Drawings Caprock Coulee Parking Area.pdf
PDF 9 MB Posted
- Attached to
- Rehab Caprock Coulee Parking Area Federal contract opportunity
- Solicitation number
- 140P6321B0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| THRO Caprock Parking Rehab Site Visit Sign-In Sheet_0001.pdf | ||
| Sol_140P6321B0001_Amd_0001.pdf | ||
| 52.222-99 Combating Race and Sex Stereotyping Deviation_0001.pdf | ||
| Construction Wage Determination.docx | DOCX document | |
| SOW_Caprock Coulee Parking Specifications_11.9.20.pdf | ||
| Sol_140P6321B0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION DRAWINGS
RECOMMENDED:
APPROVED:
DATE
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF DRAWING DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
REVISIONS
PARKING LOT REHABILITATION THRO2020-04
25OF
LOCATION WITHIN PARK
NAME OF PARK
REGION
REGION 5 - MISSOURI BASIN
COUNTY
MCKENZIE
STATE
NORTH DAKOTA
CAPROCK COULEE TRAILHEADUNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
THEODORE ROOSEVELT NATIONAL PARK
MARK SHEET DATE INITIALS
PROJECT MANAGER
SUPERINTENDENT DATE
SOUTHWESTERN NORTH DAKOTA
INDEX TO SHEETS
TITLE OF SHEETSUB SHEETSHEET NUMBER
1 N/A COVER SHEET
2 G1 GENERAL NOTES
3 G2 GENERAL REMOVAL NOTES
4 G3 GENERAL SITE REHABILITATION NOTES
5 C1 CAPROCK COULEE PARKING AREA EXISTING SITE PLAN
6 C2 CAPROCK COULEE PARKING AREA EROSION CONTROL PLAN
7 C3 CAPROCK COULEE PARKING AREA REMOVAL PLAN
8 C4 CAPROCK COULEE PARKING AREA PROPOSED SITE PLAN
9 C5 CAPROCK COULEE PARKING AREA LAYOUT
10 - 12 C6 - C8 CAPROCK COULEE PROPOSED PARKING AREA DETAILS
13 V1 CAPROCK COULEE PARKING AREA SURVEY CONTROL DATA
14 V2 CAPROCK COULEE PARKING AREA LAYOUT COORDINATE DATA
15 204 STANDARD SPECIFICATION SUBGRADE PREPARATION
16 302 STANDARD SPECIFICATION AGGREGATE BASE/SURFACE COURSE
17 - 18 401 STANDARD SPECIFICATION ASPHALTIC CONCRETE PAVEMENT
19 402 STANDARD SPECIFICATION BITUMINOUS PRIME/TACK COATS
20 - 24 501 STANDARD SPECIFICATION PORTLAND CONCRETE PAVEMENT
25 601 STANDARD SPECIFICATION CONCRETE SIDEWALKS/WALKWAYS
THEODORE ROOSEVELT NATIONAL PARK
(NORTH UNIT)
0 25 50 75 100 MilesPROJECT AREA
CAPROCK COULEE
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
AUG. 10TH, 2020
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
G1
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
GENERAL NOTES
THRO2020-04
25OF
GENERAL NOTES
1. CONTRACTOR RECEIVING AWARD SHALL FIELD VERIFY ALL CONDITIONS AND MEASUREMENTS PRIOR TO COMMENCING WORK.
2. ALL QUANTITIES NOTED WITHIN THIS PLAN SET ARE APPROXIMATE, AND PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL QUANTITIES PRIOR TO SUBMITTING A BID OR COMMENCING CONSTRUCTION.
3. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION LAYOUT AND STAKING REQUIRED TO COMPLETE THE CONTRACTED WORK.
4. NO GROUND DISTURBANCE CONSTRUCTION ACTIVITIES ARE PERMITTED OUTSIDE THE DEFINED CONSTRUCTION LIMITS DELINEATED ON
PLAN SET.
5. THE CONTRACTOR IS RESPONSIBLE FOR HARDENING ANY EXISTING PAVEMENT AND CONCRETE SURFACES TO PROTECT AGAINST DAMAGE OCCURRING DUE TO ACCESS TO THE PROJECT WORK AREA, MATERIAL STORAGE, OR CONSTRUCTION ACTIVITIES.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING NATIONAL PARK SERVICE INFRASTRUCTURE DUE TO PROJECT ACCESS, MATERIAL STORAGE, OR CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL COORDINATE ALL REPAIRS WITH THE PROJECT
C.O.R., AND REPAIR ALL DAMAGE PRIOR TO THE COMPLETION OF THE CONTRACTED WORK.
7. THE PROJECT C.O.R. SHALL APPROVE THE FINAL HORIZONTAL, VERTICAL PROFILE, SUBGRADE PREPARATION, AND FORM-WORK PRIOR TO
THE LAYING OF CONCRETE OR ASPHALT PAVEMENT.
8. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS, TRASH, AND MATERIALS FROM PARK PROPERTY RELATED TO THE CONSTRUCTION PROJECT. THE USE OF PARK TRASH CONTAINERS IS NOT PERMISSIBLE. THE CLEANING OF EQUIPMENT WILL BE
CONDUCTED OFF PARK PROPERTY DUE TO ENVIRONMENTAL CONCERNS.
9. ALL SECURITY AND PROTECTION OF THE CONTRACTOR'S EQUIPMENT AND MATERIALS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
THE GOVERNMENT WILL NOT BE LIABLE FOR DAMAGE OR THEFT OF CONTRACTOR'S TOOLS OR EQUIPMENT IF STAGED ON THE GROUNDS
OF THE NATIONAL PARK.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PUBLIC SAFETY WHEN CONDUCTING WORK ADJACENT TO PUBLICLY ACCESSED AREAS.
PROTECTION MAY INCLUDE BUT ARE NOT LIMITED TO BARRICADES, CONSTRUCTION FENCING, SIGNAGE OR A DEDICATED INDIVIDUAL TO
MONITOR AND DIRECT WHEN THE PUBLIC IS PRESENT ADJACENT TO ACTIVE WORK AREAS.
11. LOCATION OF TEMPORARY SERVICES ALLOWED WITHIN THE IMMEDIATE PROJECT AREA, DUMPSTER OR SATELLITE TOILET, WILL BE IDENTIFIED BY THE PROJECT C.O.R. DURING THE PRE-CONSTRUCTION MEETING. MAINTAINING TEMPORARY SERVICES SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
12. IT IS EXPECTED, ONCE THE CONTRACTOR COMMENCES WITH DISTURBANCE ACTIVITIES AT THE PROJECT AREA; THAT CONSTRUCTION ACTIVITY PERSISTS THROUGH COMPLETION. ANY PROJECT AREA WHICH REMAINS IDLE FOR A PERIOD GREATER THAN 10 CALENDAR DAYS, SHALL HAVE EQUIPMENT AND STOCKPILED MATERIALS REMOVED FROM THE PROJECT AREA. COORDINATION WITH THE PROJECT C.O.R.
SHALL BE UTILIZED TO COMMUNICATE DELAYS ASSOCIATED WITH POOR WEATHER CONDITIONS.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING THE LANDSCAPE ADJACENT TO THE PROJECT AREA FROM SEDIMENT
DISCHARGE DUE TO CONSTRUCTION ACTIVITIES.
14. THE CONTRACTOR SHALL EMPLOY SEDIMENT DISCHARGE PROTECTION DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR SHALL BE ALLOWED TO INCORPORATE MITIGATION MEASURES WHICH CAN BE EFFICIENTLY MOVED AS WORK PROGRESSES THROUGH THE SITE, PROVIDED SUITABLE PROTECTION IS ESTABLISHED WHERE MEASURES ARE REMOVED.
15. THE CONTRACTOR SHALL SWEEP ALL NEWLY CONSTRUCTED CONCRETE AND ASPHALT PAVEMENT NO MORE THAN 24-HOURS BEFORE A
SCHEDULED FINAL PROJECT INSPECTION.
TECH REVIEW:
DATE:
AUG. 10TH, 2020
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
G2
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
GENERAL REMOVAL NOTES
THRO2020-04
25OF
GENERAL REMOVAL NOTES
1. NO GROUND DISTURBANCE CONSTRUCTION ACTIVITIES ARE PERMITTED OUTSIDE THE DEFINED CONSTRUCTION LIMITS DELINEATED ON
PLAN SET.
2. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS, TRASH, AND MATERIALS FROM PARK PROPERTY RELATED TO THE CONSTRUCTION PROJECT. THE USE OF PARK TRASH CONTAINERS IS NOT PERMISSIBLE. THE CLEANING OF EQUIPMENT WILL BE
CONDUCTED OFF PARK PROPERTY DUE TO ENVIRONMENTAL CONCERNS.
3. REMOVE EXISTING SLABS, PAVING, CURBS, GUTTERS, AND WALKS AS INDICATED IN PLAN SET.
3.1. UNLESS EXISTING FULL-DEPTH JOINTS COINCIDE WITH THE LINE OF DEMOLITION, NEATLY SAW-CUT ALONG LINE OF EXISTING PAVEMENT TO REMAIN BEFORE REMOVING ADJACENT PAVEMENT. SAW CUT ALL FACES VERTICALLY.
3.2. PAINT CUT ENDS OF ANY STEEL REINFORCEMENT IN CONCRETE TO REMAIN WITH TWO COATS OF ANTIRUST COATING, FOLLOWING COATING MANUFACTURER'S WRITTEN INSTRUCTIONS. KEEP PAINT OFF SURFACES THAT WILL REMAIN EXPOSED.
4. IT IS ANTICIPATED WHEN REMOVING THE EXISTING ASPHALT PARKING AREA SURFACE, LITTLE TO NO AGGREGATE BASE WILL BE ENCOUNTERED BY THE CONTRACTOR. CLAY SOILS ARE EXPECTED TO BR ENCOUNTERED UNDER THE EXISTING ASPHALT PARKING AREA. THE CONTRACTOR SHALL REMOVE CLAY SOILS TO PROVIDE SPACE FOR ELEVEN (11) INCHES OF COMPACTED CLASS 5 AGGREGATE BASE AND FOUR (4) INCHES OF ASPHALT PAVEMENT. WASTE SOILS WILL BE HAULED TO A NATIONAL PARK SERVICE STORAGE SITE WITHIN THE NORTH UNIT AND STOCKPILED APPROXIMATELY 4.6 MILES DISTANT FROM PROJECT LOCATION. COORDINATE WITH THE PROJECT C.O.R. TO
IDENTIFY THE SPECIFIC LOCATION OF WASTE SOIL STOCK PILES.
