DRAWINGS VA EAST ORANGE (100_ SET) PART 1 OF 2.pdf
PDF 13 MB Posted
- Attached to
- Y1DA--561-19-120 Roofing Project Federal contract opportunity
- Solicitation number
- 36C24221B0019
About this file
This document provides details on a federal solicitation for roofing project services. Solicitation number 36C24221B0019 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 is seeking bids for roofing project 561-19-120. The solicitation involves roofing services and the response due date is not provided. The Department of Veterans Affairs is the contracting agency. No other details on pricing, terms, or award date are included in this document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Responses to RFI Submission for 36C24221B0019 Replace Roofs.pdf | ||
| 561-19-120 Roofing walk thru walk sign in sheet.pdf | ||
| RFI 36C24221B0019 0001.pdf | ||
| 36C24221B0019 0001.docx | DOCX document | |
| 36C24221B0019_1.docx | DOCX document | |
| DRAWINGS VA EAST ORANGE (100_ SET) PART 2 OF 2.pdf | ||
| 100_ Project Specifications Construction Documents.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEERING LLPFE PROJECT NO: 19-115
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
100% C.D. SUBMISSION
ASBESTOS ABATEMENT CONSULTANT:
Egan Environmental Consulting, Inc. Liscum
181 CHURCH STREET
POUGHKEEPSIE, NEW YORK 12601
PHONE 845-452-2268 FAX 845-452-3752
ARCHITECTURE
PLANNING INTERIORS
McCormack VanVoorhis LLP
Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
100% C.D. SUBMISSION
ASBESTOS ABATEMENT CONSULTANT:
Egan Environmental Consulting, Inc. Liscum
181 CHURCH STREET
POUGHKEEPSIE, NEW YORK 12601
PHONE 845-452-2268 FAX 845-452-3752
ARCHITECTURE
PLANNING INTERIORS
McCormack VanVoorhis LLP
SITE SAFETY & PROPOSED STAGING PLAN
SAFETY NOTES:
LEGEND:
GENERAL NOTES:
Description of Required Infection Control Precautions by Class
During Construction Project Upon Completion of
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transportation in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
C l a s s
I V
C l a s s
I I I
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department, and thoroughly cleaned by the owner’s Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with disinfectant.
5. Remove isolation of HVAC system in areas where work is being performed.
NOTES:
PATIENT RISK GROUP FOR "TYPE D" CONSTRUCTION
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
Class IV
Class III / IV
Class IV
Class IV
DURATION DESCRIPTION
Weeks 1-3 Submittals & Mobilization
Weeks 4-7 PHASE 1: (Building 1 - Wing A - Roof 26)
Weeks 8-11 PHASE 2: (Building 1 - Wing B - Roof 32)
Weeks 12-15 PHASE 3: (Building 1 - Wing C - Roof 30)
Weeks 16-19 PHASE 4: (Building 1 - Wing D - Roof 28)
Weeks 20-23 PHASE 5: (Building 5 Roof)
Week 24-27 PHASE 6: (Building 5A Roof)
Week 28-31 PHASE 7: (Building 7 Roof)
Week 32-35 PHASE 8: (Building 1 - Auditorium - Roof 74)
Weeks 36-39 PHASE 9: (Building 11th Floor - Roofs 18, 19, 22 & 23)
Weeks 40-43 PHASE 10: (Building 15 Roof)
Weeks 44-47 PHASE 11: (Building 16 Roof)
Weeks 48-51 PHASE 12: (Building 17 Roof)
Weeks 52-55 PHASE 13: (Building 18 Roof)
Weeks 56-59 PHASE 14: (Building 15A & 16A & Connecting Corridor Roofs)
Week 60-62 Project Closeout:
Including: Closeout Documents, demobilization, etc.
Project Duration: 310 Days
Notes:
1. Certain activities may be combined for expediency.
2. All phasing and work is subject to the owner occupancy schedule.
3. All work needs to be coordinated with the COR in advance.
4. There will be no re-mobilization cost permitted. All work must be completed in allotted time frame.
5. Refer to spec section 01 32 16.15 for more information on Project Scheduling
Requirements.
