Drawings_1.pdf

PDF 8 MB Posted

Attached to
Replace Mechanical System Federal contract opportunity
Solicitation number
140P5122R0001
Issued by
Department of the Interior National Park Service Southeast Region

View the file

Other files for this federal contract opportunity

Other files attached to Replace Mechanical System, newest first.
File Type Posted
Specification_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

cz

Q 21 OCMORE--------------

DARRAH HALL

/ RECONSTRUCTION ERA NATIONAL PARKCZ

o CAPERS

CREEK

±Z □ ST HELENA

ISLAND

CZ

Ld

// UX □/ CZIN </\

I crIx o\\X HARBOR

RIVER_______________ \______________

~~7 /------------ v r--------- \ x \

X

X X \o c \ \ \Q

\ \ \ X/ /cr \\<c XCD

OHL X\ X

\ \ Xo D X Southern Coastal 20X \ 020o

\ \ L 1I2\ SOUTH CAROLINACO

SCALE OF MILES

& SiCO<c XCO XoiRECONSTRUCTION ERA

NATIONAL HISTORIC PARK

IZ|CO / CCD

'ol INDEX OF DRAWINGS1 O Q

Si□□ SUB1^ I SHEET SHEET TITLE OF SHEET

COVER

FIRST FLOOR PLAN DEMO

FIRST FLOOR PLAN

FIRST FLOOR REFLECTED CEILING PLAN

NORTH EXTERIOR ELEVATION

AND ENLARGED ELEVATION

BUILDING AND WALL SECTIONS

ENLARGED PLAN AND ELEVATIONS

DETAILS

MECHANICAL LEGEND AND GENERAL NOTES

MECHANICAL DEMOLITION PLAN

MECHANICAL NEW WORK PLAN

MECHANICAL DETAILS

MECHANICAL SCHEDULES Sc CONTROLS

ELECTRICAL DEMOLITION FLOOR PLAN

ELECTRICAL NEW WORK PLAN

ELECTRICAL SCHEDULES

9CO

CO gCO

1CM

CZ A1.12M £?/CZ A1.23

3 A2.14h/Ll_

J 5 A3.15 / /2\—

A3.26□o /□ A4.17/O

5/ / A5.18O O<c

M0.19o l l□o / M1.010DARRAH HALL Xo ' \ X

// X, M1.1oo 11LO \\ \□ /ro X/ M5.012\□\ \ V M6.013□CO

\ \0o Ia E0.514\*x ------- \ Xo X E1.015DC

Q_

E3.016

HOLLAND Ci:CO

CZ

X

CD

O

CZ

LEGEND>oo

CD

PARK BOUNDARYCOo u1o PRESERVATION DISTRICT

BOUNDARY

COUNTY LINE

CD

r—

CO

COco

CM

CZ v.c. VISITOR CENTERCZ

Li_

J HQ. PARK HEADQUARTERS

£ (P) PARKINGO

I o o Q<

DARRAH HALL (PENN CENTER)

RECONSTRUCTION ERA NATIONAL

O

O O

OO

ID aro

266617BCO 200 0 200 400HISTORICAL PARKCD

SCALE (A)

O

CZ SCALE OF FEETCL

CM

A/E FIRMCM TITLE OF PROJECT DRAWING NO.on CONSTRUCTION DOCUMENTS 550REPLACE MECHANICAL SYSTEMPRIME/ARCH:

LORD, AECK

Sc SARGENT

ATLANTA, GA

CIVIL:

XXXX

XXXX

XX, XX

MECHANICAL:

NEWCOMB Sc

BOYD

ATLANTA, GA

175190NATIONAL

PARK

‘SERVICE

3 LOCATION WITHIN PARK

DARRAH HALL (PENN CENTER)

NAME OF PARK

RECONSTRUCTION ERA NATIONAL HISTORICAL PARK

COUNTY

REGION - S0UTEAST BEAUFORT

CD UNITED STATES

DEPARTMENT OF THE INTERIOR PMIS/PKG NO.

