Report_Tunnel_Inspection_Buck_Spring_Tunnel.pdf
PDF 3 MB Posted
- Attached to
- Blue Ridge Parkway 2P19, T14 Federal contract opportunity
- Solicitation number
- DTFH71-15-B-00036
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Results_-_PRA-BLRI_2P19 _T14.pdf | ||
| VETS-100A-Form.pdf | ||
| Plans_-_PRA-BLRI_2P19 _T14.pdf | ||
| FP14_Eng.pdf | ||
| Report_NEPA.pdf | ||
| Synopsis_PRA-BLRI_2P19 _T14.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| IFB_Solicitation_-_PRA-BLRI_2P19 _T14.pdf | ||
| Report_Tunnel_Inspection_Tanbark_Ridge_Tunnel.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TUNNEL INSPECTION REPORT
BUCK SPRING TUNNEL
BLUE RIDGE PARKWAY THROUGH BUCK SPRING MOUNTAIN
BLUE RIDGE PARKWAY
NP
STRUCTURE NO. 5140-150P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/26/13
Report prepared by: SP
MILE POINT: 407.25
Federal Highway Administration KILOMETER POINT: 655.39 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP
STRUCTURE SUMMARY STRUCTURE NO. 5140-150P
BUCK SPRING TUNNEL INSPECTION DATE: 6/26/13
TUNNEL IDENTIFICATION AND DESCRIPTION
LINING MATERIAL: ............... CONCRETE MINIMUM VERTICAL CLR: .... 13.5 FT (4.1 M)
SPRINGLINE LENGTH: ........ 29.7 FT (9.1 M) STRUCT. TOTAL LENGTH: ... 468.0 FT (142.6 M)
CURB TO CURB WIDTH: ..... 29.7 FT (9.1 M) YEAR BUILT:
PROJ./PLAN REF. NO: ......... 2T5,2T2,2T10 / 00000 YEAR RECONSTRUCTED:
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD
STRUCTURE HISTORY: ...... 1985-LINING REHABILITATION. 2010-PARTIAL LINING REPAIR AND REPAVED WITH
SHOULDER WORK.
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 407.25 (KM PT 655.39)
STATE: .................................. NORTH CAROLINA LOCATION: 4.6 MILES TO U.S. ROUTE 276
FACILITY CARRIED: ............. BLUE RIDGE PARKWAY
FEATURE INTERSECTED: ... BUCK SPRING MOUNTAIN
STRUCTURE EVALUATION SUMMARY
This concrete lined tunnel is in fair condition overall. The drain chase approximately 280' from the north portal is leaking onto the roadway, which could be hazardous to motorists during freezing weather. The tunnel lining at the drain chases in this section of the tunnel have moderate to severe cracking and spalling with minor to moderate leakage.
Other problems include numerous areas of exposed rebar in the lining and moderate gravel accumulation along the west curbline approximately 420' from the north portal. Since the previous inspection the damaged and missing reflectors along the lining have been replaced. This tunnel is scheduled for rehabilitation under project PRA-BLRI 2T13. The proposed work includes installing several drain chases, replacing the underdrain, and patching holes in the lining.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: P. KUMOR, M. PAGLIARO (GANNETT FLEMING)
CONDITION ASSESSMENT:
PAUL KUMOR, PE, FIELD TEAM LEADER
REPORT REVIEW :
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 10/31/13
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-150P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
B226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
59.1 REPAIR SPALLING WITH EXPOSED REBAR ON CROWN AND LINING OF TUNNEL. 6 SF
222.7 POST CORRECT VERTICAL CLEARANCE SIGNS AT BOTH APPROACHES 2 EA
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
59.4 REPLACE FAILED DRAIN CHASES. 175 LF
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL:
TOTAL ITEMIZED COSTS:
$0
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-150P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
59. TUNNEL 5
F1. LINING
G2. PORTALS
N3. CURBS AND SIDEWALKS
F4. DRAINS AND DRAINAGE
G5. WEARING SURFACE
G6. RIDEABILITY
N7. LIGHTING
G8. OTHER (REFLECTORS)
9. ADEQUACY OF OPENING SUFF
222. APPROACHES 8
N1. APPROACH SLABS
N2. RELIEF JOINTS
N3. APPROACH GUARDRAIL
G4. SURFACING
G5. EROSION
G6. SETTLEMENT
G7. SIGNS
G8. ALIGNMENT
N9. OTHER
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
NA. BRIDGE RAILINGS
NB. TRANSITIONS
NC. APPROACH GUARDRAILS
ND. APPROACH GUARDRAIL ENDS
ITEM REFERENCE AND REMARKS
59.1,4 MINOR SPALLING WITH EXPOSED REBAR ON WEST LINING
APPROXIMATELY 100' AND 105' FROM NORTH PORTAL; SEVERAL
AREAS OF EXPOSED REBAR ON CROWN OF LINING
APPROXIMATELY 300' TO 305' FROM NORTH PORTAL.
