49
Sta. 26+02.50
Post Type A
Begin hand rail
Sta. 26+02.50
Post Type B
Begin hand rail
Sta. 25+62
End Bridge
Elev. 436.90
Sta. 75+57.50
Post Type B
End hand rail
Sta. 75+98
E E
Paint Bridge Rail
SHEET
NO.
REGION
ALSE090593
PMIS NO.
NO.
109198
NPS
PRA-NATR 2B5
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
Structure Number
NATCHEZ TRACE PARKWAY
5570-028P
BRP-1192
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
August, 2015
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
AR RE EMA Dan Weston
R03
SHEET
NO.
REGION
ALSE
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BY
AR
U.S. DEPARTMENT OF TRANSPORTATION
-A u g -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N A
T R
B P
R O J E
C T
S .d g
5570-028P
EMA BRP-1192
090593
PMIS NO.
NO.
109198
NPS
PRA-NATR 2B5
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
Dan Weston August, 2015
-A u g -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N A
T R
B P
R O J E
C T
S .d
C
T U
A L F I L E R
N A
T R
B
T Y P
X S .D
G N
TYPICIAL SECTION
CL
’’ = 1’-0’’2 1Scale:
TYPICAL SECTION
Structure
80’-0"
CLPier 1CLAbutment 1
’’ = 1’-0’’8 1Scale:
FRAMING PLAN
As shown
(Typ.)
’’16 5’’ x 2
1’’ x 22 1L 3
(Typ.)
5’ Riveted plate girder
Note:
Stringer (Typ.)
W 21 x 62
Floor beam (Typ.)
W 30 x 108
Stringer (Typ.)
W 21 x 62
Floor beam (Typ.)
W 30 x 108
(Typ.)
5’ Riveted plate girder as required
Spot clean and paint
SPAN 1 AND 38
1.
& FRAMING PLAN
spot painting of Span 1 and Span 38 steel superstructure.
This sheet provided for informational purposes only for
NO.
REGION
ALSE090593
PMIS NO.
NO.
109198
NPS
PRA-NATR 2B5
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
Structure Number
NATCHEZ TRACE PARKWAY
5570-028P
BRP-1192
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
August, 2015
R04
SHEET
NO.
REGION
ALSE
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BY
AR
U.S. DEPARTMENT OF TRANSPORTATION
-A u g -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N A
T R
B P
R O J E
C T
S .d g
5570-028P
EMA BRP-1192
090593
PMIS NO.
NO.
109198
NPS
PRA-NATR 2B5
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
Dan Weston August, 2015
-A u g -2
M
P R
O J E
C T
S n a tr b B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
N A
T R
B P
R O J E
C T
S .d
RAIL DETAILS
A C
T U
A L F I L E R
N A
T R
B
R A I L
D T S .D
G N
HAND RAIL POST TYPE A
HAND RAIL POST TYPE B
TYPICAL SECTION OVER WINGWALL
10"
6"
"2
8"
4"
CL
’’2
’’2
END ELEVATION FRONT ELEVATION
7"
15°
FRONT ELEVATIONEND ELEVATION
7"
15°
°4
10"
6"
8"
4"
CL
TYPICAL SECTION OVER DECK
Note:
locating reflector tape.
expansion joints as one post for the purpose of at the end of wingwalls. Count double posts at on each side of every second handrail post starting
Place the reflector tape in the position shown
As shown
Handrail post
Handrail post
2"
"8
SCALE: 3’’ = 1’-0’’
SCALE: 3’’ = 1’-0’’
SCALE: 1’’ = 1’-0’’
SCALE: 1’’ = 1’-0’’
and bolts (Typ.)
railing, rail post, plates, Clean and paint bridge and bolts (Typ.)
railing, rail post, plates, Clean and paint bridge
(see Note 1.)
4’’ x 4’’ reflector tape
(see Note 1.)
4’’ x 4’’ reflector tape
’’(Typ.) 8
’’(Typ.) 8
1.
NO.
REGION
ALSE090593
PMIS NO.
NO.
109198
NPS
PRA-NATR 2B5
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
Structure Number
NATCHEZ TRACE PARKWAY
5570-028P
BRP-1192
OVER TENNESSEE RIVER
JOHN COFFEE MEMORIAL BRIDGE
August, 2015
| NATR_2B5_PLANS_100.pdf |
| 1 |
| 2 |
| 3 |
| 4 |
File details come from the government source that posted it. Updated .