266617B ro

LANDSCAPE:

XXXX

XXXX

XX, XX

STRUCTURAL:

XXXX

XXXX

XX, XX

ELECTRICAL:

NEWCOMB Sc

BOYD

ATLANTA, GA

ro Dopartnont .of m« Inferior^ NATIONAL PARK SERVICE

SOUTHEAST REGIONAL OFFICE

SHEET

CM

REGION STATE

1 OF 1 6O

BASIC DATA:ro SOUTH CAROLINAr-O

LEGEND

^5/

NOTE 2

«NOTE 1

o

NOTE 4 NOTE 4

GENERAL NOTES

r i

A. DARRAH HALL IS AN HISTORIC STRUCTURE.

PROTECT ALL EXISTING BUILDING ELEMENTS NOT

DESIGNATED FOR REMOVAL

COORDINATE WITH NPS ARCHAEOLOGICAL

MONITORING (IF REQUIRED) FOR BELOW-GRADE

WORK.

i i

HVAC UNIT

i

B.i i i fr n 3---------[ 3---------[ i-------- ■

3-------- E 3-------- [a 0a a a [ DN i -|

J 5 o

DN

o NOTE 4 NOTE 3Q

Q_ CL □ o-i

5 □CO

CO

c MAIN HALLCD

D100CD

CL

X o Q □o

O-Io J

CL

CO SHEET SPECIFIC NOTESCd

I

1. REMOVE HVAC UNIT AND EXISTING CONCRETE PAD.

SEE MECHANICAL FOR REMOVAL OF DUCTWORK.□O

CL a y\

STOR.

<c DN tCO

2. REMOVE WOODEN FENCE SURROUNDING HVAC UNIT.o nn<c Cd

PROTECT EXISTING (HISTORIC) COURT MARKINGS ON

WOOD FLOOR, TYP. FOR DURATION OF THE WORK.

O 3.m 1011^ DNNOTE 4 Ji-------- 1

3---------[ i------ ■ 3---------[

[ i-------- 1cococo CM O c ET 4. PROTECT EXISTING BUILDING, STEPS, RAMP, <&

WALKS TO REMAIN, TYP.

3-------- [CL

LCL

5. REMOVE EXISTING BATT INSULATION REMNANTS AT

UNDERSIDE OF FLOOR STRUCTURE.

Li_

J NOTE 4

1—

NOTE 5, TYP.

(FULL BUILDING FOOTPRINT)

1o I

A3.2 J Lo J o o<c o oo NOTE 4oo inro DN CO 4 0 4 8 12o

SCALE ®O

CL SCALE OF FEETCL

CM FIRST FLOOR DEMOLITION PLAN1CM A/E FIRM DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETCd

550PRIME/ARCH:

LORD, AECK 8c

SARGENT

ATLANTA, GA.

SCALE (A)A1.1 FIRST FLOOR

DEMOLITION PLAN

fci KG%S'

% 175190Ao

A1.1KGJOE GRECO

ATLANTA, GEORGIA

l /; 6609 k

PMIS/PKG NO.

266617B ro TECH. REVIEW:MEP&F ENGINEERING:ro

O RBNEWCOMB 8c

BOYD

ATLANTA, GA.

SHEET

DARRAH HALL (PENN CENTER)

RECONSTRUCTION ERA NATIONAL HISTORICAL PARK

CM

>/A DATE:

05/07/2021 2 OF 16oro ro

NOTE 1A4.1

^5/\ T T I I I I

NOTE 2HVAC UNIT

GENERAL NOTES

—hi j i ii i i____ ____i i i nin: i ii n i -4J, 3---------C 3---------E 3-------- [ i--------1 a 0a a a i DN I 1 1 “I

\ y y 5

NOTE 4, TYP.o

DN

CD □ EHQ

NOTE 3CL

DC □

5 MAIN HALLCO

SHEET SPECIFIC NOTESDCO 100<Cm

1. INSTALL NEW WOOD FRAMED FENCE WITH LATTICE

SCREEN.

cl □X o O-l□Q 2. PROVIDE SHEET METAL COVER OVER DUCTS OUTSIDE

BUILDING FOOTPRINT. SLOPE COVER AWAY FROM

BUILDING FACE, TYP.

CL

CO

CL

I

CM

3. CLEAN AND PROVIDE BIOCIDE TREATMENT AT ALL

INTERIOR SURFACES, TYP., INCLUDING EXISTING

STAGE CURTAIN. PROTECT EXISTING HISTORIC PAINT

(COURT MARKINGS) ON WOOD FLOOR.

□O CL a y\

STOR.

<c DN tCO o nn<cCd 4. NEW FLOOR GRILLES SHALL FIT IN EXISTING FLOOR

OPENINGS W/ NO MODIFICATION, TYP. ALL GRILLES.

O m 1011^ DN Ji--------1

3---------[ i------ ■ J---------[

[ i--------1coco co NOTE 5 ELECTRICAL PANEL(S); SEE ELECTRICAL.5.CNJ O o o J---------[CL

L JCL

BID OPTION #1: IN LIEU OF EXTERIOR ELECTRICAL

PANEL, PROVIDE RECESSED PANEL AT BUILDING

INTERIOR, BETWEEN EXISTING STUDS AT

APPROXIMATE LOCATION SHOWN.

