Specs.pdf
PDF 411 KB Posted
- Attached to
- Buchanan Field PAPI. Concord, CA Federal contract opportunity
- Solicitation number
- DTFASA-17-R-00215
About this file
Specs (pdf)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Drawings.pdf | ||
| Amendment 1.pdf | ||
| Amendment 2.pdf | ||
| Past Performance.pdf | ||
| RFO.pdf | ||
| SF 1413.pdf | ||
| Davis Bacon.pdf | ||
| Davis Bacon.pdf | ||
| Drawings.pdf | ||
| SF 1413.pdf | ||
| Specs.pdf | ||
| Past Performance.pdf | ||
| RFO.pdf | ||
| Amendment 1.pdf | ||
| Specs.pdf | ||
| Past Performance.pdf | ||
| Davis Bacon.pdf | ||
| SF 1413.pdf | ||
| RFO.pdf | ||
| Drawings.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION SPECIFICATIONS
AND DRAWINGS
Installation of THREE
Precision Approach Path Indicator’s to serve Runways 1L, 19R, and 32R at the Buchanan Field Airport in Concord, California
June 15, 2016
Prepared by:
FEDERAL AVIATION ADMINISTRATION
AIR TRAFFIC ORGANIZATION
TECHNICAL OPERATIONS UNIT
WESTERN SERVICE AREA
ENGINEERING SERVICES
NAVAIDS ENGINEERING GROUP
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
01010 SUMMARY OF WORK
DIVISION 2 - SITE WORK
02100 SITE PREPARATION
02200 EARTHWORK
02505 GRANULAR PAVING
DIVISION 3 - CONCRETE
03100 CONCRETE FORMWORK
03200 CONCRETE REINFORCEMENT
03300 CAST-IN-PLACE CONCRETE
DIVISION 16 - ELECTRICAL
ATTACHMENTS:
CONSTRUCTION DRAWINGS
CCR / RWY’S 1L, 19R, and 32R – PAPI’S
01010 - PAGE 1
SECTION 01010
SUMMARY OF WORK
TABLE OF CONTENTS
GENERAL
1.1 SCOPE OF WORK
1.1.1 Installation of the 1L, 19R, and 32R PAPI’s
1.1.2 Removal/Demolition of the existing VASI’s
1.2 REFERENCES
1.3 DRAWINGS
1.3.1 Construction Drawings Provided
1.3.2 As-Built Drawings
1.4 SUBMITTALS
1.4.1 Material
1.4.2 Schedule
1.4.3 Schedule of Values
1.4.4 Safety Plan
1.4.5 Work Plan
1.4.6 Testing
PRODUCTS
2.1 GOVERNMENT FURNISHED MATERIAL
2.1.1 Inventory and Inspection of GFM
2.2 CONTRACTOR FURNISHED MATERIAL
2.3 MATERIAL
2.3.1 External Hardware
2.3.2 Galvanized Rigid Metal Conduit (GRMC)
2.3.3 Anti-oxidant compound
2.3.4 Asbestos Free Material
2.3.5 Rotomill Material
EXECUTION
3.1 SCHEDULES
3.1.1 Construction Duration
3.1.2 Work Start
3.1.3 Construction Duration
01010 - PAGE 2
3.1.4 Weekly Look Ahead Work Schedule
3.1.5 Deviation from Work Schedule
3.1.6 Daily Construction Log
3.2 PRE-CONSTRUCTION MEETING
3.3 LAYOUT
3.4 SPECIAL REQUIREMENTS
3.4.1 Special Precautions
3.4.2 Safety Requirements
3.4.2.1 Runway Safety and Object Free Areas
3.4.2.2 not used
3.4.2.3 Construction Vehicle Traffic
3.4.2.4 Unauthorized Structures
3.4.2.5 Hazard Marking
3.4.2.6 Safety Plan
3.4.3 Radio Communications
3.4.4 Work Limitations
3.4.4.1 Trenches, Holes, and Excavations
3.4.4.2 not used
3.4.5 Work Plan
3.5 PROTECTION OF EXISTING UTILITIES AND CABLES
3.6 INSTALLATION AND WORKMANSHIP
3.7 TEMPORARY FACILITIES
3.7.1 Temporary Water
3.7.2 Temporary Toilets and Sanitation
3.7.3 Temporary Trash Dumpsters
3.8 AIRPORT SECURITY, BADGING, AND ACCESS
3.9 SAFETY
3.10 SEDIMENTATION, EROSION, AND DUST CONTROL
3.11 ENVIRONMENTAL REQUIREMENTS
3.12 DEBRIS CONTROL AND CLEAN-UP
3.13 INSPECTION & ACCEPTANCE
01010 - PAGE 3
SECTION 01010
SUMMARY OF WORK
PART 1 GENERAL
1.1 SCOPE OF WORK
The work covered under this specification includes the installation of THREE Precision Approach Path Indicator’s (PAPI’s) to serve runways1L, 19R, and 32R at the Buchanan Field Airport in Concord, CA.
The contractor is required to furnish all labor, materials (except Government furnished), services, equipment, insurance, bonds, security notifications, licenses, permits, and fees in accordance with applicable federal, state and local regulatory requirements to complete the specified work. Any miscellaneous labor, equipment and/or materials not specifically detailed or specified, but required to complete the project, shall be provided as an integral part of the work.
The dimensions, measurements, and quantity of materials listed in this specification and on the construction drawings are estimated and are presented to give the contractor an idea of the total scope of work. The contractor is responsible for assuring that the bid reflects all work required to accomplish this project.
1.1.1 Installation of the runway 1L, 19R, and runway 32R PAPI’s
Contractor shall install the two PAPI’s as indicated on the construction drawings. Work includes: Installation of the PAPI Power & Control Stations and LHA’s (Light Housing Assembly’s), Installation of the power service for the PAPI’s, and the installation of maintenance areas for the PAPI’s.
