deva112A003.pdf
PDF 1 MB Posted
- Attached to
- CA PRA DEVA 11(2), Bonnie Clare Road Federal contract opportunity
- Solicitation number
- DTFH68-09-B-00019
About this file
Amendment A003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| deva112A002.pdf | ||
| deva112A001.pdf | ||
| IFB.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E-40
PRA-DEVA 11(2)
Bonnie Clare Road
Add the following:
At least 5 days prior to the preconstruction conference, designate in writing an Erosion Control Supervisor who is responsible for implementing the requirements of this Section. Do not designate the project superintendent as the Erosion Control Supervisor.
When temporary erosion control measures are required due to the Contractor's negligence, carelessness, or failure to install permanent controls as part of the work in a timely manner, provide temporary measures at no cost to the Government.
157.14 Acceptance. Add the following:
Soil erosion control will be evaluated under Subsection 106.02 based on the demonstrated ability of the erosion control measures to result in minimal soil erosion, sedimentation and/or siltation, and turbidity increases within or adjacent to the project limits.
Section 158. - WATERING FOR DUST CONTROL
Description
158.01 Add the following:
This work consists of furnishing and applying water to reestablish desert pavement soil crust.
Payment for watering for dust control on unpaved sections of the roadway will be limited to 7 days once finishing is completed.
Construction Requirements
158.03 General. Add the following:
Water will be available at no cost from a hydrant near the roadway at the Sunset Campground. The hydrant is located approximately 52 miles from the beginning of the project. The flow rate is approximately 300-500 gpm.
The water available at Sunset Campground can be used for other construction needs on this project. The water is available at no cost. The amount water allocated to this project is limited to 50,000 gallons per day. Install a meter and check valve (back flow prevention). Record the amount of water used. Submit a weekly report to the CO, which records the amount of water used.
In order to minimize disruption to the campers at Sunset Campground, the contractor will need to set up a stand tank in the special use area which is on the North side of the overflow camping area. This will require approximately 1000’ of temporary above ground water line to run from the hydrant to the stand tank.
Perform watering to reestablish desert pavement soil crust in a manner that avoids runoff scars as directed by the CO. This may require slower operating speeds and lower volumes of water dispersed from the water truck during operation.
Amendment A003 May 18, 2009
E-78
PRA-DEVA 11(2)
Bonnie Clare Road
Section 633. - PERMANENT TRAFFIC CONTROL
633.03 General. Add the following:
Paint backs of all panels (including panels to be reset) with Federal Standard. Color No. 595e #20233. DEVA uses Sherwin Williams color “Desert Sand” “Craftsman Brown” (Paint code 2835) or approved equal.
Section 634. - PERMANENT PAVEMENT MARKINGS
634.03 General. Delete the last sentence of the first paragraph and substitute the following:
Place the centerline stripe along the existing striped centerline, as recorded under Subsection 152.03(n).
Add the following:
The Contractor may use, upon approval, permanent pavement marking materials and layouts meeting current state approved standards that are practiced in the region of the project in lieu of contract requirements, if the state standards meet the requirements of the MUTCD. The material substituted must be equivalent to that required in the specifications. Obtain the CO’s approval before incorporating into the work. When requesting approval, furnish to the CO the applicable state standards (specifications and drawings), manufacturer’s name and address, supplier’s certification indicating material is produced to state approved specifications, pricing data showing cost difference for labor and materials, and any other available information describing application and performance. When directed, submit samples for approval at the Contractor’s expense. Within 14 days, the CO will inform the Contractor as to the acceptance of the request.
The unit price for the contract item(s) will be reduced to reflect any cost savings.
Section 635. - TEMPORARY TRAFFIC CONTROL
635.07 Construction Signs. Add the following to the end of the first paragraph:
Provide the same type of sheeting on all post-mounted construction signs that pertain to the project.
635.13 Temporary Pavement Markings and Delineation. Delete the text and substitute the following:
Before opening a pavement surface to traffic, remove all conflicting pavement markings by sandblasting or other methods that do not damage the surface or texture of the pavement. Make
Amendment A003 May 18, 2009
Untitled
| Text1: |
| Text2: |
| 0: 1 |
| 1: 3 |
| Text3: |
| 0: A003 |
| 1: May 18, 2009 |
| 2: |
| 0: |
| 1: CA PRA-DEVA 11(2) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: TIFFANY ATCHISON
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH68-09-B-00019 |
| 1: 04/21/2009 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 1* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 11 Above |
| Text13: INVITATION FOR BID |
Remove page E-40 and replace with page E-40 dated May 18, 2009. Revises subsection 158.03 Remove page E-78 and replace with page E-78 dated May 18, 2009. Revises subsection 633.03
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .