ROBO_PRA-MACA_102(1).pdf
PDF 30 KB Posted
- Attached to
- Mammoth Cave National Park 102(1) Federal contract opportunity
- Solicitation number
- DTFH71-15-B-00023
About this file
Results of Bid Opening.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| IFB_Solicitation_PRA-MACA_102(1).pdf | ||
| Plans_PRA-MACA_102(1).pdf | ||
| VETS-100A-Form.pdf | ||
| FP03_Eng_.pdf | ||
| Synopsis_PRA-MACA_102(1).doc | DOC document | |
| FP03_Errata.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Categorical_Exclusion_Form_(NEPA).pdf | ||
| Pavement_Report.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. DTFH71-15-B-00023
PROJECT NUMBER: PRA-MACA 102(1)
May 28, 2015, 2:00 p.m. local time
BIDDER BID TOTAL DAYS TOTAL PRICE
Bluegrass Contracting Corp. Schedule A $693,436.00 Schedule B $215,280.00 Schedule C $373,285.00 Schedule D $396,108.00
Calendar Days
Schedule A, B, C and D $1,678,109.00
Hydra Engineering, LLC Schedule A $500,487.00 Schedule B $164,385.10 Schedule C $329,681.31 Schedule D $228,256.40
Calendar Days
Schedule A, B, C and D $1,310,809.81
T&T Construction Enterprises Schedule A $574,702.26 Schedule B $200,093.34 Schedule C $370,462.25 Schedule D $260,665.93
Calendar Days
Schedule A, B, C and D $1,603,923.70
Tootle Construction, LLC Schedule A $542,742.16 Schedule B $170,482.03 Schedule C $342,425.65 Schedule D $236,716.80
Calendar Days
Schedule A, B, C and D $1,462,866.64
The total calendar days bid to complete all contract work must be greater than or equal to ( > ) 80 and less than or equal to ( < ) 160.
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. DTFH71-15-B-00023
PROJECT NUMBER: PRA-MACA 102(1)
May 28, 2015, 2:00 p.m. local time
BIDDER BID TOTAL DAYS TOTAL PRICE
Engineer’s Estimate Schedule A $680,000.00 Schedule B $180,000.00 Schedule C $445,000.00 Schedule D $275,000.00
Calendar Days
Schedule A, B, C and D $1,756,000.00
The total calendar days bid to complete all contract work must be greater than or equal to ( > ) 80 and less than or equal to ( < ) 160.
| FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. DTFH71-15-B-00023 � PROJECT NUMBER: PRA-MACA 102(1)�May 28, 2015, 2:00 p.m. local time |
| FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. DTFH71-15-B-00023 � PROJECT NUMBER: PRA-MACA 102(1)�May 28, 2015, 2:00 p.m. local time |
File details come from the government source that posted it. Updated .