PRELIMINARY_LETTER_MT_BLM_W_2510(1).pdf

PDF 32 KB Posted

Attached to
MT BLM W 2510(1), Ruby Creek Road and Day Use Facility Federal contract opportunity
Solicitation number
DTFH70-14-B-00017
Issued by
Department of Transportation Federal Highway Administration

About this file

Preliminary Letter

View the file

Other files for this federal contract opportunity

Other files attached to MT BLM W 2510(1), Ruby Creek Road and Day Use Facility, newest first.
File Type Posted
A001__Ruby_Ck.pdf PDF
Physical_Data_Request_Ruby_Creek.pdf PDF
IFB_Ruby.pdf PDF
http //www.wfl.fhwa.dot.gov/contracting/construction/plans/ruby-creek/ —
PlanRequest_Ruby_Creek.pdf PDF
PRELIMINARY_PLANS_MT_BLM_W_2510(1).pdf PDF
PROJECT_DESCRIPTION_MT_BLM_W_2510(1).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661 Phone 360-619-7700

Fax 360-619-7846

NOTICE TO PROSPECTIVE BIDDERS

RE: MT BLM W 2510(1)

Ruby Creek Road and Day Use Facility Solicitation No. DTFH70-14-B-00014

The attached preliminary plans are being furnished to aid prospective Bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Offerors are encouraged to view the project during fall as conditions permit. After October 31, 2014 access will be weather dependent; contact the Bureau of Land Management for current road conditions at 406-683-8000. No Federal Highway Administration personnel will be available for show-me tours.

Multiple Bid Schedules - The work will be solicited under multiple alternate schedules, with different amounts of work in each schedule. One schedule will be awarded. See the Project Description document for additional details.

Schedule A consists of all roadway work on Ruby Creek Road.

Schedule B consists of all the work in Schedule A and work at Ruby Creek Day Use

Facility.

Schedule C consists of all the work in Schedule A, Schedule B and work at Ruby Creek

Campground.

Project Location and Type of Work - All project work is located in Madison County, Montana on BLM property, approximately 18 miles south of Ennis, Montana.

Ruby Creek Road o From Johnny Ridge Road to the Ruby Creek Boat Day Use Facility (approx. 2.9 miles) - Work on this this segment consists of grading, minor drainage, base, paving and cattle guards.

Ruby Creek Campground – Work consists of re-gravelling the existing campground loop roads (0.6 miles).

Ruby Creek Day Use Facility – work includes a boat ramp, waterline, grading, base rock, aggregate surfacing and minor clearing and grubbing.

Technical Questions – All technical questions must be submitted by email plans_spec@dot.gov (plans_spec@dot.gov) or FAX 360-619-7932

General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.

August 29, 2014

Preliminary Plans letter

Solicitation documents - Documents will be available during the winter of 2014/2015. Please monitor the FedBizOpps (FBO) site for actual date of solicitation release (www.fbo.gov). To receive automatic notification through FBO, select the “Watch this opportunity” feature and follow the steps as indicated.