5. EXISTING ASPHALT SURFACE CAN BE CRUSHED AND INCORPORATED INTO THE BASE OF THE NEW PARKING AREA. IF THE CONTRACTOR PREFERS TO RECYCLE ASPHALT MATERIAL ON SITE, COORDINATE THE ACTIVITIES WITH THE PROJECT C.O.R.
6. REMOVE SOD AND GRASS BEFORE STRIPPING TOPSOIL. CONTRACTOR TO IDENTIFY AND DETERMINE DEPTH OF EXISTING TOPSOIL. STRIP TOPSOIL IN A MANNER TO PREVENT INTERMINGLING WITH UNDERLYING SUBSOIL OR OTHER WASTE MATERIALS.
6.1. STOCKPILE LOCATIONS AT PROJECT AREAS WILL BE IDENTIFIED BY THE PROJECT C.O.R. DURING THE PRE-CONSTRUCTION MEETING.
6.1. STOCKPILE TOPSOIL INTERMIXING WITH SUBSOIL OR OTHER MATERIALS. GRADE AND SHAPE STOCKPILES TO DRAIN SURFACE WATER.
COVER STOCKPILE TO PREVENT WINDBLOWN DUST AND EROSION BY WATER.
6.2. DISPOSE OF SURPLUS TOPSOIL SHALL BE COORDINATED WITH THE PROJECT C.O.R.
7. REMOVE SURPLUS SOIL MATERIAL, DEMOLISHED MATERIALS, AND WASTE MATERIALS INCLUDING TRASH AND DEBRIS, AND DISPOSE OF THEM OFF GOVERNMENT PROPERTY, ADHERING TO ALL LOCAL, STATE, AND FEDERAL REGULATIONS.
7.1. THE USE OF PARK TRASH CONTAINERS IS NOT PERMISSIBLE.
7.2. THE CLEANING OF EQUIPMENT WILL BE CONDUCTED OFF PARK PROPERTY DUE TO ENVIRONMENTAL CONCERNS.
DATE:
AUG. 10TH, 2020
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
G3
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
GENERAL SITE
REHABILITATION NOTES
THRO2020-04
25OF
GENERAL SITE REHABILITATION NOTES
1. THE CONTRACTOR SHALL BACKFILL AGAINST THE SIDES OF THE PARKING AREA, ACCESS PADS, AND WALKWAY PADS TO THE TOP OF THE
FINISHED ASPHALT OR CONCRETE SURFACE, AND SLOPE FILL AWAY FROM THE WALKWAY AT A GRADE NO STEEPER THAN 4' HORIZONTAL
TO 1' VERTICAL (4:1 MAX).
2. ALL AREAS OF DISTURBED SOIL SHALL BE REHABILITATED BY GRADING TOPSOIL AND APPLYING VEGETATION SEED.
3. IMMEDIATELY PRIOR TO PLACING TOPSOIL, THE SUBGRADE SHALL BE LOOSENED BY DISKING OR SCARIFYING TO A DEPTH OF TWO INCHES
TO PROVIDE FOR THE BONDING OF THE TOPSOIL TO THE SUBGRADE.
3.1. TOPSOIL SHALL BE PLACED ON ALL REHABILITATED AREAS TO PROVIDE SOIL CAPABLE OF SUPPORTING GRASS GROWTH.
3.2. TOPSOIL SHALL BE GRADED TO DRAIN THEN MODERATELY COMPACTED BY USE OF A SOIL-ROLLER OR OTHER C.O.R. APPROVED
METHOD.
3.3. IRREGULARITIES OR LOW SPOTS RESULTING FROM THE TOPSOILING OR OTHER OPERATIONS SHALL BE CORRECTED IN ORDER TO
PREVENT POCKETS WHERE WATER MAY STAND.
3.4. TOPSOIL SHALL NOT BE PLACED WHEN THE SUBGRADE IS FROZEN, EXCESSIVELY WET, EXTREMELY DRY, OR IN A CONDITION
OTHERWISE DETRIMENTAL TO THE PROPOSED PLANTINGS.
4. THE NATIONAL PARK SERVICE WILL PROVIDE ALL SEED REQUIRED FOR THE REVEGETATION PHASE OF THE PROJECT.
5. PREVIOUS AREAS THAT HAVE ACHIEVED FINAL FINE GRADING ACTIVITIES SHALL BE SEEDED UPON COMPLETION PROGRESSIVELY ACROSS THE PROJECT WORK AREA. THE CONTRACTOR SHALL NOT WAIT UNTIL THE ENTIRETY OF EARTHWORK IS COMPLETE BEFORE SEEDING
BEGINS.
6. ALL REPAIRS TO NATIONAL PARK INFRASTRUCTURE DUE TO PROJECT ACCESS, MATERIAL STORAGE, OR CONSTRUCTION ACTIVITIES MUST BE
COMPLETED PRIOR TO PROJECT CLOSE-OUT.
7. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS, TRASH, AND MATERIALS FROM PARK PROPERTY RELATED TO THE
CONSTRUCTION PROJECT PRIOR TO PROJECT CLOSE-OUT.
8. PRIOR TO FINAL INSPECTIONS, THE CONTRACTOR SHALL SWEEP ALL NEWLY CONSTRUCTED CONCRETE AND ASPHALT PAVEMENT; ALSO TO
INCLUDE WORK AREA ACCESS ROUTES, STAGING, AND MATERIAL STORAGE AREAS.
SCENIC DRIVE
2038'
2040'
2038'
2050'
2048'
2050'
2048'
2046'
2036'
2034'
2038' 2034'
2036'
2038'
2042'
CONCRETE
WHEEL STOPS
EXISTING
ASPHALT
PARKING LOT
(9740 SQ. FT. ±)
CONCRETE
WHEEL STOPS
CONCRETE
GARBAGE
CAN PAD
CONCRETE
WHEEL STOPS
STEEL TRAILHEAD
INFORMATION SIGN
EXISTING
ASPHALT
WALKWAY
(660 SQ. FT. ±)
CONSTRUCTION AREA
LIMITS
CONSTRUCTION AREA
LIMITS
CONSTRUCTION AREA
LIMITS
CONSTRUCTION AREA
LIMITS END OF EXISTING ASPHALT
PAVEMENT; UNSURFACED
TRAIL CONTINUES
VAULT TOILET BUILDING
TO BE INSTALLED BY NPS
PRIOR TO CONSTRUCTION
COMMENCEMENT
CADD:
TECH REVIEW:
DATE:
AUG. 10TH, 2020
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C1
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
CAPROCK COULEE PARKING
AREA EXISTING SITE PLAN
THRO2020-04
25OF
GENERAL SITE NOTES
1. ALL QUANTITIES NOTED WITHIN THIS PLAN SET ARE APPROXIMATE, AND PROVIDED FOR THE CONVENIENCE OF
THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL QUANTITIES PRIOR TO SUBMITTING
A BID OR COMMENCING CONSTRUCTION.
2. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION LAYOUT REQUIRED TO COMPLETE THE CONTRACTED
WORK.
3. NO CONSTRUCTION ACTIVITIES ARE PERMITTED OUTSIDE THE CONSTRUCTION LIMITS DELINEATED ON THE PLAN
SET.
4. ACCESS TO THE PARKING AREA SHALL BE CLOSED TO THE PUBLIC FOR THE DURATION OF THE CONSTRUCTION PROJECT. THE FOOTPRINT OF THE PARKING AREA MAY BE UTILIZED FOR STAGING EQUIPMENT AND MATERIAL STORAGE. ADDITIONAL EQUIPMENT AND MATERIAL STORAGE AREAS WILL BE DEFINED BY THE PROJECT C.O.R. AT
THE PRE-CONSTRUCTION MEETING.
5. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS, TRASH, AND MATERIALS FROM PARK PROPERTY RELATED TO THIS CONSTRUCTION PROJECT. THE USE OF PARK TRASH CONTAINERS IS NOT PERMISSIBLE. THE CLEANING OF EQUIPMENT SHALL BE CONDUCTED OFF PARK PROPERTY. LOCATION OF A TEMPORARY READY-MIX
CONCRETE TRUCK WASH-OUT SITE WILL BE DEFINED BY THE PROJECT C.O.R. DURING THE PRECONSTRUCTION
MEETING.
6. ALL SECURITY AND PROTECTION OF THE CONTRACTOR'S EQUIPMENT AND MATERIALS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE GOVERNMENT WILL NOT BE LIABLE FOR DAMAGE OR THEFT OF THE
CONTRACTOR'S TOOLS OR EQUIPMENT IF STAGED ON THE GROUNDS OF THE NATIONAL PARK.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PUBLIC SAFETY WHEN CONDUCTING WORK ADJACENT TO PUBLIC ACCESSED AREAS. PROTECTION MAY INCLUDE, BUT ARE NOT LIMITED TO BARRICADES, CONSTRUCTION FENCING, SIGNAGE OR A DEDICATED INDIVIDUAL TO MONITOR AND DIRECT WHEN THE PUBLIC IS PRESENT ADJACENT TO
ACTIVE WORK AREAS.
8. LOCATION OF TEMPORARY SERVICES ARE ALLOWED WITHIN THE IMMEDIATE PROJECT AREA. DURING THE PRE-CONSTRUCTION MEETING, THE PROJECT C.O.R. WILL IDENTIFY LOCATIONS FOR TEMPORARY SERVICES SUCH AS A SATELLITE TOILET AND DUMPSTERS. MAINTAINING TEMPORARY SERVICES SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR.