6.

NOTE 6Li_

J 1—

1o I

NOTE: INTERIOR WOOD PANELING IS NOT HISTORIC

AND NOT A CHARACTER DEFINING FEATURE.

A3.2 J LO J

o o co o o oo inro DN CO 4 0 4 8 12o

SCALE (A)O

CL SCALE OF FEETQ_

CNJ

FIRST FLOOR PLANCM A/E FIRM DESIGNED: DRAWING NO.1 SUB SHEET NO. TITLE OF SHEETCL

550PRIME/ARCH:

LORD, AECK 8c

SARGENT

ATLANTA, GA.

FIRST FLOOR PLANfci KGSCALE (A)A1.2 % % 1751903 Ao

A1.2KGJOE GRECO

ATLANTA, GEORGIA

l /; 6609 k

PMIS/PKG NO.

266617B to TECH. REVIEW:MEP&F ENGINEERING:ro

O RBNEWCOMB 8c

BOYD

ATLANTA, GA.

SHEET

DARRAH HALL (PENN CENTER)

RECONSTRUCTION ERA NATIONAL HISTORICAL PARK

CM

>/A DATE:

05/07/2021 3 OF 16oro

AutoCAD SHX Text

MAIN HALL

AutoCAD SHX Text

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

PRIME/ARCH:

AutoCAD SHX Text

A/E FIRM

AutoCAD SHX Text

LORD, AECK &

AutoCAD SHX Text

SARGENT

AutoCAD SHX Text

ATLANTA, GA.

AutoCAD SHX Text

MEP&F ENGINEERING:

AutoCAD SHX Text

NEWCOMB &

AutoCAD SHX Text

BOYD

AutoCAD SHX Text

ATLANTA, GA.

AutoCAD SHX Text

FIRST FLOOR

AutoCAD SHX Text

REFLECTED CEILING PLAN

AutoCAD SHX Text

AutoCAD SHX Text 175190

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KG

AutoCAD SHX Text

KG

AutoCAD SHX Text

RB

AutoCAD SHX Text 05/07/2021

AutoCAD SHX Text

DARRAH HALL (PENN CENTER)

AutoCAD SHX Text

RECONSTRUCTION ERA NATIONAL HISTORICAL PARK

AutoCAD SHX Text 266617B

AutoCAD SHX Text A2.1

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

SHEET SPECIFIC NOTES

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text 3/30/21 13:43 JMCLANEY R22 K:\PROJECTS\11358-00\CADD\01_CENTRAL_FILE\REER\266617B\DRAWINGS\ARCH\A2.1_FIRSTCLPL.DWG XREFS: ..\BASES\XA-CLNGPL.DWG;

AutoCAD SHX Text

1. CLEAN AND PROVIDE BIOCIDE TREATMENT AT ALL CLEAN AND PROVIDE BIOCIDE TREATMENT AT ALL INTERIOR SURFACES, TYP.

AutoCAD SHX Text

SCALE

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF FEET

AutoCAD SHX Text 3/16" = 1'-0"

AutoCAD SHX Text

FIRST FLOOR REFLECTED CEILING PLAN

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

SCALE

AutoCAD SHX Text A

AutoCAD SHX Text

NOTE 1

GENERAL NOTES(+1’-6*±)

RAISED PLATFORM/STAGE

(-1-0 1/2"±)______

FIN. FLR. LVL (WEST)

r I

(O’-O") l

FIN. FLR. LVL

—i(EAST)

I ia aI i ia aI ia i

Lr •

UNE OF FINISH FLOOR AT INTERIOR 2 @ FENCE

A4.1

3 @ BUILDING FACENORTH ELEVATION1 A4.1

o

SCALE (A)A3.1O

CO

CO

COc

CD

O

Q

Cd o c X

CO

CO<cCD

CO

Cd X o Q

_i SHEET SPECIFIC NOTES i

TO 1. PROVIDE SHEET METAL COVER OVER DUCTS OUTSIDE

BUILDING FOOTPRINT. SLOPE COVER AWAY FROM

BUILDING FACE, TYP.

<c ocm<c COo

2. INSTALL PRESSURE-TREATED WOOD FENCE W/

LATTICE SCREEN.

<C Cd Q

CD

1^

CO

co co

CM

Cd

(+1-6*±)Cd J*.