NUMEROUS AREAS OF CRACKING WITH EFFLORESCENCE AND
LEAKAGE IN LINING, MAINLY AT DRAIN CHASE AREAS. SEVERAL
AREAS OF MINOR TO MODERATE CRACKING WITH
EFFLORESCENCE IN PREVIOUSLY PATCHED AREAS.
DRAIN CHASES CONSIST OF PVC PIPE AND CAPS, MAINLY AT
NORTH END. NUMEROUS DRAIN CHASES LEAKING STARTING AT
280' TO 400' FROM NORTH PORTAL; LEAKAGE VARIES FROM MINOR
TO MODERATE. DRAIN CHASES HAVE MODERATE TO SEVERE
CRACKING AND SPALLING IN THIS AREA. LEAKAGE ONTO
NORTHBOUND LANE (280' FROM NORTH PORTAL) WAS OBSERVED
DURING THIS INSPECTION, WHICH COULD POSE A HAZARD TO
MOTORISTS DURING FREEZING WEATHER. MODERATE GRAVEL
ACCUMULATION ALONG WEST CURBLINE HAS BEEN REMOVED
SINCE PREVIOUS INSPECTION.
59.2 MINOR DETERIORATION OF PORTAL MASONRY MORTAR. MINOR
EFFLORESCENCE ON MASONRY OF BOTH PORTALS. MINOR
VEGETATION GROWTH ON WEST SIDE OF NORTH PORTAL.
222.7 13'-4" VERTICAL CLEARANCE SIGNS AT NORTH APPROACH; 13'-5"
VERTICAL CLEARANCE SIGN AT SOUTH APPROACH. ACTUAL
VERTICAL CLEARANCE IS 13'-3".
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-150P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... BUCK SPRING TUNNEL (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............3 - TUNNEL (3) COUNTY CODE: ........................ 087 - HAYWOOD
(204) STRUCTURE NUMBER: ..... 5140-150P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... BUCK SPRING MOUNTAIN
(207) ROAD SECTION NO: ..........150P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140150P0000000
(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 4.6 MILES TO U.S. ROUTE 2
(210) OPERATING UNIT: .............BALSAM (10) INV. RTE. - MIN. VERT. CLR: .. 13.33 FT (4.06 M)
(211) PROJECT NO(S): ................2T5,2T2,2T10 (11) MILE POINT: ............................. 407.25 (KM PT 655.39)
(212) DRAWING NUMBERS: ....... 00000 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
18 - TUNNEL
29.7 FT (9.1 M)
468.0 FT (142.6 M)
6 - N/A
6 - N/A
6 - N/A
6 - N/A
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)
(66) INVENTORY RATING: ...... 0.0 TONS (0.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 0.0 TONS (0.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/13 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-150P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 35°25'05.10" (51) CURB TO CURB WIDTH: ........... 29.7 FT (9.1 M)
(17) LONGITUDE: ......................... 82°44'48.90" (52) DECK WIDTH: ............................ 0.0 FT (0.0 M)
(19) DETOUR LENGTH: ............... 50 MI (80 KM) (32) APPR. ROADWAY WIDTH: ........ 38.0 FT (11.6 M)
(28A) LANES ON STRUCT: .......... 00 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)
(28B) LANES UNDER STRUCT: ... 02 LEFT SHOULDER: .................. 8.0 FT (2.4 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 8.0 FT (2.4 M)
(42B) SERVICE UNDER: .............. 0 - OTHER (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 5007 (34) SKEW ANGLE: ............................ 0 °