SUB SHEET NO.DESIGNED:
SCALE OF FEET
15 300 15
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
SCENIC DRIVE
SCENIC DRIVE
2038'
2040'
2038'
2050'
2048'
2050'
2048'
2046'
2036'
2034'
2038' 2034'
2036'
2038'
2042'
INSTALL 8"∅ EROSION
CONTROL FIBER ROLLS
INSTALL 8"∅ EROSION
CONTROL FIBER ROLLS
INSTALL 8"∅ EROSION
CONTROL FIBER ROLLS
INSTALL 8"∅ EROSION
CONTROL FIBER ROLLS
CONSTRUCTION AREA
LIMITS
CONSTRUCTION AREA
LIMITS
CONSTRUCTION AREA
LIMITS
CONSTRUCTION AREA
LIMITS
EXISTING
ASPHALT
PARKING LOT
(9740 SQ. FT. ±)
EXISTING
ASPHALT
WALKWAY
(660 SQ. FT. ±)
VAULT TOILET BUILDING
TO BE INSTALLED BY NPS
PRIOR TO CONSTRUCTION
COMMENCEMENT
END OF EXISTING ASPHALT
PAVEMENT; UNSURFACED
TRAIL CONTINUES
CADD:
TECH REVIEW:
DATE:
AUG. 10TH, 2020
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C2
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
CAPROCK COULEE PARKING
AREA EROSION CONTROL PLAN
THRO2020-04
25OF
EROSION CONTROL NOTES
1. ALL QUANTITIES NOTED WITHIN THIS PLAN SET ARE APPROXIMATE, AND PROVIDED FOR THE CONVENIENCE OF
THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL QUANTITIES PRIOR TO SUBMITTING
A BID OR COMMENCING CONSTRUCTION.
2. NO CONSTRUCTION ACTIVITIES ARE PERMITTED OUTSIDE THE CONSTRUCTION LIMITS DELINEATED ON THE PLAN
SET.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING THE LANDSCAPE ADJACENT TO THE PROJECT AREA
FROM SEDIMENT DISCHARGE DUE TO DEMOLITION AND CONSTRUCTION ACTIVITIES.
4. THE CONTRACTOR SHALL INSTALL 525 LINEAR FEET± OF 8" DIAMETER EROSION CONTROL FIBER ROLLS ALONG
THE PROJECT CONSTRUCTION LIMITS AS NOTED ON PLAN SHEET C2.
5. INSTALL FIBER ROLLS ALONG SLOPE CONTOURS. FOR ANY 20' SECTION OF FIBER ROLL, DO NOT ALLOW THE FIBER
ROLL TO VARY MORE THAN 5% FROM LEVEL.
6. STAKE FIBER ROLLS IN PLACE WITH 2" X 2" OR 2"∅ WOOD STAKES. SPACE WOOD STAKES 4' O.C. MAXIMUM, STAKE
FIBER ROLLS AT EACH END.
7. DRIVE STAKES INTO UNDISTURBED SOIL AT LEAST 12" DEEP. EXPOSE STAKES 2" ABOVE TOP OF FIBER ROLL.
8. WHEN INSTALLING FIBER ROLLS ON BARE SOIL, CONSTRUCT TRENCHES PARALLEL TO THE CONTOUR. AND PLACE FIBER ROLLS IN CONTINUOUS CONTACT WITH TRENCH BOTTOM AND SIDES. TAMP SOIL BACKFILL AGAINST UPSTREAM SIDE OF FIBER ROLL, TO ENSURE STORM WATER IS FORCED TO FLOW THROUGH FIBER ROLL RATHER
THAN UNDER IT.
9. FIBER ROLLS MAY BE OVERLAPPED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS.
10. THE CONTRACTOR SHALL PROVIDE EROSION CONTROL MAINTENANCE THROUGHOUT THE DURATION OF CONSTRUCTION, INCLUDING REPLACING/RESTAKING FIBER ROLLS WHICH MAY BECOME DISLODGED DUE TO
WILDLIFE ACTIVITIES.
11. THE PROJECT C.O.R. RESERVES THE RIGHT TO DIRECT MAINTENANCE, REPLACEMENT, OR ADDITION OF EROSION CONTROL MEASURES IF ENVIRONMENTAL CONDITIONS DEMONSTRATE PROTECTION IS INSUFFICIENT, OR THE
CONTRACTOR IS NOT PROACTIVELY MAINTAINING EROSION CONTROL MEASURES IN PLACE.
12. THE CONTRACTOR SHALL REMOVE ALL EROSION CONTROL MEASURES AFTER CONSTRUCTION IS COMPLETE, UNLESS DIRECTED BY THE PROJECT C.O.R. TO LEAVE EROSION CONTROL IN PLACE.
SUB SHEET NO.DESIGNED:
2038'
2040'
2038'
2050'
2048'
2050'
2048'
2046'
2036'
2034'
2038' 2034'
2036'
2038'
2042'
REMOVE EXISTING
ASPHALT SURFACE
(9740 SQ. FT. ±)
REMOVE
CONCRETE
GARBAGE
CAN PAD
SAW CUT
EXISTING ASPHALT
(86 LINEAR FT. ±)
SAW CUT
EXISTING ASPHALT
(74 LINEAR FT. ±)
CONSTRUCTION AREA
LIMITS
CONSTRUCTION AREA
LIMITS
CONSTRUCTION AREA
LIMITS
TRAILHEAD INFORMATION
SIGN TO BE REMOVED BY NPS
PRIOR TO CONSTRUCTION
COMMENCEMENT
REMOVE CONCRETE
WHEEL STOPS
REMOVE EXISTING
ASPHALT WALKWAY
(660 SQ. FT. ±)
REMOVE CONCRETE
WHEEL STOPS
REMOVE CONCRETE
WHEEL STOPS
CONSTRUCTION AREA
LIMITS
VAULT TOILET BUILDING
TO BE INSTALLED BY NPS
PRIOR TO CONSTRUCTION
COMMENCEMENT
END OF EXISTING ASPHALT
PAVEMENT; UNSURFACED
TRAIL CONTINUES
CADD:
TECH REVIEW:
DATE:
AUG. 10TH, 2020
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C3
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
CAPROCK COULEE PARKING
AREA REMOVAL PLAN
THRO2020-04
25OF
DEMOLITION/REMOVAL NOTES
1. ALL QUANTITIES NOTED WITHIN THIS PLAN SET ARE APPROXIMATE, AND PROVIDED FOR THE CONVENIENCE OF
THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL QUANTITIES PRIOR TO SUBMITTING
A BID OR COMMENCING CONSTRUCTION.
2. ALL REMOVED MATERIAL, INCLUDING DEBRIS AND EXISTING BITUMINOUS MATERIAL, SHALL BECOME THE RESPONSIBILITY OF THE CONTRACTOR, AND SHALL BE DISPOSED OF OFF-SITE FOLLOWING ALL APPLICABLE LOCAL, STATE, AND FEDERAL RULES AND REGULATIONS; UNLESS COORDINATED WITH THE PROJECT C.O.R. FOR ONSITE
STOCKPILING.
3. NO CONSTRUCTION ACTIVITIES ARE PERMITTED OUTSIDE THE CONSTRUCTION LIMITS DELINEATED ON THE PLAN
SET.
4. THE CONTRACTOR MAY TEMPORARILY CLOSE ONE LANE OF TRAFFIC ALONG THE SCENIC DRIVE IF NEEDED TO PERFORM CONSTRUCTION ACTIVITIES. HOWEVER, COMPLETE ROAD CLOSURES ARE NOT PERMISSIBLE DURING THE DURATION OF THIS PROJECT. COORDINATE WITH THE PROJECT C.O.R. NO LESS THAN 24-HOURS PRIOR TO
ANY TEMPORARY ONE-LANE ROAD CLOSURES.
5. NEATLY SAW-CUT ALONG THE LINE OF SCENIC ROAD AND PARKING AREA BEFORE REMOVING EXISTING PARKING
AREA ASPHALT PAVEMENT. SAW CUT ALL FACES VERTICALLY.
6. REMOVE EXISTING ASPHALT PARKING AREA, ASPHALT WALKWAY, NINE (9) EXISTING CONCRETE WHEEL STOPS
AND CONCRETE TRASH CONTAINER PAD.
7. REMOVED ASPHALT MAYBE RECYCLED AND INCORPORATED INTO THE NEW PARKING AREA BASE.
8. REMOVE CLAY PARKING AREA BASE TO A DEPTH NEEDED TO PROVIDE SPACE FOR ELEVEN (11) INCHES OF COMPACTED CLASS 5 AGGREGATE BASE. COORDINATE STOCKPILING OF WASTE CLAY SOIL ON NATIONAL PARK
SERVICE LANDS WITH PROJECT C.O.R.
9. EXISTING TRAILHEAD INFORMATIONAL SIGN WILL BE REMOVED BY THE NATIONAL PARK SERVICE PRIOR TO THE
START OF CONSTRUCTION ACTIVITIES.
10. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS, TRASH, AND MATERIALS FROM PARK PROPERTY RELATED TO THIS CONSTRUCTION PROJECT. THE USE OF PARK TRASH CONTAINERS IS NOT PERMISSIBLE.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PUBLIC SAFETY WHEN CONDUCTING WORK ADJACENT TO PUBLIC ACCESSED AREAS. PROTECTION MAY INCLUDE, BUT ARE NOT LIMITED TO BARRICADES, CONSTRUCTION FENCING, SIGNAGE OR A DEDICATED INDIVIDUAL TO MONITOR AND DIRECT WHEN THE PUBLIC IS PRESENT ADJACENT TO
ACTIVE WORK AREAS.