^ RAISED PLATFORM/STAGE

Li_

J / \ (-1-0 1/2’±) ____

FIN. FLR. LVL (WEST)

(-1-0 1/2"±)____

RN. FLR. LVL (WEST)

i—

!«!»I ’♦♦iWit A Io I rriiI ii nili io nili ii niloo<co

2 0 2 64O O

SCALE (D4co inro SCALE OF FEETA4.1 CO 4 0 4 8 12o

SCALE ®

O Cd SCALE OF FEETQ_

NORTH ELEVATION2

CM

CM A/E FIRM DESIGNED:SCALE ®A3.1 DRAWING NO.SUB SHEET NO. TITLE OF SHEETcm

550PRIME/ARCH:

LORD, AECK &

SARGENT

ATLANTA, GA.

NORTH EXTERIOR

ELEVATION AND

ENLARGED ELEVATION

KG%S'

% 1751903 Ao

A3.1KGJOE GRECO

ATLANTA, GEORGIA

l /; 6609 k

PMIS/PKG NO.

266617B fO TECH. REVIEW:MEP&F ENGINEERING:to

O RBNEWCOMB &

BOYD

ATLANTA, GA.

SHEET

DARRAH HALL (PENN CENTER)

RECONSTRUCTION ERA NATIONAL HISTORICAL PARK

CM >/A

^'RED DATE:

05/07/2021 5 OF 16oro

NOTE 2

O o

2CM

I A3.2o m QDCO

NOTE 4CO

CO

[ ] [cm

►8 COo 4 GENERAL NOTES□ II I5E O nn ii i□ ii inn i Tm J toco

CO

CM

O'

NOTE 3

Cd

NOTE 5. TYP.BUILDING SECTIONLi_ j 1 l— SCALE (A)A3.2 O

I o o Q C O

O O

LO

fO

O

Oct:

Q_

SHEET SPECIFIC NOTESO

Q

1. PROVIDE SHEET METAL COVER OVER DUCTS OUTSIDE

BUILDING FOOTPRINT. SLOPE COVER AWAY FROM

BUILDING FACE, TYP.

EXISTING BUILDINGO

CO

CO

CO 2. CLEAN AND PROVIDE BIOCIDE TREATMENT AT ALL

INTERIOR SURFACES, TYP., INCLUDING EXISTING

STAGE CURTAIN. PROTECT EXISTING HISTORIC PAINT

(COURT MARKINGS) ON WOOD FLOOR.

C□□

CO

Cd X o 5o 3. DUCTWORK SHALL PASS BELOW FLOOR STRUCTURE

AND BETWEEN PIERS TO ENTER CRAWL SPACE AND

DISTRIBUTE. DO NOT CUT OR OTHERWISE MODIFY

EXISTING BUILDING ELEMENTS.

A4.1 NOTE 1o

CO

I 19’—1>yCM ro

4< 7

48-5 tf 7-8 ff 3-0 ffO Cd

A5.1<c e. e. 4. PROVIDE BATT INSULATION AT UNDERSIDE OF

EXISTING FLOOR STRUCTURE, CONTINUOUS, TYP.

7 7

CO

o

1<C I I II ■7TCd

5. NEW SIDEWALL GRILLES SHALL FIT IN EXISTING

OPENINGS WITHOUT MODIFICATION, TYP. AT ALL

GRILLES.

O

NOTE 4m co aCO

HVAC UNIT

(SEE MECH.)

CO OCM oIQ£

6. HVAC UNIT & CONCRETE EQUIPMENT PAD; SEE

MECH & A1.2.

LOO'

Li_

J z4 3.TT T•••£ 1—

• ic 3 G3 '*• 4-A A o I o

NOTE 3O NOTE 6Q

C Uo

J 2 0 2 64O

1 Jo SCALE ©COin WALL SECTIONro SCALE OF FEET2

SCALE (§)

CO A3.2 4 0 4 8 12o

SCALE (A)

O

SCALE OF FEETQ_

CNJ

CM A/E FIRM DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETon

550PRIME/ARCH:

LORD, AECK 8c

SARGENT

ATLANTA, GA.

BUILDING AND WALL

SECTIONS

fci KG%S'

% 1751903 Ao

A3.2KGJOE GRECO

ATLANTA, GEORGIA

l /; 6609 k

PMIS/PKG NO.

266617B

M" TECH. REVIEW:MEP&F ENGINEERING:ro

O RB'Py NEWCOMB 8c

BOYD

ATLANTA, GA.