(30) YEAR OF ADT: ...................... 2013 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 5507 (47) TOTAL HORIZ. CLEARANCE: .... 22.7 FT (6.9 M)
(115) YEAR OF FUTURE ADT: ..... 2033 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 0 - N/A
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 0 - N/A
DESIGN TYPE: ........................ 0 - N/A LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 0.00 FT (0.00 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 13.50 FT (4.11 M)
(54) MIN. VRT. UNDERCLEARANCE: 13.50 FT (4.11 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE: .........N
(60) SUBSTRUCTURE: ..............N
(61) CHANNEL: .......................... N
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ...........N
(36) TRAFFIC SAFETY FEAT: ... NNNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
B - MAJOR
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1985-LINING REHABILITATION. 2010-PARTIAL LINING REPAIR AND REPAVED WITH SHOULDER WORK.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5140-150P
PHOTOGRAPHS STRUCTURE NO. 5140-150P
PHOTO #1 - NORTH PORTAL
PHOTO #2 - SOUTH PORTAL
PHOTO #3 - GENERAL UNDERSIDE VIEW OF TUNNEL LINING LOOKING
SOUTH
PHOTO #4 - GENERAL ROADWAY VIEW LOOKING SOUTH
PHOTO #5 - REPAIRED AREA OF WEST
TUNNEL LINING NEAR NORTH PORTAL
PHOTO #6 - PREVIOUSLY REPORTED SOIL
WASHING THROUGH WEST TUNNEL LINING AT
DRAIN NEAR NORTH PORTAL HAS BEEN
REPAIRED
PHOTO #7 - GENERAL VIEW OF PREVIOUS
REPORTED CRACKING AND SPALLING ALONG
WEST DRAIN CHASE, APPROXIMATELY 25'
FROM NORTH PORTAL HAS BEEN REPAIRED
PHOTO #8 - PREVIOUSLY REPORTED
SPALLING AND LEAKAGE ALONG WEST DRAIN
CHASE APPROXIMATELY 25' FROM NORTH
PORTAL HAS BEEN REPAIRED
PHOTO #9 - CRACKING WITH
EFFLORESCENCE ON WEST TUNNEL LINING
APPROXIMATELY 40' FROM NORTH PORTAL
PHOTO #10 - CRACKING WITH
EFFLORESCENCE ON EAST TUNNEL LINING
APPROXIMATELY 50' FROM NORTH PORTAL
PHOTO #11 - SPALLING WITH EXPOSED REBAR ON WEST TUNNEL
LINING APPROXIMATELY 100' FROM NORTH PORTAL
PHOTO #12 - SPALL WITH EXPOSED REBAR ON WEST TUNNEL LINING
APPROXIMATELY 105' FROM NORTH PORTAL
PHOTO #13 - PATCHING OF SPALLED AREA ON WEST TUNNEL LINING
APPROXIMATELY 110' FROM NORTH PORTAL; NOTE CRACKING WITH
EFFLORESCENCE
PHOTO #14 - PREVIOUSLY REPORTED EXPOSED REBAR ON CROWN
OF TUNNEL LINING APPROXIMATELY 150' FROM NORTH PORTAL HAS
BEEN PATCHED
PHOTO #15 - PREVIOUSLY REPORTED DAMAGED REFLECTOR ON
EAST SIDE APPROXIMATELY 150' FROM NORTH PORTAL HAS BEEN
REPAIRED
PHOTO #16 - SPALL WITH EXPOSED REBAR NEAR CROWN OF TUNNEL
LINING APPROXIMATELY 165' FROM NORTH PORTAL
PHOTO #17 - CRACKING WITH EFFLORESCENCE ON WEST TUNNEL
LINING APPROXIMATELY 165' FROM NORTH PORTAL
PHOTO #18 - PREVIOUSLY REPORTED MISSING REFLECTOR ON EAST
SIDE OF TUNNEL LINING APPROXIMATELY 250' FROM NORTH PORTAL
HAS BEEN REPAIRED
PHOTO #19 - LEAKAGE FROM PREVIOUSLY