1.1.2 Removal/Demolition of the existing VASI’s
The old runway 1L, 19R, and 32R VASI equipment shall be completely removed and disposed of by the construction contractor. Work includes the removal of all above ground structures, foundations, pull boxes, and underground conduit and cabling (conduit and cable within 10 ft of the structures) associated with these. The sites shall be restored to match the surrounding grade, compaction, and condition. All work shall be to the satisfaction of the FAA and the Airport.
The contractor shall provide documentation to the FAA Project Engineer certifying that all material has been disposed of properly.
01010 - PAGE 4
1.2 REFERENCES
Airport Ground Vehicle Operations Guide available from: http://www.faa.gov/runwaysafety/asw/downloads/AGVO-guide.doc
1.3 DRAWINGS
Callouts on the construction drawings indicate work to be done under this contract unless specifically noted "installed by others" or "existing". Callouts indicating work to be done do not always include the word "install".
1.3.1 Construction Drawings Provided
Drawings applicable to this project are attached.
1.3.2 As-Built Drawings
The contractor shall provide three complete sets of As-Built drawings to the FAA Project Engineer at the end of the project. The following color codes shall be used:
Green -to indicate adding new text and/or new graphics or changes to existing text and/or graphics.
Red - to indicated the removal of existing text and or/ graphics.
Blue - to indicated general information to the Drafter.
Any additional diagrams and/or schematics that would be helpful for the maintenance of the facility should also be included.
1.4 SUBMITTALS
1.4.1 Material
The contractor shall submit for approval; catalog data, cut-sheets, samples, and any other relevant information on the contractor furnished material to be used on this project. Two copies of the submittal package shall be given to the FAA Project Engineer for approval. Submittals on materials shall include, but is not limited to:
- Coated galvanized rigid steel conduit
- Cement concrete material
- Geotextile fabric
- Aggregate material
- Rotomilled asphalt material
- Contractor furnished manholes/pull boxes
- Contractor furnished hardware
- Contractor furnished electrical fittings and components
01010 - PAGE 5
- Contractor furnished cable and wire
- Labels
- Additional items deemed necessary by the FAA Project Engineer
1.4.2 Schedule
Prior to start, the contractor shall submit a schedule and work plan to the Project Engineer for approval. See section 3.1.1 for the maximum time allowed to complete this project. The schedule shall show start dates, duration, and finish dates for each work activity.
The FAA reserves the right to modify the contractor’s sequence of activities in the interest of facility operation and airport safety.
1.4.3 Schedule of Values
The contractor’s proposal shall include a schedule of values, showing at a minimum, a breakdown of cost for each work activity. Cost for each item should include bonding, insurance, profit, and overhead. The cost for the contractor’s efforts towards Airport security, badging, insurance, and mobilization shall be itemized separately.
1.4.4 Safety Plan
The contractor shall submit a safety plan per paragraph 3.4.2.6 of this section.
1.4.5 Work Plan
The contractor shall submit a work plan per paragraph 3.4.5 of this section.
1.4.6 Testing
The contractor shall complete, at his own expense, all testing as required by these specifications.
The results shall be submitted to the FAA Project Engineer. Required testing includes, but is not limited to, the following:
- Cable insulation resistance test (see FAA-C-1217, current version)
- Earth resistance test (see FAA-STD-019, current version)
- All Required Concrete Testing (performed by an independent testing company).
- Soil Compaction Testing (performed by an independent testing company).
PART 2 PRODUCTS
Reference herein or in the construction drawings to any specific commercial product, process, or service, any trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the Federal Aviation Administration.
The contractor may submit a request for substitution of a product, process, or service specifically called out. Such request shall be through the submittal process.
01010 - PAGE 6
2.1 GOVERNMENT FURNISHED MATERIAL
Government furnished material (GFM) for this project is listed as follows:
** Items listed are Per PAPI.
PAPI Equipment (* re-use existing):
Power & Control Cabinet 1 each Light Housing Assembly 4 each
Remote Radio Control Equipment:
Air/Ground – Receiver/Controller 1 each Radio Interface Unit 1 each Ground/Ground Decoder 1 each Ground/Ground Receiver 1 each Ground/Ground Receiver Antenna 1 each
2.1.1 Inventory and Inspection of GFM
The contractor shall sign a copy of the Government furnished material (GFM) list acknowledging receipt of the furnished material, noting any discrepancies if necessary. When the contractor signs for custody, he acknowledges receipt in good condition and assumes responsibility for any subsequent loss or damage. The contractor shall return all GFM that is not installed to the location where the material was picked up.
2.2 CONTRACTOR FURNISHED MATERIAL
The contractor shall furnish all material that is required and not otherwise indicated to be Government furnished. Materials furnished by the contractor shall be new, the standard products of manufacturers regularly engaged in the production of such materials, and of the manufacturer’s latest designs that comply with the specification requirements.
The contractor is responsible for making their own arrangements for material delivery and receiving. The contractor shall not have any material delivered to any FAA offices. Delivery to the Airport address shall only be done with the prior approval from the FAA Project Engineer and the Airport Management.
2.3 MATERIAL
2.3.1 External Hardware
All external hardware shall be stainless steel. All cut edges shall be filed smooth and treated with a cold galvanizing compound.
01010 - PAGE 7
2.3.2 Galvanized Rigid Metal Conduit (GRMC)
All galvanized rigid metal conduit (GRMC) shall be factory coated. Taping and/or painting the GRMC will not be allowed.
2.3.3 Anti-oxidant compound
USE AN APPROVED ANTI-OXIDANT COMPOUND ON ALL INSTALLED HARDWARE
WITH EXTERNAL/INTERNAL THREADS, AND WHERE EMT IS INSERTED INTO
FRANGIBLE COUPLINGS. FAILURE TO DO THIS WILL RESULT IN THE
CONTRACTOR REPLACING ANY ITEMS DAMAGED DUE TO SEIZED, GALLED, OR
STRIPPED THREADS OR CONNECTIONS.