SUB SHEET NO.DESIGNED:
INSTALL PRECAST
CONCRETE WHEEL
STOPS
CONSTRUCTION AREA
LIMITS 15' OFFSET
INSTALL 6'-0" WIDE
CONCRETE ABA
WALKWAY
(540 SQ. FT. ±)
INSTALL AND GRADE
AGGREGATE BASE AND
INSTALL ASPHALT
PARKING LOT
(10,840 SQ. FT. ±)
CONSTRUCTION AREA
LIMITS 15' OFFSET
CONSTRUCTION AREA
LIMITS 15' OFFSET
INSTALL PRECAST
CONCRETE WHEEL
STOPS
INSTALL CONCRETE
PAD BETWEEN
PARKING AREA AND
VAULT TOILET
(451 SQ. FT. ±)
VAULT TOILET BUILDING
TO BE INSTALLED BY NPS
PRIOR TO CONSTRUCTION
COMMENCEMENT
INSTALL CONCRETE
ABA ACCESSIBLE PARKING
AND ADJACENT ACCESS PAD
(971 SQ. FT. ±)
INSTALL CONCRETE
PAD FOR GARBAGE
COLLECTION RECEPTACLE
INSTALL CONCRETE
PAD FOR GARBAGE
COLLECTION RECEPTACLE
INSTALL CONCRETE
PAD FOR GARBAGE
COLLECTION RECEPTACLE
CONSTRUCTION AREA
LIMITS 15' OFFSET
PAINT 4" WIDE
SOLID WHITE STRIPES
MATCH EXISTING
ROADWAY ELEVATION
MATCH EXISTING
ROADWAY ELEVATION
PAINT 4" WIDE SOLID BLUE
STRIPES FOR ABA ACCESS LANE
AND PAINT MUTCB ABA
PARKING STALL SYMBOL
PAINT 4" WIDE SOLID
WHITE STRIPES
INSTALL CONCRETE
PADS FOR GARBAGE
COLLECTION RECEPTACLE
END OF EXISTING ASPHALT
PAVEMENT; UNSURFACED
TRAIL CONTINUES
CADD:
TECH REVIEW:
DATE:
AUG. 10TH, 2020
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C4
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
CAPROCK COULEE PARKING
AREA PROPOSED SITE PLAN
THRO2020-04
25OF
GENERAL SITE CONSTRUCTION NOTES
1. ALL QUANTITIES NOTED WITHIN THIS PLAN SET ARE APPROXIMATE, AND PROVIDED FOR THE CONVENIENCE OF
THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL QUANTITIES PRIOR TO SUBMITTING
A BID OR COMMENCING CONSTRUCTION.
2. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION LAYOUT REQUIRED TO COMPLETE THE CONTRACTED
WORK.
3. NO CONSTRUCTION ACTIVITIES ARE PERMITTED OUTSIDE THE CONSTRUCTION LIMITS DELINEATED ON THE PLAN
SET.
4. THE CONTRACTOR SHALL INSTALL A NEW PARKING AREA CONSISTING OF MODIFIED PARKING LOT GEOMETRY, AGGREGATE BASE, AND ASPHALT SURFACE AS DETAILED ON PLAN SHEETS C4, C5, C6, C7, AND C8.
5. THE ASPHALT PARKING AREA SURFACE SHALL BE CONSTRUCTED OF TWO LIFTS OF NDDOT FAA-43 SUPERPAVE
HOT MIX ASPHALT AS DETAILED ON PLAN SHEET C5 AND C6.
6. THE CONTRACTOR SHALL INSTALL A CONCRETE ABA VAN ACCESSIBLE PARKING STALL AND ADJACENT CONCRETE ACCESS PAD WHICH TIES THE PARKING LOT TO THE AREA ADJACENT TO THE VAULT TOILET AND CONCRETE
WALKWAY AS DETAILED ON PLAN SHEETS C6 AND C7.
7. THE NATIONAL PARK SERVICE SHALL INSTALL A VAULT TOILET BUILDING WITHIN THE PROJECT AREA AS NOTED ON
THE PLAN SHEET PRIOR TO THE START OF PROJECT CONSTRUCTION.
8. THE CONTRACTOR SHALL INSTALL TWELVE (12) PRECAST CONCRETE WHEEL STOPS AND PAINT ALL PARKING
DELINEATION MARKINGS ON COMPLETED ASPHALT AND CONCRETE SURFACES.
9. THE CONTRACTOR SHALL INSTALL FIVE (5) CONCRETE PADS FOR GARBAGE COLLECTION CONTAINERS. ALL GARBAGE COLLECTION CONTAINERS SHALL BE BE INSTALLED BY THE NATIONAL PARK SERVICE, AS DETAILED ON
PLAN SHEETS C6, C7, AND C8.
SUB SHEET NO.DESIGNED:
INSTALL AND GRADE
AGGREGATE BASE AND
INSTALL ASPHALT
PARKING LOT
(10,840 SQ. FT. ±)
CONSTRUCTION AREA
LIMITS 15' OFFSET
50'-0"
R10'-0"
60'-0"
R5'-0"
16'-2"
R15'-0"
'-0
34'-11"
R3'-0"
R10'-0"
R40'-0"
'-2
6' -1
MATCH EXISTING
ROADWAY ELEVATION
MATCH EXISTING
ROADWAY ELEVATION
34'-6"
9'- 2"
123'-8"
10'-0"
10'-0"
.15
PC
.66
PT
.54
PO
L
.95
PO
L
.13
PC
.22PT
.70
PO
L
.40
PO
L
.59
PO
L
.33PC
.83PT
0.00
PC
0.0
PO
L
0.0
RA
DPT
0.0
RA
DPT
0.0
RA
DPT
120'-0"
40'-0"
40'-0"
40'-0"
CONSTRUCTION AREA
LIMITS 15' OFFSET
CONSTRUCTION AREA
LIMITS 15' OFFSET
CONSTRUCTION AREA
LIMITS 15' OFFSET
0.0
RA
DPT
R40'-0"
0.0
PO
L
0.0
PT
0.0
RA
DPT
.27PT
0.0
RA
DPT
0.0
PO
L
0.0
.86
PT
0.0
RA
DPT
'-0
'-0
13'-0"
6'-0"
'-0
C6
C6
C7
2'-0"
2'-0"
CADD:
TECH REVIEW:
DATE:
AUG. 10TH, 2020
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C5
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
CAPROCK COULEE PROPOSED
PARKING AREA LAYOUT
THRO2020-04
25OF
GENERAL PARKING AREA LAYOUT NOTES
1. ALL QUANTITIES NOTED WITHIN THIS PLAN SET ARE APPROXIMATE, AND PROVIDED FOR THE CONVENIENCE OF
THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALL QUANTITIES PRIOR TO SUBMITTING
A BID OR COMMENCING CONSTRUCTION.
2. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION LAYOUT REQUIRED TO COMPLETE THE CONTRACTED
WORK.
3. NO CONSTRUCTION ACTIVITIES ARE PERMITTED OUTSIDE THE CONSTRUCTION LIMITS DELINEATED ON THE PLAN
SET.
4. ALL SURVEY POINTS ARE HORIZONTALLY REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (2011), AND ARE PROJECTED TO THE NORTH DAKOTA STATE PLANE COORDINATE SYSTEM (SPCS) NORTH ZONE (FIPS 3301), SEE
PLAN SHEETS V1 AND V2 FOR DETAILS.
5. ALL SURVEY POINTS ARE VERTICALLY REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 AS REALIZED BY APPLYING GEOID 2012B TO ELLIPSOID HEIGHTS OF PRIMARY SURVEY CONTROL POINTS, SEE PLAN
SHEETS V1 AND V2 FOR DETAILS.
SUB SHEET NO.DESIGNED:
10 200 10
20'-0"
34'-11"
12'-2"
R15'-0"
C6
ABA PARKING STALL AND ACCESS PAD
SCALE A
A C6
SECTION ABA PARKING STALL AND ACCESS PAD
NOT TO SCALE
12'-0"
14'-6"
C6 A
13'-0"6'-0"
INSTALL 3 4" THICK PREFORMED
EXPANSION JOINT FULL DEPTH
OF CONCRETE BETWEEN PAD AND
VAULT TOILET BUILDING; PER DETAIL
2 ON PLAN SHEET C7
INSTALL CONSTRUCTION JOINT;
AS PER DETAIL 1 ON PLAN SHEET C7
ISA PAVEMENT MARKING SYMBOL
PRECAST CONCRETE
WHEELSTOPS; PER DETAIL 2
ON PLAN SHEET C6
2'-0"
TRANSITION BETWEEN CONCRETE
AND ASPHALT SURFACE SHALL NOT
EXCEED 14" CHANGE IN LEVEL
TRANSITION BETWEEN CONCRETE
AND ASPHALT SURFACE SHALL NOT
EXCEED 14" CHANGE IN LEVEL
6'-0"
20'-7"
MATCH FINISHED ELEVATION AT
FRONT OF VAULT TOILET
BUILDING, NOT TO EXCEED 14"
CHANGE IN LEVEL
THICKENED CONCRETE EDGE
12" OFFSET FROM EDGE OF ASPHALT
9" TOTAL DEPTH; PER DETAIL 3 ON
PLAN SHEET C6
TRANSITION BETWEEN
CONCRETE SURFACES SHALL NOT
EXCEED 14" CHANGE IN LEVEL
8'-3"
3'-0" x 3'-0" 5" THICK
CONCRETE PAD; PER
DETAILS 2 AND 4 ON
PLAN SHEET C8
VAULT TOILET BUILDING
TO BE INSTALL BY NPS PRIOR
TO COMMENCEMENT OF
PARKING LOT CONSTRUCTION
15'-4"
INSTALL CONSTRUCTION JOINT;
PER DETAIL ON PLAN SHEET C7
INSTALL CONSTRUCTION JOINT
AS PER DETAIL 1 ON PLAN SHEET C7
INSTALL ACCESSIBLE PARKING
SIGN; PER DETAIL 4 ON PLAN
SHEET C6
FINISHED
GRADE4:1 MAX
PRECAST CONCRETE
WHEELSTOP; PER DETAIL 2
ON PLAN SHEET C6
6'-0"20'-0" 6"
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE
SPECIFICATIONS
5" THICK CONCRETE
(3500 PSI COMPRESSIVE STRENGTH)
6 12" THICK CONCRETE
(4000 PSI COMPRESSIVE STRENGTH)
THICKENED CONCRETE EDGE
12" OFFSET FROM EDGE OF ASPHALT
9" TOTAL DEPTH; PER DETAIL 3 ON
PLAN SHEET C6
#4 REBAR GRID SPACED
2'-0" O.C. EACH WAY
6" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE
SPECIFICATIONS
11" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE
SPECIFICATIONS
4" ASPHALT PARKING AREA
SURFACE
INSTALLED IN TWO 2" LIFTS
C6
TYPICAL SECTION PARKING AREA
NOT TO SCALE
#4 REBAR GRID SPACED
2'-0" O.C. EACH WAY
6" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE
SPECIFICATIONS
6 12" THICK CONCRETE
(4000 PSI COMPRESSIVE STRENGTH)
11" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE
SPECIFICATIONS
2" HOT MIX ASPHALT PAVEMENT
NDDOT FAA 43 SUPERPAVE, PG58S-28
2" HOT MIX ASPHALT PAVEMENT
NDDOT FAA 43 SUPERPAVE, PG58S-28
VARIABLE WIDTH
10" SUBGRADE PREPARATION
THICKENED CONCRETE EDGE
12" OFFSET FROM EDGE OF ASPHALT
9" TOTAL DEPTH; PER DETAIL 3 ON
PLAN SHEET C6
INSTALL 6 12" THICK REINFORCED
CONCRETE (4000 PSI) PAD WITH
9" THICKENED EDGE
(972 SQ. FT.)
