Bid_Tabs.pdf

PDF 34 KB Posted

Attached to
CA FLAP SR36(13a) State Road 36 Humbolt County Tree Clearing Federal contract opportunity
Solicitation number
DTFH6816B00022
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to CA FLAP SR36(13a) State Road 36 Humbolt County Tree Clearing, newest first.
File Type Posted
Bid_Opening_Summary_-_CA_FLAP_SR36(13A).pdf PDF
A002.pdf PDF
A001.pdf PDF
SR36(13)_Cross_Sections_Part_2.pdf PDF
SR36(13)_Cross_Sections_Part_1.pdf PDF
SR36(13)_Cross_Sections_Part_3.pdf PDF
SR36(13A)_Plans.pdf PDF
DTFH68-16-B-00022.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T A B U L A T I O N O F B I D S

Schedule A Total of Bid Items: 1,700,000.00$ $ 1,884,989.00 -23.7% $ 1,296,572.65 82.0% 3,094,539.00$ Project No: CA FLAP SR 36(13A)

Project Name: STATE ROUTE 36 TREE CLEARING

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

1 15101-0000

1 Line A0020 ALL LPSM 202,498.00$ 202,498.00$ 180,000.00$ 125,000.00$ 308,000.00$

2 15206-0000

2 Line A0040 244.110 STA 200.00$ 48,822.00$ 79,799.56$ 28,072.65$ 79,802.00$

3 15301-0000

3 Line A0060 ALL LPSM 40,000.00$ 40,000.00$ 100,000.00$ 50,000.00$ 242,000.00$

4 15501-0000

4 Line A0080 ALL LPSM 5,000.00$ 5,000.00$ 25,000.00$ 19,800.00$ 212,500.00$

5 15701-0000

5 Line A0100 ALL LPSM 200,000.00$ 200,000.00$ 275,000.00$ 148,000.00$ 522,179.00$

6 15703-2500

6 Line A0120 50.0 ACRE 1,500.00$ 75,000.00$ 116,250.00$ 103,000.00$ 119,000.00$

7 20104-0000

7 Line A0140 66.0 ACRE 13,000.00$ 858,000.00$ 759,000.00$ 627,000.00$ 1,087,878.00$

8 62201-0250

8 Line A0160 20 HOUR 100.00$ 2,000.00$ 2,000.00$ 3,000.00$ 4,000.00$

9 62201-0550

9 Line A0180 20 HOUR 160.00$ 3,200.00$ 2,340.00$ 3,000.00$ 4,200.00$

10 62201-1400

10 Line A0200 20 HOUR 200.00$ 4,000.00$ 4,400.00$ 1,800.00$ 5,000.00$

11 62201-3300

11 Line A0220 20 HOUR 140.00$ 2,800.00$ 3,000.00$ 3,000.00$ 5,400.00$

12 62301-0000

12 Line A0240 40 HOUR 65.00$ 2,600.00$ 3,000.00$ 7,600.00$ 9,800.00$

13 62303-1000

13 Line A0260 ALL LPSM 55,000.00$ 55,000.00$ 75,000.00$ 26,400.00$ 16,300.00$

14 63501-0000

14 Line A0280 ALL LPSM 200,000.00$ 200,000.00$ 257,499.44$ 150,000.00$ 471,280.00$

15 63503-1000

15 Line A0300 180 LNFT 6.00$ 1,080.00$ 2,700.00$ 900.00$ 7,200.00$

Engineer's Estimate

15.00$ 5.00$ 40.00$

257,499.44$ 150,000.00$ 471,280.00$

75,000.00$ 26,400.00$ 16,300.00$

75.00$ 190.00$ 245.00$

150.00$ 150.00$ 270.00$

220.00$ 90.00$ 250.00$

117.00$ 150.00$ 210.00$

100.00$ 150.00$ 200.00$

11,500.00$ 9,500.00$ 16,483.00$

2,325.00$ 2,060.00$ 2,380.00$

275,000.00$ 148,000.00$ 522,179.00$

115.00$ 326.91$

100,000.00$ 50,000.00$ 242,000.00$

Hat Creek Construction & Materials, Inc. Steve Manning Construction, Inc. McCullough Construction

326.90$

180,000.00$ 125,000.00$ 308,000.00$

MOBILIZATION

SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

CONTRACTOR QUALITY CONTROL

CLEARING

DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

BULLDOZER, 250HP MINIMUM FLYWHEEL POWER

HYDRAULIC EXCAVATOR, 3/4 CUBIC YARD MINIMUM CAPACITY

GENERAL LABOR

SOIL EROSION CONTROL

SOIL EROSION CONTROL, MULCHING, HYDRAULIC METHOD

SPECIAL LABOR, HIRED TECHNICAL SERVICES(ENVIRONMENTAL SURVEYS)

TEMPORARY TRAFFIC CONTROL

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

CONSTRUCTION SCHEDULE

25,000.00$ 19,800.00$ 212,500.00$

File details come from the government source that posted it. Updated .