10' TEMPORARY CONSTRUCTION FENCING DETAIL
WITH DOUBLE MAN GATE DETAIL
TEMPORARY CONSTRUCTION PARTITION
KEY PLAN
PHASE 6
PHASE 5
PHASE 7
PHASE 10
PHASE 11
PHASE 12
PH
AS
E 1
PHASE 14
PHASE 14
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 8
PHASE 9
ENGINEERING LLPFE PROJECT NO: 19-115
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
100% C.D. SUBMISSION
ASBESTOS ABATEMENT CONSULTANT:
Egan Environmental Consulting, Inc. Liscum
181 CHURCH STREET
POUGHKEEPSIE, NEW YORK 12601
PHONE 845-452-2268 FAX 845-452-3752
ARCHITECTURE
PLANNING INTERIORS
McCormack VanVoorhis LLP
GENERAL PROJECT PHASING NOTES:
GENERAL NOTES:
CONSTRUCTION PHASING PLAN
62 WEEKS TOTAL
SCAFFOLD PLANKS:
ERECTION, ALTERATION AND DISMANTLING:
SUPERVISION:
CERTIFICATES OF COMPETENCY:
SCAFFOLDING REGISTER AND INSPECTION OF SCAFFOLDS:
PROTECTION AND MAINTENANCE:
DUTIES OF PRINCIPALS, CONTRACTORS, SCAFFOLDING
ERECTORS AND USERS OF SCAFFOLDS:
SCAFFOLDING OVER VERANDAHS, GANTRIES OR ROOFS:
LIFTING APPLIANCES MOUNTED ON SCAFFOLDING:
SUSPENDED SCAFFOLDS:
TYPES OF SUSPENDED SCAFFOLDS:
MECHANICAL OPERATION:
ANCHORAGES:
BRACKETS AND PARAPET HOOKS:
WORKING PLATFORMS, GUARDRAILS, MIDRAILS AND TOEBOARDS:
SAFETY HARNESSES AND LIFELINES:
ANTI-TILT SWITCH DEVICES:
ACCESS, WARNING NOTICES AND PROTECTION OF THE PUBLIC:
ENGINEER’S CERTIFICATE:
SCAFFOLD REGISTER:
INSPECTION RECORD:
COUNTERWEIGHTING OF OUTRIGGERS:
FOUNDATIONS:
SUSPENDED SCAFFOLDS:
SIDEWALK SHEDS:
REQUIRED TRAINING:
GENERAL NOTE:
ENGINEERING LLPFE PROJECT NO: 19-115
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
100% C.D. SUBMISSION
ASBESTOS ABATEMENT CONSULTANT:
Egan Environmental Consulting, Inc. Liscum
181 CHURCH STREET
POUGHKEEPSIE, NEW YORK 12601
PHONE 845-452-2268 FAX 845-452-3752
ARCHITECTURE
PLANNING INTERIORS
Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
100% C.D. SUBMISSION
ASBESTOS ABATEMENT CONSULTANT:
Egan Environmental Consulting, Inc. Liscum
181 CHURCH STREET
POUGHKEEPSIE, NEW YORK 12601
PHONE 845-452-2268 FAX 845-452-3752
ARCHITECTURE
PLANNING INTERIORS
KEY PLAN
BUILDING 1 - WING A - 5th FLOOR ROOF (ROOF 26)
BUILDING 1 - WING B - 5th FLOOR ROOF (ROOF 32)
ROOF REPLACEMENT ROOF 26 & 32
SAFETY NOTES:
KEYED NOTES:
Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
100% C.D. SUBMISSION
ASBESTOS ABATEMENT CONSULTANT:
Egan Environmental Consulting, Inc. Liscum
181 CHURCH STREET
POUGHKEEPSIE, NEW YORK 12601
PHONE 845-452-2268 FAX 845-452-3752
ARCHITECTURE
PLANNING INTERIORS
BUILDING 1 - WING D - 5th FLOOR ROOF (ROOF 28)
BUILDING 1 - WING C - 5th FLOOR ROOF (ROOF 30)
ROOF REPLACEMENT ROOF 28 & 30
Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
100% C.D. SUBMISSION
ASBESTOS ABATEMENT CONSULTANT:
Egan Environmental Consulting, Inc. Liscum
181 CHURCH STREET
POUGHKEEPSIE, NEW YORK 12601
PHONE 845-452-2268 FAX 845-452-3752
ARCHITECTURE
PLANNING INTERIORS
GENERAL NOTES:ROOF REPLACEMENT ROOF 74
BUILDING 1 - 3rd FLOOR ROOF (ROOF 74)
BUILDING 1 - WING A - 11th FL. ROOF (22 & 23)
BUILDING 1 - WING B - 11th FL. ROOF (18 & 19)
ROOF REPLACEMENT 11TH FLOOR AREAS
Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
100% C.D. SUBMISSION
ASBESTOS ABATEMENT CONSULTANT:
Egan Environmental Consulting, Inc. Liscum
181 CHURCH STREET
POUGHKEEPSIE, NEW YORK 12601
PHONE 845-452-2268 FAX 845-452-3752
ARCHITECTURE
PLANNING INTERIORS
McCormack VanVoorhis LLP
BUILDING 5 & 5A ROOF PLAN
ROOF REPLACEMENT BLDG 5 (INCLUDING SHAFT AREAWAY)
ROOF REPLACEMENT BLDG 5A (INTER-CONNECTED MODULAR BLDGS)
| Sheets and Views |
| (1) GI-001-TS |
| (2) GI-002-GI-002 |
| (3) GI-003-GI-003 |
| (4) GI-004 SCAFFOLDING DETAILS-GI-004 |
| (8) 1-AS-101, (9) 1-AS-102 & (10) 1-AS-103-1-AS-101 |
| (8) 1-AS-101, (9) 1-AS-102 & (10) 1-AS-103-1-AS-102 |
| (8) 1-AS-101, (9) 1-AS-102 & (10) 1-AS-103-1-AS-103 |
| (11) 5-AS-101-5-AS-101 |
| (12) 7-AS-101-7-AS-101 |
| (13) 15-AS-101-15-AS-101 |
| (14) 16-AS-101-16-AS-101 |
| (15) 15A-16A-AS-101-15A-16A-AS-101 |
| (16) 17-AS-101-17-AS-101 |
| (17) 18-AS-101-18-AS-101 |
| (18) AS-700-AS-700 |
| (19) AS-701-AS-701 |
| (20) AS-702-AS-702 |
| (21) AS-703-AS-703 |
| (22) AS-704-AS-704 |
File details come from the government source that posted it. Updated .