2.3.4 Asbestos Free Material
The Contractor shall not use any asbestos containing material (ACM) at any time during the construction. The Contractor shall verify that all material, including those supplied by third parties, are asbestos free materials. A written certification letter shall be provided by the Contractor to the FAA certifying that the finished work is asbestos free.
2.3.5 Rotomill Material
Rotomill material shall contain a 1 inch maximum aggregate size, and be clean, uniform, and free of foreign debris (including free of concrete, road base, and fabric). Finished rotomilled surfaces shall be compacted and level with straight edges. All material must be approved by the FAA Project Engineer prior to placement.
PART 3 EXECUTION
3.1 SCHEDULES
3.1.1 Construction Duration
All work shall be completed within 24 calendar days after the Notice to Proceed (NTP).
3.1.2 Work Start
The contractor shall not start any work, and the FAA will not schedule any hard start dates for a work start; Until the contractor has met all of the Airport’s requirements for badging and access for all employees and equipment; and actually has in hand the badges and access permits necessary to access and work at the airport.
(See requirements for Airport Security, Badging, and Access below).
01010 - PAGE 8
Once the contractor has met all of the requirements for the Airport’s security, badging, and access – the FAA Project Engineer will schedule the actual start date for construction. This will be dependent on such matters as facility availability, existing work and operations at the airport, availability of key FAA and airport and personnel, and environmental concerns.
3.1.3 Work schedule
No work shall be scheduled on Saturdays, Sundays or legal holidays without prior approval from the FAA Project Engineer.
The contractor shall furnish the FAA Project Engineer with emergency (24 hour) contact phone numbers for the contractor’s superintendent and an alternate individual. Such numbers will be used if the contractor needs to be contacted outside of normal working hours.
3.1.4 Weekly Look Ahead Work Schedule
On a weekly basis, the contractor shall submit a schedule showing activities desired to be performed during the upcoming week. These work activities shall be approved by the FAA Project Engineer.
3.1.5 Deviation from Work Schedule
The FAA and/or Airport Management reserve the right to suspend or stop construction as necessary for the safety of aircraft or airport property. In addition, the FAA may adjust the work schedule and hours to satisfy the facility operations, weather conditions, and maintenance moratoriums.
3.1.6 Daily Construction Log
The Contractor shall keep a Daily Construction Log. At a minimum, the daily log shall contain:
Items accomplished for that day.
Start and stop time of work.
Name of workers (including sub-contractors), and hours they worked for that day.
Weather (including sky, ground moisture conditions, and temperature).
Material received.
Documents and photographs showing the progress of work, and as required.
The Daily Construction Logs shall be turned over to the FAA Project Engineer on a weekly basis.
3.2 PRE-CONSTRUCTION MEETING
Prior to the start of any work and the contractor's access to the work site, the contractor shall be required to attend a pre-construction meeting. Attendees at the meeting may include, but is not
01010 - PAGE 9
limited to, the FAA Project Engineer, Resident Engineer, FAA Contracting Officer, the Airport Manager, Airport Operations, FAA maintenance, and other interested parties as determined by the Project Engineer. Topics at the meeting will include site access, airport security, work safety, work schedule, project expectations, work procedures, emergency plans, and other items relating to the execution of the project.
3.3 LAYOUT/SURVEYING
All layout work shall be accomplished by a Professional Land Surveyor.
The contractor shall verify the field measurements and coordinates indicated on the drawings with the FAA Project Engineer before starting any layout. The contractor shall lay out his work from base lines and bench marks indicated on the drawings and shall be responsible for all measurements in connection therewith.
Facility layout shall be relative to the runway ends. This will require the contractor’s surveyors to physically occupy both ends of a runway. In order to do this while minimizing the time required, and maximizing accuracy – the contractor’s surveyors must use GPS methods.
The contractor shall furnish, at his own expense, all stakes, templates, platforms, equipment, tools, materials and labor as may be required in laying out any part of the work. The contractor is to properly maintain the specified layouts to assure proper alignment of the construction.
Roads indicated to be installed under this contract shall be laid out and clearly marked at the beginning of the project and used as access roads during construction so as to minimize the disturbance to the surrounding areas.
3.4 SPECIAL REQUIREMENTS
3.4.1 Special Precautions
The contractor shall conform to the rules and regulations of the airport and shall coordinate all work with the FAA Project Engineer.
Note: Unscheduled interruptions of the electrical service to FAA facilities may cause aircraft accidents and loss of life. Work requiring a temporary or permanent de-energization of equipment shall be scheduled in writing with the FAA Project Engineer and the onsite FAA maintenance personnel. Only onsite FAA maintenance personnel are authorized to energize/de-energize equipment, or to operate a circuit breaker, switch, or fuse in an FAA facility.
3.4.2 Safety Requirements
Aviation Safety is a primary consideration during airport construction. The Contractor is completely responsible for complying with the Airport’s safety and operation procedures, as dictated by the Airport.
01010 - PAGE 10
During the performance of this contract, the airport runways, taxiways, and aircraft parking aprons shall remain in use by aircraft to the maximum extent possible, CONSISTENT WITH CONTINUAL SAFETY. The contractor shall not allow employees, subcontractors, suppliers, or any other unauthorized person to enter or remain in any airport area which would be hazardous to persons or to aircraft operations.
3.4.2.1 Runway Safety and Object Free Areas
Prior to commencement of work, the contractor shall delineate the boundaries of the safety area with 3/8" x 1 1/2" x 4' long pointed lath (survey sticks) and bright orange flagging.
The contractor shall not be allowed into the Runway Safety Area without prior approval from the FAA Project Engineer and the Airport Manager. In general, no workers or equipment shall be allowed inside the safety area when aircraft are using the runway. Work to be done inside the safety area shall be scheduled and closely coordinated with the FAA Project Engineer and the Airport manager.
The contractor shall not be allowed to place vehicles and/or equipment inside the Runway Object Free Area (OFA) without the approval of the FAA Project Engineer.
