Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE
PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
3. EFFECTIVE DATE 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
2. AMENDMENT/MODIFICATION NO.
Linda Hennequant, Contracting Officer
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Replace Antenna Towers, Remote Communications Air Ground (RCAG) Facility, Birmingham, AL
Amendment is issued to answer vendor questions, add drawings, and provide revisions. See attached.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Federal Aviation Administration Eastern Acquisitions Southern Region, AAQ-510 1701 Columbia Avenue College Park, GA 30337
Federal Aviation Administration Eastern Acquisitions Southern Region, AAQ-510 1701 Columbia Avenue College Park, GA 30337
4. REQUISITION/PURCHASE REQ. NO.
See Schedule
9A. AMENDMENT OF SOLICITATION
NO.
DTFASA-17-R-00539
1 3
06/05/17
9B. DATED (SEE ITEM 11)
05/05/2017
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X
AMENDMENT 0004
DTFASA-17-R-00539
Replace Antenna Towers, Remote Communications Air Ground
(RCAG) Facility, Birmingham, AL
THIS AMENDMENT IS BEING ISSUED TO INCORPORATE THE FOLLOWING
INFORMATION INTO THE REFERENCED SOLICITATION
QUESTIONS AND ANSWERS
1. QUESTION: While looking at the package I found that there was no mention of who would be responsible for the survey of the tower foundations or the geotechnical soil under the foundations. I Also didn’t find any reference as to who would be responsible any existing phone or computer cables and electric wires or underground pipes or other obstructions. The final question is in reference to the towers themselves. Who is the manufacture and a set of DWG’s on the steel and weights?
FAA ANSWER: The antenna foundation designs are based on a minimum allowable gross bearing of 2300 psf. Reference Drawings BHM-D-1401553- S001 and S002 note number 6.
The local FAA office will have a utility locate performed prior the insurance of the Notice to Proceed. The facility power is overhead; the telephone cable is underground;
and the existing RF cables are as shown on Drawing BHM-D-1401553-C001.
2. QUESTION: During the site visit it was observed that the road starting from the nature preserve and ending at the tower location was poorly maintained and did not to appear to allow vehicles larger than a pick-up truck to pass. Does the existing roadway have a weight limit or any other restrictions that the contractor should be aware of?
FAA ANSWER: The existing road has supported concrete trucks and cranes in the past, servicing the FAA RCAG facility and other cell sites. It is maintained by the State of Alabama Park Service. The Park Service has no restrictions on construction vehicles. FAA recommends that the Contractor take a video and/or pictures of the road at the start of construction.
DELETE AND REPLACE
1. Drawing BHM-D-1401553-S001 dated 3/6/17 (1 page) in its entirety and Replaced with revised drawing BHM-D-1401553-S001 dated 6/1/17 (1 page) which is hereby attached and made part of this Solicitation and any subsequent Contract.
ADDITIONS
1. Drawings STC-BMH-RCAG70/100 dated 6/2/2017 (7 pages) is hereby attached and made part of this Solicitation and any subsequent Contract as Attachment 4. The foundation drawing in included herein, has the dimensions and details that shall take
AMENDMENT 0004 DTFASA-17-R-00539
precedence over the details as shown on both the FAA drawings, BHM-140155-S001 and –S002.
2. Drawings STC-BMH-RCAG60/100 dated 6/5/2017 (7 pages) is hereby attached and made part of this Solicitation and any subsequent Contract as Attachment 5. The foundation drawing in included herein, has the dimensions and details that shall take precedence over the details as shown on both the FAA drawings, BHM-140155-S001 and –S002.
END OF AMENDMENT 0004
H
G
F
E
D
C
B
A
5'-8
SOUAR{
l
70- rt==4t :w==--=il . ii
50----
30---
10---
R
SPLICE SOLT S:
C4l 3/4".0'x 2 3/4"
ASTM A325 PER LEG
<TYP)
SOL TS:
1/ 2",0'x 11/4"
ASTM A325 CTYPl
TOWER JO _fE£T
SCALE: 1/4" • 1'·0"
t>
I I i
<D
«J
F.