INSTALL 5" THICK REINFORCED
CONCRETE (3500 PSI) ACCESS PAD
(452 SQ. FT.)
10'-0" 10'-0"
1.5% SLOPE
1.5% SLOPE
SLOPE BREAKLINE
SLOPE BREAKLINE
SLOPE BREAKLINE
1.5% RUNNING SLOPE 1.5% RUNNING SLOPE
1.
5%
C
RO
SS
S
LO
PE
1.
5%
C
RO
SS
S
LO
PE
1.5% SLOPE
1.
5%
S
LO
PE
3'-0" x 3'-0" 5" THICK
CONCRETE PAD; PER
DETAILS 2 AND 3 ON
PLAN SHEET C8
1.5% SLOPE
1.5% SLOPE
1.5% SLOPE
2'-0"
ADDITIONAL NOTES
· ALL CONCRETE SHALL INCLUDE A COLOR PIGMENT MEETING ASTM C979/C979M
SPECIFICATIONS.
· COLORANT SHALL BE ADDED TO CONCRETE MIX USING THE PIGMENT MANUFACTURER'S
WRITTEN INSTRUCTIONS. THE COLORANT SHALL BE DAVIS #641 "SEQUOIA SAND" OR
EQUIVALENT.
· THE CONTRACTOR SHALL SUBMIT A COLORANT SAMPLE TO THE PROJECT C.O.R. FOR FINAL
COLOR SELECTION BEFORE INSTALLATION OF CONCRETE.
· ALL CONCRETE SURFACES SHALL BE FINISHED WITH A LIGHT BROOM FINISH, APPLIED
PERPENDICULAR TO TRAVEL PATH.
· SEE PLAN SHEET C7 FOR ADDITIONAL PAD AND TRAIL INFORMATION.
10" SUBGRADE PREPARATION
APPLY PRIME COAT TO
AGGREGATE BASE PRIOR
TO APPLYING 1ST LIFT
OF ASPHALT @ RATE OF 0.1
GAL/SQ. YARD
APPLY TACK COAT
BETWEEN SUCCESSIVE
LIFTS OF ASPHALT
@ RATE OF 0.1 GAL/SQ. YARD
PRECAST CONCRETE
WHEELSTOPS; PER DETAIL 2
ON PLAN SHEET C6
SEE PLAN SHEET C7 FOR
ADDITIONAL WALKWAY
INFORMATION
3'-0" x 3'-0" 5" THICK
CONCRETE PAD; PER
DETAILS 2 AND 3 ON
PLAN SHEET C8
34'-1"
ELEVATION VIEW
PLAN VIEW
DRAINAGE
OPENING
SIDE VIEW
DRAINAGE
OPENING
2" 25
8"
8"
4"2"
8"
Ø3 4"
2" 3
4"
C6
TYPICAL PRECAST CONCRETE WHEELSTOP
NOT TO SCALE
6'-0"
2'-8"
GROUT HOLE
FULL AFTER INSTALLING
STEEL ROD
2" MAXIMUM
CLEARANCE
3 4" STEEL ROD SHALL BE PLACED IN A
HOLE DRILLED IN THE FINISHED SURFACE
WITH A TIGHT FIT
9"
6"
1'-0"
6"
2"
C6
ABA PARKING & ACCESS PAD THICKENED EDGE
NOT TO SCALE
ACCESSIBLE
PARKING
RESERVED
VAN
RESERVED PARKING
SIGN R7-8 PER MUTCD
MANUAL
INSTALL VAN ACCESSIBLE
SIGN R7-8P PER MUTCD
MANUAL
4" x 4" WOOD POST
TREATED (RATED FOR
GROUND CONTACT)
C6
ABA PARKING SIGN INSTALLATION DETAIL
NOT TO SCALE
6" (TYP.)
" M
IN
IM
UM
T
O B
O
TT
O M
O F
LO
W
ES
T
SI
GN
MINIMUM POST HOLE DIAMETER
IS THE WIDEST POST DIMENSION PLUS 6"
CONCRETE
COMPACTED CLASS
5 AGGREGATE
2' -0
" M
IN
IM
UM
BU
RY
D
EP
TH
FINISHED GRADE
CADD:
TECH REVIEW:
DATE:
AUG. 10TH, 2020
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C6
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
CAPROCK COULEE PROPOSED
PARKING AREA DETAILS
THRO2020-04
25OF
SUB SHEET NO.DESIGNED:
SCALE OF FEET
4 8
ASCALE
0 4
20'-0"
34'-1"
12'-0"
14'-6"
INSTALL 3 4" THICK PREFORMED
EXPANSION JOINT FULL DEPTH
OF CONCRETE BETWEEN PAD AND
VAULT TOILET BUILDING; PER DETAIL
2 ON PLAN SHEET C7
INSTALL CONSTRUCTION JOINT;
PER DETAIL 1 ON PLAN SHEET C7
PRECAST CO
N
CRETE
W
H
EELSTO
P; PER D
ETAIL 2
O N
PLAN
SH
EET C6
2'-0"
TRAN
SITIO
N
BETW
EEN
CO
N
CRETE
AN
D
ASPH
ALT SURFACE SH
ALL N
O
T
EXCEED
14 " CH
AN
GE IN
LEVEL
6'-0"
20'-7"
MATCH FINISHED ELEVATION AT
FRONT OF VAULT TOILET
BUILDING, NOT TO EXCEED 14"
CHANGE IN LEVEL
TRANSITION BETWEEN
CONCRETE SURFACES SHALL NOT
EXCEED 14" CHANGE IN LEVEL
VAULT TOILET BUILDING
TO BE INSTALL BY NPS PRIOR
TO COMMENCEMENT OF
PARKING LOT CONSTRUCTION
15'-4"
INSTALL CONSTRUCTION JOINT;
PER DETAIL 1 ON PLAN SHEET C7
INSTALL ACCESSIBLE PARKING
SIGN; PER DETAIL 4 ON PLAN
SHEET C6
IN
STA
LL 6 12 " TH
ICK REIN
FO
RCED
CO
N
CRETE (4000 PSI) PA
D
W
ITH
9" TH
ICKEN
ED
ED
G E
(972 SQ
. FT.±)
IN
STA
LL 5" TH
ICK REIN
FO
RCED
CO
N
CRETE (3500 PSI) A
CCESS PA
D
(452 SQ
. FT.±)
INSTALL 5" THICK REINFORCED
CONCRETE (3500 PSI) WALKWAY
(90' LINEAR FT., 540 SQ. FT.±)
6'-0"
C7
CONCRETE WALKWAY
SCALE A
C7 B
C7 A
CENTERLINE HORIZONTAL
ALIGNMENT; PER ALIGNMENT
TABLE ON PLAN SHEET V2
1.0% (M
IN
) TO
1.5% (M
AX.)
CRO
SS SLO
PE
1.5%
SLO
PE
1.5%
SLO
PE
1.5%
RUN
N
IN
G SLO
PE
1.5%
RUN
N
IN
G SLO
PE
1.5%
SLO
PE
1.5%
SLO
PE
1.5% SLOPE
1.5%
SLO
PE
1.5% CROSS SLOPE
1.5% CROSS SLOPE
SLOPE BREAKLINE
SLOPE BREAKLINE
ADDITIONAL NOTES
· ALL CONCRETE SHALL INCLUDE A COLOR PIGMENT MEETING ASTM C979/C979M
SPECIFICATIONS.
· COLORANT SHALL BE ADDED TO CONCRETE MIX USING THE PIGMENT MANUFACTURER'S
WRITTEN INSTRUCTIONS. THE COLORANT SHALL BE DAVIS #641 "SEQUOIA SAND" OR
EQUIVALENT.
· THE CONTRACTOR SHALL SUBMIT A COLORANT SAMPLE TO THE PROJECT C.O.R. FOR FINAL
COLOR SELECTION BEFORE INSTALLATION OF CONCRETE.
· ALL CONCRETE SURFACES SHALL BE FINISHED WITH A LIGHT BROOM FINISH, APPLIED
PERPENDICULAR TO TRAVEL PATH.
· CONCRETE WALKWAY SLOPES SHALL NOT EXCEED 5% RUNNING SLOPE AND 1.5% CROSS
SLOPE.