In addition to the restrictions of working in the Runway Safety area and Object Free Area, the Airport Manager and/or the FAA Project Engineer may impose more restrictive requirements as needed to maintain airport safety.
3.4.2.2 Not used
3.4.2.3 Construction Vehicle Traffic
The contractors' vehicles and equipment shall enter the work site and construction areas at approved locations, and by way of authorized routes. The use of runways, aprons, taxiways, ramps, will not be permitted unless specifically approved by the FAA Project Engineer and the Airport Manager. The contractor shall inform all personnel that aircraft have the right-of-way at all times. The contractor shall be responsible for maintaining control and security at each entry point, as approved.
At a minimum, all vehicles and motorized equipment that enter the Airport Operations Area (AOA) shall be marked per AC 150/5210-5B (or latest version). In general, all vehicles shall be marked with the Contractor’s name/logo (4” high min lettering) on both sides, and have an approved yellow flashing beacon. Construction equipment, such as backhoes, skid steers, and trailers shall be marked with a three foot by three foot flag with international orange and white 12 inch squares displayed in full view above the equipment. Additional and/or more restrictive requirements may be mandated by the airport.
In addition, no personnel will be permitted to drive on the airside of the airport unless he/she has read, and certified that he/she has read, “ A Guide to Ground Vehicle Operations on an Airport” (DOT/FAA/AS-90-3). A copy of this document is attached at the end of this specification.
01010 - PAGE 11
THE AIRPORT AND/OR THE FAA MAY HAVE ADDITIONAL REQUIREMENTS FOR
VEHICLES, EQUIPMENT, AND PERSONNEL OPERATING INSIDE THE AOA.
3.4.2.4 Unauthorized Structures
The contractor shall install no fences or other physical obstructions on or around the project work area without the approval of FAA Project Engineer.
3.4.2.5 Hazard Marking
The contractor shall use barricades, flashers, flags, traffic cones, signs, etc., for the following:
- To prevent aircraft from taxiing onto a closed runway, taxiway or apron.
- To outline construction/maintenance areas.
- To identify isolated hazard areas such as open manholes, ditches, potholes, waste areas, etc.
- To identify FAA and Airport facilities, cables, power lines, ILS Critical areas, and other sensitive areas, in order to prevent damage, interference and facility shutdown.
All hazard markings shall be furnished and setup by the contractor. Barricades inside the runway safety area shall be lightweight and frangible. For daytime use, barricades should be supplemented by flags; for night time use, they shall have flashing yellow lights. Night time barricades shall not penetrate the approach surface. All markings shall be to the approval of the FAA Project Engineer.
3.4.2.6 Safety Plan
Prior to commencement of work, the contractor shall submit a Safety Plan Compliance Document SPCD per AC 150/5370-2F. This document shall be approved by the Airport and the FAA. The Safety Plan Compliance Document shall detail how the contractor shall comply with the Airport’s Construction Safety and Phasing Plan (CSPP), or absent of a CSPP, shall provide the information in a typical SPCD as indicated in AC 150/5370-2F. The plan shall include, but is not limited to; access to the site, hours of operation, personnel working for the contractor, electrical safety, removal and disposal of material, erosion and dust control, a plan for dealing with hazardous material, and a plan to insure that existing facilities and equipment are not interrupted.
01010 - PAGE 12
3.4.3 Radio Communications
The contractor's superintendent (or someone appointed by the superintendent) shall be required to monitor a transceiver radio at all times when the contractor is operating inside the runway safety area. The transceiver shall be contractor furnished with a frequency range of 118-136 Mhz and tuned to the local ATCT/Unicom frequency, as required.
3.4.4 Work Limitations
For work that requires runway/taxiway closers - such as work required inside the runway/taxiway safety areas – the contractor will be required to provide, set up, operate, maintain, and remove runway/taxiway closure markings, such as runway lighted X’s, low profile barricades, solar barricade lights, plywood barricades, plastic cones, etc., as approved by the Airport and the FAA.
3.4.4.1 Trenches, Holes, and Excavations
The condition of the material to be excavated, bored, drilled, etc., must be determined by the construction contractor. Excavation may require ripping, blasting, cutting, or other means beyond the use of a normal backhoe or drilling equipment.
Trenches, holes, and any other type of excavation within the runway safety area (RSA) are not allowed without the permission and approval of the FAA and Airport Operations. Any work inside the RSA shall be done with the understanding that the area may have to be vacated at any time.
All trenches, holes, and excavation shall be marked, covered and protected, as approved.
3.4.4.2 Not used
3.4.5 Work Plan
Prior to commencement of work, the contractor shall submit a work plan for approval by the Project Engineer (see 1.4). An acceptable work plan shall take into account all areas discussed in this section.
3.5 PROTECTION OF EXISTING UTILITIES AND CABLES
The existing utility lines, utility structures and all underground cables, as may be shown on the drawings are approximate and incomplete. Where excavation occurs in the vicinity of existing utilities or cables, the contractor shall use whatever means necessary, including the use of a private third party cable locator, to locate the existing utilities or cables prior to any excavation.
The contractor shall stake all utility or cable crossings and such areas shall be hand excavated.
The contractor shall immediately repair any damage done by the contractor or suppliers to utilities or cable within the work area.
01010 - PAGE 13
3.6 INSTALLATION AND WORKMANSHIP
All work shall be performed according to the intent of the contract, and normal and accepted industry and Government standards.
All work shall be accomplished by skilled workers regularly engaged in this type of work.
Where required by local regulations, the workers shall be properly licensed. Electrical terminations and splices shall be done by a qualified electrician.
The contractor shall give constant attention to the work to facilitate the progress thereof, and shall cooperate with the Project/Resident Engineer in every way possible. The contractor shall have a competent superintendent on the work site at all times who is fully capable of reading and thoroughly understanding the plans and specifications and shall receive and fulfill instructions from the Project/Resident Engineer.