SHEET

DARRAH HALL (PENN CENTER)

RECONSTRUCTION ERA NATIONAL HISTORICAL PARK

CM

>/A Yred fYJ DATE:

05/07/2021 6 OF 16oro

20’—8 9920-8 >9

7^7^ 7^ NOTE 2

EQ.EQ. EQ. 1X6 CAP-X--><- ->*-1 6’—199

FOOTING

7^ 7^5 2X4CONC. PAD

A5.1 HORIZONTAL

FRAMEn0£ S—Vv J 1X2 TRIM

COVERING

LATTICE, TYP.

m OPP oo a ii 4 mm o A4.1

2X4 BOARD

OVER 4X4

POST, TYP.4

A4.1 r r\ \ \ \Q

GENERAL NOTESCL00 HVAC UNIT2’—699 2-6 99

I ENLARGED NORTH ELEVATION © FENCE7^ 7^ 7^ 7^ 2o00 CLEAR CLEAR SCALE ® 1. ALL WOOD TO BE PRESSURE TREATED.A4.1Oco O

I

COORDINATE DUCT COVER AND SUPPORT FRAMES

W/ MECHANICAL EQUIPMENT AND DUCT DIMENSIONS

& ROUTING.

2.e>

NOTE 4Q

CL

DC

6NOTE 1i @ END VERTICAL SUPPORT£ -t- = Y- A5.15v Vy yCO CO A4.1DC 7NOTE 1<c O 5 □CD © CENTER VERTICAL SUPPORTI

> A5.1m 4”oe> Q

\\ DUCT WORKjI r'------ 1

TCOQ I I

I I

<C

T---------“Tx

5 SHEET SPECIFIC NOTESCO O

CO A4.1<c I00 f y\ \ 1. PROVIDE SHEET METAL COVER OVER DUCTS OUTSIDE

BUILDING FOOTPRINT. SLOPE COVER AWAY FROM

BUILDING FACE, TYP.

NOTE: AT BUILDING FACE, SHEET METAL SHALL STEP

TO CONFORM TO WOOD CLAPBOARD PROFILE.

EXISTING WOOD CLAPBOARD SIDING SHALL NOT BE

MODIFIED.

/K^^ ro NOTE 3r-o ii Fi Oi i

NOTE 5 ODC

o

O99±63 i i i i

(VIF) | I ICO

I I

CO<

2. INSTALL PRESSURE-TREATED WOOD FENCE W/

LATTICE SCREEN.

CD ◄CD

Od

X ENLARGED HVAC UNIT PLAN 2” X 2” X GALVANIZED STEEL ANGLE FRAME.

EMBED INTO ISOLATED CONCRETE POUR.

3.1O

ENLARGED NORTH ELEVATION @ BUILDING FACE3o SCALE ®A4.12i

__ I

SCALE (§)A4.1

2” X 2” X Vs” GALVANIZED STEEL ANGLE FRAME W/

BASE PLATE. ATTACH TO CONCRETE EQUIPMENT PAD.

O 4.o

LOCATE CENTER FRAME

PER MECH.

DC

i 5. ATTACH 2X4 LUMBER TO STEEL ANGLES FOR HORIZONTAL DUCT COVER SUPPORT.<c

99± 6ocm <c

17’—6 y2

COo

3NOTE 1<c NOTE 21 ’—1099EQ. EQ. EQ.Qd Q

7 ■ A5.1NOTE 5CD

1^

NOTE 1CO

COco

CM

Qd IT Qd

'ii--------i-nIIsaao \Ll.

—l' I HVAC UNIT I IN\2i— m lo I o ~/sQ 1mm••• zo

J.c -J.-1. -J.o o NOTE 4O

4 0 4 8 12CO

SCALE (A)in NOTE 5ro

SCALE OF FEETCO NOTE 3o 2 0 2 64

SCALE ©O

Qd Q_

SCALE OF FEETCO ENLARGED WEST ELEVATION @ FENCE ENLARGED WEST ELEVATION @ DUCT COVER>- 4 5CO

SCALE ® SCALE ®A4.1 A4.1

CO

CM

CM A/E FIRM DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETcm

550PRIME/ARCH:

LORD, AECK &

SARGENT

ATLANTA, GA.

ENLARGED PLANS,

ELEVATIONS, AND

DETAILS

fci KG%S' % 1751903 Ao

A4.1KGJOE GRECO

ATLANTA, GEORGIA

l /; 6609 k

PMIS/PKG NO.

266617B oo o TECH. REVIEW:MEP&F ENGINEERING:in A, O RBNEWCOMB &

BOYD

ATLANTA, GA.