INSTALL WALKWAY STEEL
REINFORCEMENT AS PER
DETAIL 1 ON PLAN SHEET C8
4:1 MAX
1.0% (MIN) TO 1.5% (MAX.) CROSS SLOPE
COMPACTED
AGGREGATE BASE COURSE
5" THICK CONCRETE
6'-0"
7'-0"
6" 6"1'-0" #4 REBAR PLACED MID-DEPTH 1'-0"
FINISHED
GRADE
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE
SPECIFICATIONS
4:1 MAX
FINISHED
GRADE
A C7
SECTION CONCRETE WALKWAY (6'-0" FINISHED WIDTH)
NOT TO SCALE
1.0% (MIN) TO 1.5% (MAX.) CROSS SLOPE
COMPACTED
AGGREGATE BASE COURSE
5" THICK CONCRETE
12'-0"
12'-6"
6"1'-0" #4 REBAR PLACED MID-DEPTH
SPACED 2'-0" O.C. EACH WAY
1'-0"
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE
SPECIFICATIONS
4:1 MAX
FINISHED
GRADE
B C7
SECTION CONCRETE ACCESS PAD
NOT TO SCALE
FLOOR OF VAULT
TOILET BUILDING
INSTALL 34" THICK PREFORMED EXPANSION
JOINT, FULL DEPTH OF CONCRETE, AS PER
DETAIL 2 ON PLAN SHEET C7
SCREEN WALL OF VAULT
TOILET BUILDING
#4 REBAR PLACED MID-DEPTH
SPACED 2'-0" O.C. EACH WAY
COMPACTED
CLASS 5 AGGREGATE BASE
CONCRETE (VARIOUS THICKNESS)
4" THICK PREFORMED
EXPANSION JOINT MATERIAL
TERMINATE EXPANSION JOINT MATERIAL NOT LESS
THAN 12" OR MORE THAN 1"BELOW FINISHED SURFACE
INSTALL JOINT SEALANT AS PER
MANUFACTURER'S RECOMMENDATIONS
2" DIAMETER SMOOTH STEEL DOWEL
18" LONG SPACED 24" O.C. SET MID-DEPTH
COMPACTED
CLASS 5 AGGREGATE BASE
CONCRETE (VARIOUS THICKNESS)
TOOLED JOINT 14" RADIUS
COMPACTED
CLASS 5 AGGREGATE BASE
CONCRETE (VARIOUS THICKNESS)
SAWED JOINT 18" KERF TO A DEPTH
OF 13 CONCRETE THICKNESS
GREASE OR CAP ONE END OF THE BAR
TO PREVENT ADHESION OF CONCRETE
C7
TYPICAL CONSTRUCTION/ISOLATION JOINT
NOT TO SCALE
C7
TYPICAL TOOLED CONTRACTION JOINT
NOT TO SCALE
C7
TYPICAL SAWED CONTRACTION JOINT
NOT TO SCALE
COMPACTED
CLASS 5 AGGREGATE BASE
CONCRETE
(VARIOUS THICKNESS)
3 4" THICK PREFORMED
EXPANSION JOINT MATERIAL
TERMINATE EXPANSION JOINT MATERIAL NOT LESS
THAN 12" OR MORE THAN 1"BELOW FINISHED SURFACE
C7
TYPICAL ISOLATION JOINT (NON-DOWELED)
NOT TO SCALE
INSTALL JOINT SEALANT AS PER
MANUFACTURER'S RECOMMENDATIONS
CADD:
TECH REVIEW:
DATE:
AUG. 10TH, 2020
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C7
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
CAPROCK COULEE PROPOSED
PARKING AREA DETAILS
THRO2020-04
25OF
SUB SHEET NO.DESIGNED:
SCALE OF FEET
4 8
ASCALE
0 4
2'-8"
6'-0" 6'-0" 6'-0"6'-0"
2'-8"
4'-0"
TIE ALL REBAR INTERSECTIONS
WITH STEEL WIRE REBAR TIES
#4 REBAR INSTALLED 1'-0" FROM
CONCRETE EDGE
1'-0"
1'-0"
5'-0" 5'-0"
SAWED OR TOOLED
CONTRACTION JOINT
EDGE OF ASPHALT 5" THICK CONCRETE
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE
SPECIFICATIONS
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE
SPECIFICATIONS
3'-0"
4" THICK ASPHALT
APPLIED IN TWO, 2" LIFTS
6"
EDGE OF CONCRETE
ACCESS PAD
FINISHED
GRADE
4" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE
SPECIFICATIONS
6" CLASS 5 AGGREGATE BASE
SEE ATTACHED TABLE FOR AGGREGATE
SPECIFICATIONS
3'-0"
6 12" THICK CONCRETE
6"
5" THICK CONCRETE
TRASH RECEPTACLE INSTALLED BY
NATIONAL PARK SERVICE
BEAR-SAVER MODEL HB1G-UP OR
APPROVED EQUIVALENT
TRASH RECEPTACLE INSTALLED BY
NATIONAL PARK SERVICE
BEAR-SAVER MODEL HB1G-UP OR
APPROVED EQUIVALENT
C8
ADJACENT TO ASPHALT PARKING AREA
SIDE ELEVATION - NOT TO SCALE
TYPICAL TRASH RECEPTACLE CONCRETE PAD
C8
ADJACENT TO CONCRETE ACCESS PAD
SIDE ELEVATION - NOT TO SCALE
TYPICAL TRASH RECEPTACLE CONCRETE PAD
C8
TYPICAL CONCRETE WALKWAY REINFORCEMENT
NOT TO SCALE
6'-0"
C8
TYPICAL TRASH RECEPTACLE CONCRETE PAD
TOP VIEW - NOT TO SCALE
3'-0"
3'-0"
ADDITIONAL NOTES
· ALL CONCRETE SHALL INCLUDE A COLOR PIGMENT MEETING ASTM C979/C979M
SPECIFICATIONS.
· COLORANT SHALL BE ADDED TO CONCRETE MIX USING THE PIGMENT
MANUFACTURER'S WRITTEN INSTRUCTIONS. THE COLORANT SHALL BE DAVIS #641
"SEQUOIA SAND" OR EQUIVALENT.
· THE CONTRACTOR SHALL SUBMIT A COLORANT SAMPLE TO THE PROJECT C.O.R. FOR
FINAL COLOR SELECTION BEFORE INSTALLATION OF CONCRETE.
· ALL CONCRETE SURFACES SHALL BE FINISHED WITH A LIGHT BROOM FINISH, APPLIED
PERPENDICULAR TO TRAVEL PATH.
· CONCRETE WALKWAY SLOPES SHALL NOT EXCEED 5% RUNNING SLOPE AND 1.5%
CROSS SLOPE.
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
AUG. 10TH, 2020
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
C8
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
CAPROCK COULEE PROPOSED
PARKING AREA DETAILS
THRO2020-04
25OF
TECH REVIEW:
DATE:
AUG. 10TH, 2020
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
V1
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
CAPROCK COULEE PARKING AREA
SURVEY CONTROL
COORDINATE DATA
THRO2020-04
25OF
SURVEY CONTROL COORDINATE DATA
1. HORIZONTAL DATUM: NORTH AMERICAN DATUM OF 1983 (2011) AS REALIZED BY TYING TO EXISTING PRIMARY NATIONAL PARK SERVICE
CONTROL MONUMENTS MCP2016-03 AND MCP2016-04. ALL DATA IS PROJECTED TO THE NORTH DAKOTA STATE PLANE COORDINATE
SYSTEM (SPCS) NORTH ZONE (FIPS 3301).
2. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 AS REALIZED BY APPLYING GEOID MODEL 2012B TO ELLIPSOID HEIGHTS
OF MCP2016-03 AND MCP2016-04 CALCULATED FROM GNSS OBSERVATIONS.
3. ALL COORDINATES AND MEASUREMENTS ARE GRID DISTANCES, USING THE INTERNATIONAL FOOT DEFINITION.
4. AVOID DAMAGE TO ALL SURVEY MONUMENTS FOUND IN PROXIMITY TO THE CONSTRUCTION AREA.
5. IMMEDIATELY REPORT ANY SURVEY MONUMENTS DAMAGED DURING PROJECT DEMOLITION OR CONSTRUCTION TO THE PROJECT C.O.R.
6. ANY SURVEY MONUMENTS DAMAGED DURING PROJECT DEMOLITION OR CONSTRUCTION SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE UNLESS NOTED ON PLAN SET.
SURVEY CONTROL POINTS
POINT ID NORTHING
(INTL. FT.)
EASTING
(INTL. FT.)
ELEVATION
(INTL. FT.) LATITUDE LONGITUDE ELLIPSOID HEIGHT
(INTL. FT.) CONVERGENCE ANGLE COMBINED SCALE
FACTOR DESCRIPTION
MCP2016-03 235,980.19' 1,258,815.78' 2,444.35' N47°36'38.0660" W103°22'40.1652" 2,386.88' -2°08'29" 0.9998558598 600-MM FENO MONUMENT WITH 3.5" DIAMETER ALUMINUM CAP SET ABOVE GRADE
MCP2016-04 231,675.98' 1,267,900.89' 1,995.44' N47°35'58.9439" W103°20'25.3432" 1,937.93' -2°06'49" 0.9998788777 600-MM FENO MONUMENT WITH 3.5" DIAMETER ALUMINUM CAP SET ABOVE GRADE
CP2016-14 235,492.33' 1,264,057.84' 2,050.99' N47°36'35.1805" W103°21'23.4470" 1,993.47' -2°07'32" 0.9998747646 600-MM FENO MONUMENT WITH 2" DIAMETER ALUMINUM CAP SET BELOW GRADE
FHWA 3080 235,361.82' 1,264,183.17' 2,047.24' N47°36'33.9393" W103°21'21.5484" 1,989.72' -2°07'31" 0.9998749933 FHWA ALUMINUM CAP STAMPED "3080" SET AT GRADE; UNKNOWN SETTING
CP-01 235,435.60' 1,264,296.37' 2,038.36' N47°36'34.7084" W103°21'19.9375" 1,980.84' -2°07'30" 0.9998753868 30" LONG #4 REBAR WITH GREEN PLASTIC CAP STAMPED "CONTROL POINT"
CP-02* 235,542.59' 1,264,205.35' 2,041.54' N47°36'35.7303" W103°21'21.3229" 1,984.02' -2°07'31" 0.9998751943 30" LONG #4 REBAR WITH GREEN PLASTIC CAP STAMPED "CONTROL POINT"
CP-03* 235,477.11' 1,264,168.35' 2,044.12' N47°36'35.0709" W103°21'21.8270" 1,986.60' -2°07'31" 0.9998750972 30" LONG #4 REBAR WITH GREEN PLASTIC CAP STAMPED "CONTROL POINT"
NOTE: PROJECT CONTROL POINTS CP-02 AND CP-03 ARE EXPECTED TO BE DESTROYED DURING PROJECT CONSTRUCTION. THE CONTRACTOR IS NOT LIABLE FOR DAMAGE TO CONTROL POINTS CP-02 AND CP-03.