An initial inspection shall be conducted when a representative sample of work has been completed. This work shall be approved by the FAA Project Engineer or his representative, prior to the commencement of additional work.
All conduits shall be completely cleaned prior to installing cable. A flexible mandrel shall be used to clean out mud, dirt, and debris from the raceways.
Underground conduits shall be installed so that no water can be trapped in the raceway (water must able to drain out of one end).
All foundations, pull boxes, equipment racks, and other above ground structures shall be installed square (perpendicular and parallel) to the runway centerline, prevailing structure or road as indicated on the drawings unless specifically indicated to be otherwise. Unless otherwise indicated, the horizontal tolerance for the locations of structures and embedded hardware shall be +/- 1/16 of an inch and the vertical tolerance for the elevations of surfaces and embedded hardware shall be +/- 1/16 of an inch. Elevated conduits and structures (those extending above grade) shall be installed level and plumb. Unless otherwise indicated, maximum tolerance for vertical plumbness is 1/8” horizontal for every four feet vertical. Exposed raceways shall be installed parallel to or at right angles with the lines of the finished structure, unless otherwise indicated.
Tops of foundations, cans, pull boxes, manholes, vaults, etc., shall be uniform with the tops of concrete at the surrounding structures, natural grade or as indicated on the drawings or as directed by the Project Engineer. Unless otherwise indicated, top of foundations, cans, pull boxes, manholes, etc. shall be level with a maximum tolerance of 1/16” per foot.
01010 - PAGE 14
Road curves shall be as indicated on the drawings or as indicated by the Project Engineer. Edges of roads, walkways and graveled areas shall be clean, sharp, and well defined. Installed surface material shall not be allowed to spill outside the defined edges.
Installed foundations, structures, walkways, and roads not meeting the above requirements shall be removed, disposed of, and re-installed correctly at the contractor’s expense.
3.7 TEMPORARY FACILITIES
The contractor shall provide and pay for all temporary services and facilities as specified below and as necessary for the proper and expeditious execution of the work. The contractor shall make, or have made, all connections to existing services and sources of supply as necessary and/or indicated and pay all charges for same. All work under this Section shall comply with applicable laws, rules, regulations, codes, ordinances, and orders of all Federal, State, and Local authorities having jurisdiction for the safety of persons, materials and property. The contractor shall remove all such temporary installations and connections when no longer necessary for the project work.
3.7.1 Temporary Water
The contractor shall make arrangements to furnish a potable water supply for workers and project work, and pay for all water and services.
3.7.2 Temporary Toilets and Sanitation
The contractor shall provide ample and suitable on site sanitary conveniences with proper enclosures for the use by the workers, FAA personnel, and FAA support personnel. Such conveniences shall be kept clean, properly ventilated and installed and maintained in conformity with requirements of all laws and ordinances governing such installations. Locations shall be subject to the FAA Project Engineer's approval. After completion of the work such conveniences shall be removed from the site.
3.7.3 Temporary Trash Dumpsters
The contractor shall provide ample and suitable on site trash dumpsters capable of containing all of the contractor’s trash and debris.
3.8 AIRPORT SECURITY, BADGING, AND ACCESS
The contractor is solely responsible for determining, complying with, and paying all associated cost required to work on and have access to the construction site. This includes complying with all of the Airport’s security, badging, and insurance requirements. The time and cost required for this effort must be accounted for in the contractors initial bid price.
01010 - PAGE 15
The FAA may provide a letter indicating that the contractor has a need to work on the airport.
Otherwise, the contractor is completely responsible for meeting the terms required by the airport.
Only direct construction support personnel, vehicles and/or equipment will be allowed to the work site. The FAA will not provide escorts for the contractor, his subcontractors, or suppliers.
Any required contractor escorts, due to the Airport’s access restrictions to non-FAA personnel, shall be at the availability, discretion, and convenience of the FAA personnel authorized to escort. Availability and timeliness of any FAA escort personnel is NOT guaranteed.
The contractor shall use only the access gates and haul roads that are designated by the FAA Project Engineer. The contractor shall be required to keep access gates guarded and closed during construction hours. The gate may be opened only for authorized vehicle traffic flow. At such times as this gate is not guarded, it shall be closed and securely locked as approved by the Airport and the FAA.
3.9 SAFETY
All work shall be accomplished in accordance with OSHA Regulations (Standards – 29 CFR), Part 1926, Safety and Health Regulations for Construction.
Protective Equipment, including personal protective equipment for eyes, face, head, and protective clothing shall be used wherever it is necessary by reasons of hazards or environment [1926.95].
Head protective equipment (helmets) shall be worn in areas where there is a possible danger of head injuries from impact, flying or falling objects, or electrical shock and burns [1926.100].
Eye and face protection equipment shall be worn when machines or operations present potential eye or face injury [1926.102].
Specific work and operations requiring the mandatory use of personnel protective equipment shall be determined by the FAA Project Engineer.
3.10 SEDIMENTATION, EROSION, AND DUST CONTROL
The Contractor shall comply with all of the airport’s requirements for sedimentation, erosion, and dust control. This may include the use of silt fencing and/or hay bales to filter sediments from runoff and the application of water as needed to control dust.
3.11 ENVIRONMENTAL REQUIREMENTS
The Contractor shall be responsible for complying with all local, state, and federal environmental rules and regulations applicable to this project.
01010 - PAGE 16
3.12 DEBRIS CONTROL AND CLEAN-UP
The work site shall be kept clean and orderly during the progress of work. All debris, excess material, and trash shall be completely cleaned up at the end of every day – no exceptions.
Special attention shall be exercised to prevent the production of FOD (foreign object debris) which could cause damage to aircraft and/or airport equipment. Prior to the Contract Final Inspection, the contractor shall clean all areas of the construction site. This shall include but is not limited to the dress-up, sweep-up, and re-seeding of all areas disturbed during construction.