SHEET

DARRAH HALL (PENN CENTER)

RECONSTRUCTION ERA NATIONAL HISTORICAL PARK

CM >/A

^ERED DATE:

05/07/2021 7 OF 16oro

1 LEGENDy* A5.1 nEXISTING WOOD SIDING

(DO NOT MODIFY)

y^

SLOPING SHEET

METAL TOP

JOINT SEALANT Jo

PROTECT EXISTING

WOOD SIDINGNOTE 2,----------------

ATTACHED W/ S.S.

FASTENERS W/

NEOPRENE

WASHERS

'/j yj

NOTE 2.----------------

ATTACHED W/ S.S.

FASTENERS W/

NEOPRENE

WASHERS

2X4 WD. BLOCKING

(REMOVABLE)

SHEET METAL COVER-

FOLLOWS PROFILE OF

EXISTING WOOD SIDING,

TYP.2X4 WD. BLOCKING

(REMOVABLE)

yA CONCEALED 2X4------

ATTACHED TO SIDING

(REMOVABLE)

DUCT COVER DETAIL DUCT COVER PLAN DETAIL1 2

SS FASTENERS W/-

NEOPRENE WASHERS

SCALE @ SCALE ©A5.1 A5.1

GENERAL NOTES

1. ALL WOOD TO BE PRESSURE TREATED.NOTE 21X6 WD. TRIM W/ MITERED CORNERS

1X6 WD. CAP

HVAC

DUCT

4X4 WD. POST

2”X 2” X \b” ANGLE

1X2 WD. TRIM

1X2 WOOD TRIM

(SEE ELEVATION)

GRADE

2X4 WD. LUMBER

(CONTINUOUS)

1X4 WD. TRIM

(BEYOND)

1X4 WOOD TRIM

NOTE 1

o

Oo I I NOTE 15o

3 o 4X4 POSTI oCO

V*ICO in<

CO

DUCT COVER ELEV. DETAIL2X4 WD. LUMBER

(BETWEEN POSTS)

1X2 WD. TRIM

3y* CORNER POST MIDDLE POSTS CORNER POSTo SCALE ©A5.1o

SHEET SPECIFIC NOTES

FENCE POST PLAN DETAILSCd y^ 5o

1. WOOD LATTICE: PRESSURE TREATED, THICK,

DIAGONAL PATTERN W/ 2 GRID OPENINGS.

2. GALVANIZED SHEET METAL COVER FOR DUCTS W/

HIGH-PERFORMANCE COATING.

SCALE ©A5.1SEALANT, TYP.<c

X NOTE 2CO

2X4 HORIZONTAL

WD. SUPPORT

CO GRADE<c

2X4 WD. SUPPORTCO

LINE OF

DUCT = ==== ICO

NOTE 2 2X4 HORIZONTAL

WD. SUPPORT

Cd X L ' 2” X 2” X y8”

GALV. STEEL

ANGLE (FLANGE

FACING COVER)

o / I l=l 11— CONCRETEooO ICO

V*m 7^14 YE Q

A-I

COMPACTED

GRAVEL

LO i<C o END SUPPORT PLAN DTL.Cd 82” X 2” X y8"

GALV. STEEL

ANGLE (FLANGE

FACING COVER)

<c DUCT COo

SCALE @A5.1

<C Cd Q m i^ CO 8COco ENLARGED DUCT COVER DETAIL @ ENDSCM 6 NOTE 2cd

SCALE ©A5.1 2X4 WD. SUPPORTCd

LINE OF

DUCTFENCE DETAILLi_

J 4 WOOD

BLOCKING2

l— SCALE ©A5.1 2X4 WOOD 0 2 SCALE ©o

2” X 2” X Vs

GALV. STEEL

ANGLE (FLANGE

FACING DUCT)

i

NOTE 2 SCALE OF FEETO

O

WOOD

BLOCKING AS

REQUIRED

o<co

0 1/2 3Oo SCALE ©oo in ro SCALE OF FEETCENTER SUPPORT PLAN DTL9/CO 2X4 HORIZONTAL

WD. SUPPORT1 SCALE ©A5.1o o Cd

CL DUCT

2” X 2” X /8”

GALV. STEEL

ANGLE (FLANGE

FACING DUCT)

CM

CM A/E FIRM DESIGNED: DRAWING NO.SUB SHEET NO. TITLE OF SHEETcm

550PRIME/ARCH:

LORD, AECK &

SARGENT

ATLANTA, GA.

ENLARGED PLANS,

ELEVATIONS, AND

DETAILS

fci KG%S' % 1751903 Ao

A5.1ENLARGED DUCT COVER DETAIL @ CENTER KGJOE GRECO

ATLANTA, GEORGIA

l /; 6609 k

7 PMIS/PKG NO.

266617B

M"

TECH. REVIEW:

SCALE © MEP&F ENGINEERING:A5.1ro

O RBNEWCOMB &

BOYD

ATLANTA, GA.