J 4
11/4"0 PVC <TYP
OF 4 FOR GROUNDING)
FOR 70 ' TOWERS
/ j O ' \ I ·- . c:-,,_ \
I . 'Y I I
.-()-C:::.- I I : 't' I
I I I / \ 7'-- - I ' ' / ' /
ANCHOR BOLT PATTERN
-· oi.9 ___ _ ,,J.., _/.91'1., __ 1 o·o o·o
I 0·0 -· -·-·-·-·-·-·-·-·r,·0,0
I iol
I
'-"---'-----------i----" - TO EQUIPMENT BUILDING
I
I 0·0 -·-·-·-·-·-·-·-1-·-·-·-·-·-·- 0,0
I I
6'-6"
� �0�7 ____ _!____!___-=-
TOP VIEW
SECTLON
SCALE: 1/2" • 1'·0"
ANCHOR SOLT:
3/4" ASTM A325x 48" Yl/6" HOOK
C4) REQUIRED PER TOWER LEG
C16) REQUIRED PER TOWER
L
NOTES
1. CONCRETE IS A MINIMUM 3000 PSI � 28 DAYS STRENGTH.
2. 70 FT TOWERS ARE GFM MANUFACTURED BY SKY TOWER
MANUFACTURING, MONTROSE, CO ANCHOR BOLTS ARE FURNISHED
WI TH THE TOWER.
3, NOT USED.
4. ANCHOR BOLTS ARE 3/4" 0 FOR 70' TOWERS.
5. ALL REBAR HAS 3" MINIMUM CONCRETE COVER AND SHALL
CONFORM TO THE ASTM A615 GRADE SHOWN.
6, THIS FOUNDATION REQUIRES A MINIMUM ALLOWABLE GROSS
BEARING OF 2300PSF.
7. BASE OF EXCAVATION CLEAN OF ALL DEBRIS AND LOOSE
SOIL.
8-'/'t.1-y OF CONCRETE REQUIRED FOR THIS FOUNDATION.
9. TOWERS ARE FURNISHEO UNASSEMBLED. CONTRACTOR SHALL
NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (CORl WHEN
ANY MISSING TOWER PARTS WERE FOUND.
10. CONTRACTOR SHALL INSTALL ONE SAFETY CLIMBING RAIL <GFMl
PER TOWER. JNSTALLAT!ON DETAILS ARE PART OF THE TOWER
MANUFACTURER DETAILS.
I-
G
F
E
C
Chamfer the perimeter of the tower foundation with 1 ½1
1 X 1 ½ 11 bevel.
C
�1 (12) •ex � GR60 HORIZONTAL
�r
11 1111 I Q I I 1.111111 I
�H BARS Et Y SPACED EACH DIRECTION
AT T�A AND BOTTOM OF CONCRETE
BLOC,
1/{JREQUIRED TOTAL)
� a 1 - 3 EA - 4"13 SCH 40 PVC
1 TO EQUIPMENT SHELTER
•8x/�// GR60 HORIZONTAL BARS
PLACED AT MID-HEIGHT AT PERIMETER
OF CONCRETE BLOCK (4 REQUIRED)
SIDE VIEW
SECJlON
SCALE: 112" • 1'·0"
� u'�v
•6)(' 7 "'-dR60 VERTICAL BARS
OMLT ��ACED THROUGHOUT THE CONCRETE
BLOCK TO SUPPORT THE TOP MAT OF REBAR
THE 3" CONCRETE COVER SHALL BE MNNT NNED
4' liiiiiil
1'
0 4'
SCALE: 1/4" • 1'-0"
0 1' 2'
SCALE: 1 /2" • 1'·0"
8'
5'
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATO - TECHNICAL OPERATIONS EASTERN SERVICE
RCAG
REPLACE ANTENNA TOWERS AND CABLING
70 FT TOWER FOUNDATION DETAILS
BIRMINGHNM
RCV1CllTO (U' I svavt;no 9'f' ORIGW"l SICNto BY•
__ , Ttcmos W.KI/Jler 0($1C.ti£0
TWK
ORA'#?':
CJ<CIC(O
AflPRt:,¥£O &) �AL StCJ,£O BY• z ' AREAi � t,.
DTFASA-17-R-00539 Attachment 1a
File details come from the government source that posted it. Updated .