A NEAT FINAL APPEARANCE OF THE INSTALLED FACILITIES (INTERIOR AND
EXTERNAL) SHALL BE EMPHASIZED! All clean-up work shall be to the approval of the FAA Project Engineer.
Upon completion of work, the contractor shall be required to obtain a letter from the Airport Manager indicating that the work area has been left in an acceptable condition. A copy of the letter shall be given to the FAA Project Engineer.
3.13 INSPECTION & ACCEPTANCE
The Contractor shall maintain an adequate inspection system and perform such inspections to ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government.
THE PRESENCE OR ABSENCE OF A GOVERNMENT INSPECTOR DOES NOT RELIEVE
THE CONTRACTOR FROM ANY CONTRACT REQUIREMENT.
The Government inspections and tests are for the sole benefit of the Government and do not- Relieve the Contractor of responsibility for providing adequate quality control measures;
Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
Constitute or imply acceptance.
The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements. The Contractor shall promptly segregate and remove rejected material from the premises.
END OF SECTION
02100 - PAGE 1
SECTION 02100
SITE PREPARATION
TABLE OF CONTENTS
GENERAL
1.1 GENERAL
PRODUCTS
Not Used
EXECUTION
3.1 SITE BOUNDARIES
3.2 GRUBBING
3.3 DISPOSAL OF CLEARED MATERIALS
02100 - PAGE 2
SECTION 02100
SITE PREPARATION
PART 1 GENERAL
1.1 GENERAL
The contractor shall provide the labor, equipment and materials to clear and grub the site of all brush, trees, stumps, and other materials as specified herein.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 SITE BOUNDARIES
The Contractor will locate all structures and access roads by establishing line and grade in the vicinity of each structure. The contractor shall verify established control points, perform any additional surveys and maintain control points as required to ensure the accuracy of the work.
3.2 GRUBBING
Grubbing shall consist of the removal and disposal of stumps, roots larger than 1-1/2 inches in diameter, matted roots, and subsurface piping, where indicated, from the designated grubbing areas. This material, together with logs and other organic or metallic debris not suitable for foundation purposes shall be excavated and removed to a depth of not less than 18 inches below the final ground elevation in areas indicated to be grubbed and in areas indicated as construction areas for access roads or walkways. Depressions made by grubbing shall be filled with suitable material and compacted such that the finished surface shall match the adjacent surface in composition, degree of compaction, and elevation.
3.3 DISPOSAL OF CLEARED MATERIALS
All brush, and other refuse from the clearing operations shall be removed from site and disposed of at the contractor's expense and at no extra cost to the Government. Disposal of material shall not be permitted on airport property.
02200 - PAGE 1
SECTION 02200
EARTHWORK
TABLE OF CONTENTS
GENERAL
1.1 GENERAL
1.2 REFERENCES
1.2.1 American Association of State Highway and Transportation Officials (AASHTO)
1.2.2 American Society for Testing and Materials (ASTM) Standard
PRODUCTS
Not Used
EXECUTION
3.1 EXCAVATION
3.1.1 Classification
3.1.2 Drainage
3.1.3 Freezing
3.1.4 Excavation for Slabs and Footings
3.1.4.1 Limits
3.1.5 Trench Excavation
3.1.6 Excavation for Walkways and Access Roads
3.1.7 Excavation of Ditches, Swales and Culverts
3.1.8 Safety and Protection of Work
3.1.9 Utilization of Excavated Materials
3.1.10 Inspection of Excavated Area
3.2 FILL AND BACKFILL
3.2.1 Weather Conditions
3.2.2 Satisfactory Material
3.2.3 Preparation of Surface for Fill and Embankment
3.2.4 Source of Fill Material
3.2.5 Fill for Slabs and Foundations
3.2.6 Backfilling of Conduit Trenches
3.2.7 Fill and Embankment for Access Roads, Walkways, and Culverts
3.2.8 Fill for Open Areas
3.2.9 Placing of Crushed Rock and Topsoil
3.2.10 Compaction Methods
3.2.11 Determination of Density
02200 - PAGE 2
SECTION 02200
EARTHWORK
PART 1 GENERAL
1.1 GENERAL
The contractor shall perform and complete all work as necessary for excavation, filling, backfilling, and grading required on the applicable drawings and specified herein.
1.2 REFERENCES
The latest edition in effect of the following publications form a part of this specification and are applicable to the extent specified herein.
1.2.1 American Association of State Highway and Transportation Officials (AASHTO)
AASHTO-T99Moisture-Density Relations of Soils AASHTO-T19l Field Determination of Density of Soil in Place, Sand Cone Method AASHTO-T204 Field Determination of Density of Soil in Place, Dry Cylinder Method AASHTO-T205 Field Determination of Density of Soil in Place, Rubber Balloon Method AASHTO-T233 Field Determination of Density of Soil in Place, Block, Chunk or Core
1.2.2 American Society for Testing and Materials (ASTM) Standard
ASTM D-424 Test for Plastic Limit and Plastic Index of Soils
02200 - PAGE 3
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 EXCAVATION
3.1.1 Classification
The condition of the material to be excavated, bored, drilled, etc., must be determined by the construction contractor. Excavation may require ripping, blasting, cutting, or other means beyond the use of a normal back hoe or drilling equipment.
3.1.2 Drainage
Excavation shall be performed so that the area of the site and the area immediately surrounding the site and affecting operations at the site will be continually and effectively drained. Water shall not be permitted to accumulate in the excavation. The excavation shall be drained by pumping or other satisfactory methods to prevent softening of the foundation bottom, undercutting of footings, or other actions detrimental to proper construction procedures.
3.1.3 Freezing
When freezing weather is expected, excavations shall not be made to the full depth, unless the footing concrete can be placed immediately. If excavation is already at full depth, the excavation shall be protected from frost.
3.1.4 Excavation for Slabs and Footings
The excavations shall conform to the dimensions and elevations of the drawings applicable to footings and other foundation structures which are cast in place.