REPAIRED DRAIN CHASE ON WEST SIDE
APPROXIMATELY 255' FROM NORTH PORTAL
PHOTO #20 - PREVIOUSLY REPORTED
EXPOSED REBAR NEAR CROWN OF TUNNEL
LINING APPROXIMATELY 255' FROM NORTH
PORTAL HAS BEEN PATCHED; NOTE LEAKAGE
PHOTO #21 - LEAKAGE AT DRAIN CHASE ON EAST SIDE
APPROXIMATELY 280' FROM NORTH PORTAL
PHOTO #22 - REPLACED REFLECTIVE MARKER ON EAST SIDE
APPROXIMATELY 280' FROM NORTH PORTAL
PHOTO #23 - LEAKAGE ON NORTHBOUND
LANE APPROXIMATELY 280' FROM NORTH
PORTAL
PHOTO #24 - LEAKAGE AT EAST DRAIN CHASE
APPROXIMATELY 280' FROM NORTH PORTAL
PHOTO #25 - GENERAL VIEW LOOKING ALONG EAST TUNNEL LINING;
NOTE PREVIOUSLY REPORTED MARKERS HAVE BEEN REPLACED
PHOTO #26 - TWO AREAS OF EXPOSED REBAR IN CROWN OF LINING
APPROXIMATELY 300' FROM NORTH PORTAL
PHOTO #27 - EXPOSED REBAR IN CROWN OF TUNNEL LINING
APPROXIMATELY 300' FROM NORTH PORTAL
PHOTO #28 - HORIZONTAL CRACK WITH EFFLORESCENCE ON EAST
TUNNEL LINING APPROXIMATELY 300' FROM NORTH PORTAL
PHOTO #29 - LEAKAGE ALONG DRAIN CHASE
APPROXIMATELY 300' FROM NORTH PORTAL
ON WEST SIDE; NOTE INSTALLED DRAIN
PHOTO #30 - EXPOSED REBAR ON CROWN OF
TUNNEL LINING APPROXIMATELY 305' FROM
NORTH PORTAL
PHOTO #31 - GENERAL VIEW OF SPALLING ON
EAST TUNNEL LINING APPROXIMATELY 310'
FROM NORTH PORTAL ON EAST SIDE; NOTE
LEAKAGE
PHOTO #32 - CAP IN DRAIN CHASE NEAR
CROWN OF TUNNEL LINING APPROXIMATELY
320' FROM NORTH PORTAL
PHOTO #33 - LEAKING DRAIN CHASE ON EAST
SIDE APPROXIMATELY 350' FROM NORTH
PORTAL
PHOTO #34 - PREVIOUSLY REPORTED
LEAKAGE ON EAST DRAIN CHASE
APPROXIMATELY 380' FROM NORTH PORTAL
PHOTO #35 - LEAKING DRAIN CHASE ON EAST
SIDE APPROXIMATELY 380' FROM NORTH
PORTAL
PHOTO #36 - PREVIOUSLY REPORTED
EXPOSED REBAR APPROXIMATELY 365' FROM
NORTH PORTAL ON EAST TUNNEL LINING HAS
BEEN REPAIRED; NOTE LEAKAGE
PHOTO #37 - LEAKING DRAIN CHASE ON WEST
SIDE APPROXIMATELY 368' FROM NORTH
PORTAL
PHOTO #38 - PREVIOUSLY REPORTED
SPALLING AND LEAKAGE IN DRAIN CHASE ON
EAST SIDE APPROXIMATELY 370' FROM
NORTH PORTAL HAS BEEN REPAIRED
PHOTO #39 - CRACKING WITH
EFFLORESCENCE ON PATCH ON WEST
TUNNEL LINING APPROXIMATELY 400' FROM
NORTH PORTAL; NOTE LEAKAGE
PHOTO #40 - PREVIOUSLY REPORTED
LEAKAGE FROM DRAIN CHASE ON EAST SIDE
APPROXIMATELY 415' FROM NORTH PORTAL
PHOTO #41 - PREVIOUSLY REPORTED
SPALLING AND LEAKAGE ALONG EAST DRAIN
CHASE APPROXIMATELY 450' FROM NORTH
PORTAL HAS BEEN REPAIRED
PHOTO #42 - GENERAL VIEW OF REFLECTIVE
OBJECT MARKERS ON EAST SIDE
APPROXIMATELY 450' FROM NORTH PORTAL
PHOTO #43 - PREVIOUSLY REPORTED
GRAVEL ACCUMULATION ALONG WEST
CURBLINE STARTING APPROXIMATELY 420'
FROM NORTH PORTAL AND EXTENDING
NORTH FOR APPROXIMATELY 30' HAS BEEN
CLEARED
PHOTO #44 - PATCHING ALONG EAST TUNNEL
LINING APPROXIMATELY 450' FROM NORTH
PORTAL
PHOTO #45 - REPLACED REFLECTIVE OBJECT MARKERS
APPROXIMATELY 460' FROM NORTH PORTAL ON EAST SIDE
PHOTO #46 - VERTICAL CLEARANCE SIGN AT NORTH APPROACH
PHOTO #47 - VERTICAL CLEARANCE SIGN AT SOUTH APPROACH