TECH REVIEW:
DATE:
AUG. 10TH, 2020
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
V2
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
CAPROCK COULEE PARKING AREA
LAYOUT COORDINATE DATA
THRO2020-04
25OF
SURVEY COORDINATE DATA
1. HORIZONTAL DATUM: NORTH AMERICAN DATUM OF 1983 (2011) AS REALIZED BY TYING TO EXISTING PRIMARY NATIONAL PARK SERVICE
CONTROL MONUMENTS MCP2016-03 AND MCP2016-04. ALL DATA PROJECTED TO THE NORTH DAKOTA STATE PLANE COORDINATE
SYSTEM (SPCS) NORTH ZONE (FIPS 3301).
2. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 AS REALIZED BY APPLYING GEOID MODEL 2012B TO ELLIPSOID HEIGHTS
OF MCP2016-03 AND MCP2016-04 CALCULATED FROM GNSS OBSERVATIONS.
3. ALL COORDINATES AND MEASUREMENTS ARE GRID DISTANCES, USING THE INTERNATIONAL FOOT DEFINITION.
WALKWAY HORIZONTAL ALIGNMENT
TYPE STATION DISTANCE DIRECTION NORTHING
(INTL. FT.)
EASTING
(INTL. FT.)
BOP 0+00.00 235,540.24' 1,264,237.87'
TL = 39.22' N 63°13'16" E
PC 0+39.22 235,557.91' 1,264,272.89'
R = 100.00 Δ = 19°42'16" RT. 235,468.64' 1,264,317.94'
PT 0+73.61 235,567.87' 1,264,305.63'
TL = 16.39' N 82°55'33" E
EOP 0+90.00 235,569.89' 1,264,321.89'
PARKING AREA GEOMETRY POINTS
POINT ID NORTHING
(INTL. FT.)
EASTING
(INTL. FT.)
ELEVATION
(INTL. FT.) DESCRIPTION
5000 235,572.925' 1,264,110.888' 2D ONLY POINT ON LINE (POL) - MATCH EXISTING ROAD ELEVATION
5001 235,553.694' 1,264,133.575' 2,044.86' POINT OF TANGENCY (PT)
5002 235,547.451' 1,264,148.452' 2,043.15' POINT OF CURVATURE (PC)
5003 235,552.717' 1,264,161.506' 2,042.66' POINT OF TANGENCY (PT)
5004 235,558.303' 1,264,163.911' 2,042.54' POINT ON LINE (POL)
5005 235,538.526' 1,264,209.834' 2,041.95' POINT ON LINE (POL)
5006 235,527.360' 1,264,205.025' 2,042.13' POINT OF CURVATURE (PC)
5007 235,514.668' 1,264,205.411' 2,042.22' POINT OF TANGENCY (PT)
5008 235,483.507' 1,264,221.135' 2,041.70' POINT ON LINE (POL)
5009 235,492.518' 1,264,238.990' 2,041.40' POINT ON LINE (POL)
5010 235,438.953' 1,264,266.023' 2,039.60' POINT ON LINE (POL)
5011 235,434.831' 1,264,257.854' 2,040.33' POINT OF CURVATURE (PC)
5012 235,421.027' 1,264,253.629' 2,039.83' POINT OF TANGENCY (PT)
5013 235,390.940' 1,264,270.431' 2,039.27' POINT OF TANGENCY (PT)
5014 235,379.014' 1,264,277.630' 2D ONLY POINT ON LINE (POL) - MATCH EXITING ROAD ELEVATION
5015 235,415.040' 1,264,209.406' 2D ONLY POINT ON LINE (POL) - MATCH EXITING ROAD ELEVATION
5016 235,421.001' 1,264,210.776' 2D ONLY POINT OF TANGENCY (PT) - MATCH EXISTING ELEVATION
5017 235,517.576' 1,264,133.526' 2D ONLY POINT OF CURVATURE (PC) - MATCH EXISTING ELEVATION
5018 235,517.506' 1,264,123.356' 2D ONLY POINT ON LINE (POL) - MATCH EXISTING ROAD ELEVATION
5019 235,591.670' 1,264,149.887' 2D ONLY RADIUS POINT
5020 235,556.672' 1,264,152.321' 2D ONLY RADIUS POINT
5021 235,521.427' 1,264,218.802' 2D ONLY RADIUS POINT
5022 235,514.453' 1,264,129.622' 2D ONLY RADIUS POINT
5023 235,419.127' 1,264,208.433' 2D ONLY RADIUS POINT
5024 235,425.903' 1,264,262.359' 2D ONLY RADIUS POINT
5025 235,410.444' 1,264,305.354' 2D ONLY RADIUS POINT
DATE:
AUG. 10TH, 2020
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
STANDARD SPECIFICATIONS
SUBGRADE PREPARATION
THRO2020-04
25OF
SECTION 204 - SUBGRADE PREPARATION
204-1 DESCRIPTION
· THIS WORK SHALL CONSIST OF SCARIFYING, SHAPING, COMPACTING, AND MAINTAINING THE SUBGRADE PRIOR TO CONSTRUCTION OF AN
AGGREGATE BASE, AC BASE COURSE, OR SURFACE COURSE AND SHALL INCLUDE EXCAVATION AND/OR SHIFTING OF MATERIALS RESULTING
FROM ROUGH GRADING, TRENCHING, OR OTHER PRIOR CONSTRUCTION ACTIVITIES. SUBGRADE PREPARATION SHALL INCLUDE ALL WORK
TO DEPTHS SPECIFIED ON THE PLAN SHEETS OR IN THE SPECIAL PROVISIONS. WHEN SUBGRADE PREPARATION DEPTHS ARE NOT SPECIFIED, THE DEPTH SHALL BE ASSUMED TO BE A MINIMUM OF 6 INCHES BELOW THE SURFACE OF THE FINISHED SUBGRADE
204-2 CONSTRUCTION REQUIREMENTS
204-2.1 GENERAL
· IN ALL AREAS, PRIOR TO PLACING ANY OF THE BASE COURSE MATERIAL SPECIFIED ON THE PLAN SHEETS, THE ENTIRE SUBGRADE SURFACE
SHALL BE SCARIFIED TO A SPECIFIED DEPTH OF NOT LESS THAN 6 INCHES AND DRIED OR UNIFORMLY MOISTENED TO OBTAIN REQUIRED
COMPACTION.
· EXCESS SUITABLE EXCAVATED MATERIAL SHALL BE STOCKPILED AND REUSED WHENEVER POSSIBLE IN THE PROJECT. IF MATERIAL CANNOT
BE REUSED OR IS SURPLUS TO THE PROJECT, COORDINATE DISPOSAL OR ONSITE STOCKPILING WITH PROJECT C.O.R.
· ALL ROCKS LARGER THAN 2 INCHES IN SIZE AND OTHER UNSUITABLE MATERIAL SHALL BE REMOVED AND REPLACED WITH APPROVED
BACKFILL MATERIAL.
· ANY PORTIONS OF THE SUBGRADE NOT EASILY ACCESSIBLE TO MACHINE OPERATIONS, SUCH AS VALLEY GUTTERS, SHALL BE BROUGHT TO
THE PROPER ELEVATION AND COMPACTED BY METHODS APPROVED BY THE PROJECT C.O.R.
· DURING THE COURSE OF PREPARING THE SUBGRADE AND UNTIL THE ASPHALT PAVEMENT OR CONCRETE COURSES HAVE BEEN
CONSTRUCTED, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROTECT THE SUBGRADE AGAINST, AND REPAIR, ANY DAMAGE CAUSED
BY ADVERSE WEATHER, PUBLIC TRAFFIC, AND THE CONTRACTOR'S OWN OPERATIONS.
· THE SUBGRADE SHALL AT ALL TIMES BE COMPLETED FOR A SUFFICIENT DISTANCE AHEAD OF HAULING AND SPREADING BASE OR SURFACE
MATERIAL TO ALLOW ADEQUATE OPPORTUNITY FOR INSPECTION.
· NO MATERIALS SHALL BE PLACED ON THE SUBGRADE UNTIL IT HAS BEEN CHECKED AND APPROVED BY THE PROJECT C.O.R.
204-2.2 COMPACTION
· THE SUBGRADE SHALL BE COMPACTED BY APPROVED COMPACTION EQUIPMENT. APPROVED COMPACTION EQUIPMENT SHALL INCLUDE
SHEEPSFOOT ROLLERS, PNEUMATIC PACKERS, MECHANICAL PACKERS, MECHANICAL RAMMERS, VIBRATORY EQUIPMENT, TRUCKS, TRACTORS, SCRAPERS, MOTOR GRADERS, AND ALL OTHER TYPES OF EQUIPMENT USED IN EXCAVATING, TRANSPORTING, AND PLACING THE
SUBGRADE.
· SUBGRADE PREPARATION DEPTHS SPECIFIED ON THE PLAN SHEETS, SPECIAL PROVISIONS, OR THE MINIMUM OF 6 INCHES REQUIRED BELOW
THE SURFACE OF THE FINISHED SUBGRADE SHALL BE COMPACTED TO 95 PERCENT OF MAXIMUM DRY DENSITY AS DETERMINED BY ASTM
D1557 WITH A MOISTURE CONTENT FALLING WITHIN PLUS OR MINUS 3 PERCENT OF THE OPTIMUM MOISTURE CONTENT AS DETERMINED
BY SAID TESTING METHOD.
· THE SURFACE AFTER COMPACTION SHALL BE TRUE TO LINE, GRADE, AND CROSS SECTION.
· IF INSTABILITY OF SUITABLE MATERIALS BELOW THE SPECIFIED SUBGRADE PREPARATION DEPTH IS A RESULT OF EXCESSIVE MOISTURE FROM
RAINS, SURFACE RUNOFF, OR FROST ACTION, THE PROJECT C.O.R. MAY SUSPEND THE WORK TO ALLOW THE MATERIALS TO RECOVER
STRENGTH.
204-2.3 TOLERANCES
· IN THOSE AREAS UPON WHICH A SUBBASE, BASE, OR SURFACE COURSE IS TO BE PLACED, THE TOP OF THE SUBGRADE SHALL BE OF SUCH
SMOOTHNESS THAT WHEN TESTED WITH A 16 FOOT STRAIGHTEDGE APPLIED PARALLEL AND AT RIGHT ANGLES TO THE CENTERLINE, IT
SHALL NO SHOW ANY DEVIATION IN EXCESS OF 12 INCHES, OR SHALL NOT BE MORE THAN 0.05 OF A FOOT FROM TRUE GRADE ESTABLISHED
BY HUBS OR PINS.