3.1.4.1 Limits
Excavations below indicated depths shall not be permitted except to remove material consisting of shale, sod, clods, stones larger than 4 inches, organic debris, trash or frozen material. Such unsatisfactory material shall be removed to a depth of 6 inches and replaced with satisfactory fill material. Unauthorized over excavation for footings shall be replaced at no additional cost to the Government to the indicated excavation grade with concrete. Excavation shall extend a sufficient distance from footings to allow for placing and removal of forms, installation of services, and for inspection, except where the concrete for walls and footings is authorized by the Resident Engineer to be deposited directly against excavated rock surfaces.
02200 - PAGE 4
3.1.5 Trench Excavation
Trenches for direct earth burial cables, conduits and other utilities shall conform to the dimensions and elevations shown on the applicable drawings. The banks need not be kept vertical but may be sloped or widened to such general limits as may be set by the Resident Engineer, provided there is no interference with other utilities. The trench bottom shall be a minimum of 6 inches wide or as required to provide separation between power and control cables or between power cables of different voltages. The trench depth shall be deep enough to allow cable placement plus an over excavation of at least three inches. The over excavation shall be filled with earth or sand containing no material aggregate particles that would be retained on a 1/4-inch sieve. The fill material shall be compacted to approximately the same density of the adjacent soil.
3.1.6 Excavation for Walkways and Access Roads
The excavation shall conform to the dimensions and elevations of the drawings applicable to areas designed for vehicular and pedestrian traffic. Subgrade areas for access roads and walkways shall be plowed, disked and moistened or aerated as required obtain proper compaction. Muck, peat and other unsatisfactory material shall be removed to a minimum depth of 12 inches below excavation grade or as required to provide a satisfactory foundation. Low areas resulting from removal of such material shall be brought up to required grade with satisfactory fill material.
3.1.7 Excavation of Ditches, Swales and Culverts
Ditches, swales and culverts shall be cut accurately to the cross sections and grades indicated.
The sides and bottom of ditches and swales shall conform to the slope, grade, and shape of the section indicated. Care shall be taken not to excavate ditches and swales below the grades indicated. Excessive excavation shall be backfilled to the indicated excavation depth with approved material and compacted to 90 percent maximum density. All ditches, swales, and culverts excavated under this section shall be maintained until final acceptance of the work.
3.1.8 Safety and Protection of Work
Sheeting and shoring shall be done as may be necessary for the protection of the work and for the safety of personnel. The manner of bracing excavations shall comply with local regulations and OSHA construction regulations. Grading shall be performed in a manner to ensure proper drainage at all times.
3.1.9 Utilization of Excavated Materials
Satisfactory excavated material shall be used in the work insofar as practicable. No excavated material shall be disposed of in such a manner as to obstruct the flow of any stream, endanger a partly finished structure, impair the efficiency or appearance of any structure, or be detrimental to the completed work in any way.
02200 - PAGE 5
3.1.10 Inspection of Excavated Area
When excavations have reached the required elevations, the contractor shall not proceed with further construction of the excavated area until the area has been inspected by the Resident Engineer.
3.2 FILL AND BACKFILL
3.2.1 Weather Conditions
No fill or backfill operations shall be performed when weather conditions are determined by the Resident Engineer to be too wet or cold to permit such operations.
3.2.2 Satisfactory Material
Material suitable for fill, backfill and embankment purposes shall be reasonably free of shale, sod, clods, and stones larger than 4 inches, organic debris, trash and frozen material. Only materials suitable for obtaining the degree of compaction specified herein shall be used.
3.2.3 Preparation of Surface for Fill and Embankment
All surfaces designated to receive fill and embankment material shall be inspected prior to material placement. Soil surfaces on which compacted fill is to be placed shall be plowed, disked or otherwise broken up to a depth of 6 inches, pulverized, moistened or aerated as necessary, mixed and compacted to the same density as required for the fill or embankment material. Sloped ground surfaces steeper than one vertical to four horizontal on which fill is to be placed shall be stepped or benched, as directed, in such manner that the fill material will bond with the existing surface. The finished surface shall be reasonable smooth, compacted and free from irregular surface changes. The degree of finish shall be that ordinarily obtained from blade-grader operations or, where more suitable, hand raking.
3.2.4 Source of Fill Material
Fill material shall be selected for the particular fill area for which it is to be used. Fill material shall not be confused with surfacing aggregate. Necessary clearing, grubbing, and disposal of debris, shall be considered incidental operations to the borrow excavation and shall be performed by the contractor. All material stockpiled on site shall either be used as fill material or disposed of by the contractor.
3.2.5 Fill for Slabs and Foundations
Satisfactory material shall be placed in horizontal layers of 6 inches (loose measurement) and compacted to 95 percent maximum density. Unless directed by the Resident Engineer, no backfill shall be placed against footings prior to 7 days after footings and slabs are poured.
02200 - PAGE 6
3.2.6 Backfilling of Conduit Trenches
Trenches shall be backfilled as indicated on the drawings.
The disturbed area shall be cleaned, raked, and seeded. All trench backfilling shall be to the approval of the Airport Manager and the Project Engineer. THE CONTRACTOR SHALL
GUARANTEE THAT NO SETTLEMENT OCCURS WHICH LEAVES A DEPRESSION
BELOW THE SURROUNDING GRADE FOR A PERIOD OF ONE YEAR AFTER PROJECT
COMPLETION.
3.2.7 Fill and Embankment for Access Roads, Walkways, and Culverts
Fills and embankments shall be constructed at the locations and to lines and grades indicated on the drawings. The material shall be placed in successive horizontal layers of 8 inches, loose measure, for the full width of the cross section. Fills and embankments shall be compacted to 95 percent of maximum density. Final elevations after compaction shall not vary more than 0.05 feet from the established grade and approved cross section.
3.2.8 Fill for Open Areas
All open areas to receive seed or sod shall be filled to within 6 inches of final grade with satisfactory material. Fill beneath this layer shall consist of material free of rocks larger than 6 inches and shall be placed in layers not greater than 8 inches, loose measure. All layers shall be compacted to 90 percent maximum density.