SHEET

DARRAH HALL (PENN CENTER)

RECONSTRUCTION ERA NATIONAL HISTORICAL PARK

CM

>/A

"TRED DATE:

05/07/2021 8 OF 16oro

Signed on 05/07/2021 using a Digital Signature

DocuSign Envelope ID: DD9D0D4F-61BC-458C-8C81-56EB3A74484D

HVAC LEGEND GENERAL NOTES!

SEISMIC AND WIND LOAD DESIGN REQUIREMENTS FOR MECHANICAL SYSTEMS

1. GENERAL NOTES ON THIS DRAWING ARE APPLICABLE TO EACH

MECHANICAL DRAWING OF THIS SET. SEE EACH DRAWING FOR SPECIFIC

NOTES APPLICABLE TO THAT DRAWING.

0 DRAIN

EQUIPMENT, APPLIANCES AND SUPPORTS (INCLUDING ROOF CURBS AND ROOF RAILS) EXPOSED TO WIND SHALL BE DESIGNED AND INSTALLED TO RESIST THE WIND PRESSURES DETERMINED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. WHERE SEISMIC RESTRAINT IS REQUIRED, THE MORE DEMANDING FORCE OF WIND AND SEISMIC MUST BE USED. SEE SEISMIC INFORMATION CONTAINED IN THE STRUCTURAL DRAWINGS FOR SITE SPECIFIC INFORMATION ON SEISMIC DESIGN CATEGORY, EQUIPMENT SCHEDULES AND DETAILS FOR SPECIFIC COMPONENT IMPORTANCE FACTOR DESIGNATIONS.

SEE COMPONENT/SYSTEM SCHEDULE BELOW FOR SPECIFIC COMPONENT IMPORTANCE FACTOR DESIGNATIONS AND SEISMIC DESIGN CRITERIA.

USE SEISMIC DESIGN CATEGORY TABLE BELOW TO DETERMINE SEISMIC RESTRAINT REQUIREMENTS FOR EACH ELECTRICAL COMPONENT/SYSTEM.

FOR ALL COMPONENTS/SYSTEMS REQUIRING SEISMIC RESTRAINT, THE COMPONENT SUPPORTS AND ATTACHEMENTS SHALL BE DESIGNED (CALCULATIONS AND INSTALLATION DETAILS) AND STAMPED BY A REGISTERED PROFESSIONAL ENGINEER (SEISMIC ENGINEER) THAT IS DIRECTLY EMPLOYED BY THE SEISMIC RESTRAINT MANUFACTURER (W-2 EMPLOYEE) WITH AT LEAST FIVE YEARS OF SEISMIC DESIGN EXPERIENCE, LICENSED IN THE STATE OF THE JOB LOCATION.

ALL RESTRAINING DEVICES SHALL HAVE A PREAPPROVAL NUMBER FROM CALIFORNIA OSHPD OR SOME OTHER RECOGNIZED GOVERNMENT AGENCY SHOWING

MAXIMUM RESTRAINT RATINGS.

WHERE SEISMIC RESTRAINT IS REQUIRED, HOUSEKEEPING PADS NEEDED FOR INSTALLATION OF EQUIPMENT UNDER THIS CONTRACT MUST BE DESIGNED AND STAMPED BY THE SEISMIC ENGINEER. DO NOT POUR ANY HOUSEKEEPING PADS PRIOR TO THE RECEIPT OF AN APPROVED SEISMIC SUBMITTAL FROM THE ENGINEER OF RECORD. ALL HOUSEKEEPING PADS DESIGNED AS EXPANSIONS TO EXISTING PADS OR INSTALLED ON TOP OF EXISTING CONCRETE FLOOR

SYSTEMS SHALL BE DOWELED INTO THE EXISTING SYSTEMS.

A.

ELBOW - TURNED DOWNe

2. COORDINATE WORK WITH APPROPRIATE AUTHORITIES HAVING JURISDICTION

AND OBTAIN ALL NECESSARY PERMITS AND INSPECTIONS. WHEN WORK

IS COMPLETE, PROVIDE THE OWNER WITH APPLICABLE CERTIFICATES OF

FINAL INSPECTION AND COMPLETION FROM SAID AUTHORITIES.

ELBOW - TURNED UPo

B.

EXISTING PIPING TO BE REMOVED

C.

