PROJECT DESCRIPTION_MT OMAD 18(50).pdf
PDF 31 KB Posted
- Attached to
- MT OMAD 18(50) Minuteman Missile Base Roads Federal contract opportunity
- Solicitation number
- DTFH70-12-B-00007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A001_OMAD.pdf | ||
| IFB__OMAD.pdf | ||
| http //www.wfl.fhwa.dot.gov/contracting/construction/plans/omad/ | — | |
| Plan Request for Internet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT OMAD 18(50) Minuteman Missile Base Roads
The work consists of roadway reconditioning, aggregate surfacing, drainage, cattle guard replacement & other smaller items of work.
Location: Various sites in Cascade, Lewis & Clark, and Teton Counties, Montana
Schedules: This work is being bid under 4 schedules, each with differing amounts of work; one schedule will be awarded.
Project length: Schedule A – 49.43 miles; Schedule B – 56.70 miles; Schedule C
– 64.92 miles; and Schedule D – 68.32 miles
Tentative Fixed Completion Date: Fall 2014 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $3,000,000 and $5,000,000
This solicitation is offered as a SMALL BUSINESS SET-ASIDE
DESCRIPTION OF WORK in US CUSTOMARY UNITS
Sc he du le
A
Sc he du le
B
Sc he du le
C
S ch ed ul e D
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes Yes Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes Yes Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes Yes 157 Soil Erosion Control Devices
Temporary Diversion Channel (lnft) Sediment Wattle (lnft)
5,650
6,250
7,850
8,200
158 Watering for Dust Control (mgal) 8,250 9,500 11,000 11,500 DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Class 3, Riprap Headwall (cuyd) 59 60 80 80
MT OMAD 18(50) Minuteman Missile Base Roads Description of Work
Sc he du le
A
Sc he du le
B
Sc he du le
C
S ch ed ul e D
DIVISION 300 – Aggregate Courses 301 Untreated Aggregate Courses (crushed aggregate)
Grading H, A Roads (ton) Grading H, G Roads (ton) Grading H, H Roads (ton) Grading H, I Roads (ton)
75,000 29,000 40,000
75,000 29,000 60,500
75,000 29,000 84,000
12,000 75,000 29,000 84,000
303 Road Reconditioning (STA) 2,609.904 2,993.760 3,427.776 3,607.296 DIVISION 600 – Incidental Construction 602 Culverts
18-Inch Pipe (lnft) 24-Inch Pipe (lnft) 48-Inch Pipe (lnft)
619 Fences, Gates & Cattle Guards Cattle Guard, 20 Feet (Each) Cattle Guard, 24 Feet (Each)
Remove and Reset Fence (lnft)
622 Rental Equipment (yes/no) Yes Yes Yes Yes 623 General Labor (HR) 80 80 80 80 635 Temporary Traffic Control – Flagger (HR) 3,400 3,900 4,500 4,700
| DIVISION 250 – Slope Reinforcement and Retaining Walls |
| DIVISION 300 – Aggregate Courses |