3.2.9 Placing of Crushed Rock and Topsoil
On areas to receive crushed rock or topsoil material, the compacted fill or subgrade shall be scarified to a depth of 2 inches. Material to be placed shall then be evenly spread, graded and compacted to 90 percent of maximum density. Material required to be placed within two feet of footings or slabs shall be compacted by approved hand tampers. Compaction of topsoil to be grassed or sodded may be deferred until after seeding or sodding operations.
3.2.10 Compaction Methods
Compaction shall be performed using the method and equipment suitable for the area as specified. Mechanical hand tampers shall be used only in areas adjacent to footings and slabs or in trenches or other areas where use of rollers is not practical. Compaction with pneumatic-tired rollers, three wheel power rollers, sheepsfoot rollers, etc., shall be used in all other areas as required to provide the specified compaction density.
02200 - PAGE 7
3.2.11 Determination of Density
Maximum density tests will be performed in accordance with AASHTO-T99 and field density tests will be performed in accordance with AASHTO-T191, T204, T205, or T233.
02505 - PAGE 1
SECTION 02505
GRANULAR PAVING
(ACCESS ROADS, PARKING AREAS, AND WALKWAYS)
TABLE OF CONTENTS
GENERAL
1.1 GENERAL
PRODUCTS
2.1 MATERIALS
2.2 AGGREGATE MATERIAL (non rotomill)
2.3 ROTOMILL MATERIAL
2.4 ROAD STABILIZATION/WEED CONTROL FABRIC
2.5 SOIL STERILANT
2.6 CULVERTS AND END SECTIONS
EXECUTION
3.1 PREPARATION OF GROUND SURFACE
3.2 SURFACING
3.3 PLACEMENT OF ROAD STABILIZING/WEED CONTROL FABRIC
3.4 AGGREGATE PLACING
3.5 COMPACTION AND GRADING
3.6 PLACEMENT OF SOIL STERILANT
3.7 QUALITY ASSURANCE
3.7.1 Testing
3.7.2 Certification
02505 - PAGE 2
SECTION 02505
GRANULAR PAVING
(ACCESS ROADS, PARKING AREAS, AND WALKWAYS)
PART 1 GENERAL
1.1 GENERAL
The contractor shall provide the necessary materials, labor and equipment for the construction of access roads and walkways as specified herein or on applicable drawings.
PART 2 PRODUCTS
2.1 MATERIALS
The contractor shall furnish materials for access roads and walkways, and for patching the road(s) and runway/taxiway areas that meet or exceed the requirements specified herein and as shown on the drawings.
2.2 AGGREGATE MATERIAL (non rotomill)
Unless otherwise indicated, areas designated to be crushed rock shall have a maximum aggregate size of 3/4 inch. Other gradation limits are as follows:
% PASSING BY WEIGHT
SIEVE # CLASS 1 CLASS 5 CLASS 6
2 1/2" 100 ---- ---- 2" 95-100 ---- ----
1 1/2" ---- 100 ---- 1" ---- 95-100 ----
3/4" ---- ---- 100 #4 30-65 30-70 30-65 #8 ---- ---- 25-55
#200 3-15 3-15 3-12
The material shall be clean and well graded, and compacted flat and smooth, as approved. All aggregate material shall be approved by the FAA Project Engineer before placement.
02505 - PAGE 3
2.3 ROTOMILL MATERIAL
Rotomill material shall consist of clean well graded asphalt millings, and have a maximum aggregate size of 3/4 inch. Rotomill material shall be free of all fabric, concrete, and any other foreign debris and shall be compacted flat and smooth, as approved. All aggregate material shall be approved by the FAA Project Engineer before placement.
2.4 ROAD STABILIZATION/WEED CONTROL FABRIC
Use stabilization fabric, such as Mirafi 600X. The fabric shall be free of any chemical treatment or coating which reduces permeability, and shall be inert to chemicals commonly found in soil. The fabric shall conform to the physical property requirements listed in the following table. All values shall represent certifiable minimum values in the weakest principle direction of the fabric.
Property Minimum Requirement
Weight 6.0 oz/sq.yd (ASTM D-3776-79) Grab Strength 300 lbs (ASTM D-1682-64) Grab Elongation 35% (max) (ASTM D-1682-64) Trapezoid Tear Strength 120 lbs (ASTM D-1117-80) Mullen Burst Strength 600 psi (ASTM D-3786-80) Punture Strength 130 lbs (ASTM D-3787-80) Thickness 30 mils (ASTM D-1777-64) Water Flow Rate 50 gal/min/sf (CFMC GET-2)
Fabric width shall be 12.5 feet. Fabric in other areas shall be cut to fit, and overlapped to fully cover such areas.
2.5 SOIL STERILANT
Use water-soluble liquid herbicide such as Hyvar X-L by Dupont. Active ingredient: Lithium salt of bromacil - 21.9%.
2.6 CULVERTS AND END SECTIONS
Unless otherwise indicated, culverts and end sections shall be constructed with galvanized steel corrugated pipe and shall be in accordance with ASTM A 444, specification for steel sheet, zinc coated (galvanized) by the hot Dip Process for culverts and underdrains, and ASTM A796 practice for structural design of corrugated steel pipe, pipe arches, and arches for storm and sanitary sewers. Size and gauge of material shall be as indicated on the construction drawings or as approved.
02505 - PAGE 4
PART 3 EXECUTION
3.1 PREPARATION OF GROUND SURFACE
Areas designated for access roads, walkways, and graveled areas shall be scarified to a depth of 4" (unless otherwise specified) and compacted to 90 percent of maximum density in accordance with AASHTO-T99.
3.2 SURFACING
Surfacing shall only be done when the ground surface is dry and unfrozen. Placement shall be made to the line and grade shown on the applicable drawings and as staked by the contractor.
Compaction shall be performed with…