· THE CONTRACTOR SHALL PERFORM ALL SURVEYING REQUIRED TO PREPARE THE SUBGRADE, TO THE TOLERANCES SPECIFIED.
DATE:
AUG. 10TH, 2020
T. BENTLEY
C. L. SEXTON
C. L. SEXTON
NPS PMIS NO: 254304 THRO DRAWING NUMBER 2020-04
SHEETPKG. NO.
TITLE OF SHEET DRAWING NO.
THEODORE ROOSEVELT NATIONAL PARK
STANDARD SPECIFICATION
AGGREGATE BASE/SURFACE
COURSES
THRO2020-04
25OF
SECTION 302 - AGGREGATE BASE AND AGGREGATE SURFACE COURSES
302-1 DESCRIPTION
· THIS ITEM SHALL CONSIST OF AGGREGATE BASE AND AGGREGATE SURFACE COMPOSED OF CRUSHED, PARTIALLY CRUSHED. OR UNCRUSHED COARSE AGGREGATE BONDED WITH EITHER SOIL OR FINE AGGREGATE OR BOTH. IT SHALL BE CONSTRUCTED ON A PREPARED UNDERLYING COURSE IN ACCORDANCE TO THESE SPECIFICATIONS AND SHALL CONFORM TO THE DIMENSIONS AND TYPICAL CROSS SECTION SHOWN
ON THE PLAN SHEETS.
302-2 MATERIALS
· IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FURNISH MATERIAL WHICH, WHEN COMPACTED, WILL SUPPORT THE
CONSTRUCTION EQUIPMENT WITHOUT SHOWING SIGNS OF DISPLACEMENT.
302-2.1 GRADATION
· THE GRADATION OF THE AGGREGATE BASE AND AGGREGATE SURFACE MATERIAL SHALL MEET THE REQUIREMENTS OF THE GRADATIONS
GIVEN IN THE FOLLOWING TABLE WHEN TESTED IN ACCORDANCE WITH ASTM C136.
SUB SHEET NO.DESIGNED:
· BLENDED BASE SHALL BE DEPOSITED, SPREAD, AND SHAPED SO THE MOIST AND COMPACTED COURSE CONFORMS TO THE REQUIRED GRADE AND CROSS SECTION. THE DESIRED DEGREE OF COMPACTION WILL BE ACCEPTABLE WHEN THE SURFACE IS TIGHTLY BOUND AND SHOWS NO
RUTTING OR DISPLACEMENT UNDER ROLLER OPERATIONS.
302-3 CONSTRUCTION REQUIREMENTS
302-3.1 PREPARING UNDERLYING COURSE
· THE UNDERLYING COURSE SHALL BE INSPECTED AND ACCEPTED BY THE PROJECT C.O.R. BEFORE PLACING AND SPREADING OPERATIONS ARE STARTED. ANY RUTS OR SOFT, YIELDING PLACES DUE TO IMPROPER DRAINAGE CONDITIONS, HAULING, OR ANY OTHER CAUSE SHALL BE CORRECTED AND ROLLED TO THE REQUIRED DENSITY BEFORE THE BASE COURSE IS PLACED THEREON.
· TO PROTECT THE UNDERLYING COURSE AND TO INSURE PROPER DRAINAGE, THE SPREADING OF THE BASE SHALL BEGIN ALONG THE CENTERLINE OF THE PAVEMENT ON A CROWNED SECTION OR ON THE HIGH SIDE OF THE PAVEMENT WITH ONE-WAY SLOPE.
302-3.2 METHODS OF SPREADING
· THE AGGREGATE BASE AND AGGREGATE SURFACE MATERIAL THAT IS CORRECTLY PROPORTIONED SHALL BE PLACED ON THE PREPARED UNDERLYING COURSE AND COMPACTED IN LAYERS OF THE THICKNESS SHOWN ON THE PLAN SHEETS.
· THE AGGREGATE BASE AND AGGREGATE SURFACE SHALL BE CONSTRUCTED IN LAYERS NOT LESS THAN 3 INCHES NOR MORE THAN 4 INCHES OF
COMPACTED THICKNESS.
· THE AGGREGATE AS SPREAD SHALL BE OF UNIFORM GRADING WITH NO POCKETS OF FINE OR COURSE MATERIALS.
· NO MATERIAL SHALL BE PLACED IN SNOW OR ON A SOFT, MUDDY, OR FROZEN COURSE.
· DURING THE MIXING AND SPREADING, SUFFICIENT CAUTION SHALL BE EXERCISED TO PREVENT THE INCORPORATION OF SUBGRADE, SUBBASE, OR SHOULDER MATERIAL IN THE BASE COURSE MIXTURE.
302-3.3 FINISHING AND COMPACTING
· WHILE SPREADING, THE AGGREGATE SHALL BE THOROUGHLY COMPACTED BY ROLLING. THE ROLLING SHALL PROGRESS GRADUALLY FROM THE SIDES TO THE CENTER OF LANE UNDER CONSTRUCTION, OR FROM ONE SIDE TOWARD PREVIOUSLY PLACED MATERIAL BY LAPPING UNIFORMLY
EACH PROCEEDING REAR WHEEL TRACK BY ONE-HALF THE WIDTH OF SUCH TRACK.
· ROLLING SHALL CONTINUE UNTIL THE ENTIRE AREA OF THE COURSE HAS BEEN ROLLED BY THE REAR WHEELS. THE ROLLING SHALL CONTINUE UNTIL THE AGGREGATE IS THOROUGHLY SET, THE INTERSTICES OF THE MATERIAL REDUCED TO A MINIMUM, AND UNTIL CREEPING OF THE
MATERIAL AHEAD OF THE ROLLER IS NO LONGER VISIBLE.
· ROLLING SHALL CONTINUE UNTIL THE AGGREGATE BASE AND AGGREGATE SURFACE MATERIAL HAS BEEN COMPACTED TO NO LESS THAN 95 PERCENT OF THE MAXIMUM DRY DENSITY AT OPTIMUM MOISTURE AS DETERMINED BY THE COMPACTION CONTROL TESTS SPECIFIED IN ASTM D1557 WITH A MOISTURE CONTENT FALLING WITHIN PLUS OR MINUS 3 PERCENT OR OPTIMUM MOISTURE CONTENT.
· BLADING AND ROLLING SHALL BE DONE ALTERNATELY AS REQUIRED OR DIRECTED TO OBTAIN A SMOOTH, EVEN, AND UNIFORMLY COMPACTED
BASE.
· THE COURSE SHALL NOT BE ROLLED WHEN THE UNDERLYING COURSE IS SOFT OR YIELDING OR WHEN THE ROLLING CAUSES UNDULATION IN THE BASE COURSE. WHEN THE ROLLING DEVELOPS IRREGULARITIES THAT EXCEED 12 INCH WHEN TESTED WITH A 16 FOOT STRAIGHTEDGE, THE IRREGULAR SURFACE SHALL BE LOOSENED, REFILLED WITH THE SAME KIND FO MATERIAL AS THAT USED IN CONSTRUCTING COURSE, AND
ROLLED AGAIN AS REQUIRED.
· IN AREAS INACCESSIBLE TO ROLLERS, THE AGGREGATE BASE AND AGGREGATE SURFACE MATERIAL SHALL BE TAMPED THOROUGHLY WITH
APPROVED MECHANICAL TAMPERS.
302-3.4 SURFACE TEST
· AFTER THE COURSE HAS BEEN COMPACTED, THE SURFACE SHALL BE TESTED FOR SMOOTHNESS AND ACCURACY OF GRADE AND CROWN. ANY PORTION LACKING THE REQUIRED SMOOTHNESS OR FAILING IN ACCURACY OF GRADE OR CROWN SHALL BE SCARIFIED, RESHAPED, RECOMPACTED, AND OTHERWISE MANIPULATED AS THE PROJECT C.O.R. MAY DIRECT UNTIL THE REQUIRED SMOOTHNESS AND ACCURACY ARE
OBTAINED.
· THE FINISHED SURFACE SHALL NOT VARY MORE THAN 12 INCH FROM A 16 FOOT STRAIGHTEDGE WHEN APPLIED TO THE SURFACE PARALLEL AND
AND AT RIGHT ANGLES TO THE CENTERLINE.
302-3.5 PROTECTION
· WORK ON AGGREGATE BASE AND AGGREGATE SURFACE SHALL NOT BE ACCOMPLISHED DURING FREEZING TEMPERATURES NOR WHEN THE SUBGRADE IS WET. WHEN THE AGGREGATES CONTAIN FROZEN MATERIALS OR WHEN UNDERLYING COURSE IS FROZEN, THE CONSTRUCTION
SHALL BE STOPPED.
302-3.6 MAINTENANCE
· FOLLOWING THE COMPLETION OF THE AGGREGATE BASE AND AGGREGATE SURFACE, THE CONTRACTOR SHALL PERFORM ALL MAINTENANCE WORK NECESSARY TO KEEP THE AGGREGATE BASE AND AGGREGATE SURFACE IN A CONDITION SATISFACTORY FOR PRIMING.
· AFTER PRIMING, THE SURFACE SHALL BE KEPT CLEAN AND FREE OF FOREIGN MATERIAL.
· THE BASE COURSE SHALL BE PROPERLY DRAINED AT ALL TIMES.
AGGREGATE SPECIFICATIONS
SIEVE SIZE OR TESTING
METHOD
AGGREGATE CLASS
2 3 3M 4 5 7 8 13
PERCENT PASSING OR TESTING REQUIREMENT
3 INCH 100
1-1/2 INCH 100
1 INCH 100 100 100 100
3/4 INCH 100 80-100 80-100 100 90-100 95-100 70-100
1/2 INCH 85-100
3/8 INCH 50-95 60-90
NO. 4 35-85 35-85 35-85 35-70 15-25 35-80 35-75
NO. 8 2-10 22-62
NO. 10 0-15
NO. 30 0-4…