3. INSTALL THE SYSTEMS IDENTIFIED IN THE CONTRACT DOCUMENTS IN

ACCORDANCE WITH THE LISTED CODES AND STANDARDS AND THE

REQUIREMENTS OF LOCAL CODES AND ORDINANCES.

A CONFLICT BETWEEN VARIOUS CODES AND STANDARDS, THE MOST

STRINGENT SHALL APPLY.

DUCTWORK AND AIR DISTRIBUTIOND.

IN THE EVENT OF^ 20 x 20 } DUCT (FIRST DIMENSION IS SIDE SHOWN IN INCHES)

I 7 DUCT LINING (1” THICK UNLESS 2” NOTED)

4. COORDINATE LOCATION AND INSTALLATION OF EQUIPMENT WITH OTHER

TRADES. VERIFY THAT THE MANUFACTURER’S REQUIRED CLEARANCES

FOR MAINTENANCE AND OPERATION ARE PROPERLY MAINTAINED.

EQUIPMENT WITH FILTERS SHALL BE INSTALLED SO THAT FILTERS CAN BE

EASILY REMOVED AND REPACED.

E.

SUPPLY AIR DUCT SECTION

RETURN OR OUTSIDE AIR DUCT SECTION

F. SEISMIC RESTRAINTS FOR DUCTWORK AND PIPING MUST BE SHOWN ON LAYOUT DRAWINGS SHOWING SPECIFIC RESTRAINT LOCATIONS ALONG WITH

ACCOMPANYING DETAILS AND CALCULATIONS PER THE SEISMIC ENGINEER.

AFTER INSTALLATION, MANUFACTURER’S TRAINED REPRESENTATIVE SHALL VERIFY THAT SEISMIC AND WIND RESTRAINTS ARE INSTALLED AND OPERATING

PROPERLY AND SHALL SUBMIT A CERTIFICATE SO STATING.

I TRANSITION2 5. ARRANGE PIPING AND DUCTWORK, PARTICULARLY ABOVE CEILINGS, AS

REQUIRED TO CLEAR STRUCTURE, DUCTS, CONDUIT, ETC. ALLOWING

SPACE FOR PIPE HANGERS, EXPANSION LOOPS AND ACCESS TO VALVES,

FILTERS AND MAINTENANCE OF EQUIPMENT.

G. 7l 90° BRANCH TAKEOFF

RECTANGULAR OR FLAT OVAL DUCTWORK WITH CONICAL TAP AND

FLAT OVAL OR ROUND BRANCH DUCT

H. REFER TO ASCE 7-10 FOR SEISMIC INSTALLATION GUIDELINES. I 7 6. COORDINATE LOCATION OF GRILLES, REGISTERS, DIFFUSERS, THERMOSTATS AND OTHER WALL MOUNTED HVAC ACCESSORIES WITH

INTERIOR ELEVATIONS. COORDINATE WITH ACCESSORIES INSTALLED BY

OTHER TRADES SO AS TO PRESENT A NEAT AND ATTRACTIVE

INSTALLATION THROUGHOUT THE ENTIRE BUILDING. COORDINATE LOCATION

OF ANY INSTALLATIONS WITH NATIONAL PARK SERVICE (NPS).

COMPONENT/SYSTEM IMPORTANCE FACTOR (Ip) SCHEDULE AND SEISMIC DESIGN INFORMATION 7 l>l 7 TRANSITION FROM RECTANGULAR TO ROUND DUCTWORK

Ip = 1.0 ALL POWER SYSTEMS AND COMPONENTS UNLESS NOTED OTHERWISE MD MANUAL DAMPER (MD), BACKDRAFT DAMPER (BD), LOW LEAKAGE

MANUAL DAMPER (LMD), OR CONTROL DAMPER (CD)

i 7iSEISMIC DESIGN INFORMATION:

1. SITE CLASSIFICATION = D

2. RISK CATEGORY = II

3. SHORT PERIOD DESIGN SPECTRAL ACCELERATION (SD1) = 0.257

4. LONG PERIOD DESIGN SPECTRAL ACCERLARTION (SDS) = 0.509

5. SEISMIC DESIGN CATEGORY = D

7. OUTSIDE AIR INTAKE OPENINGS FOR VENTILATION AIR SHALL BE LOCATED

10 FEET MEASURED IN ANY DIRECTION FROM ANY EXHAUST AIR

TERMINATION POINTS, FLUES, VENTS, CHIMNEYS, GAS METERS, GAS

REGULATORS, PLUMBING VENTS UNLESS TOP OF SUCH INTAKE OPENING

IS 2 FEET BELOW ANY OF THE LISTED ITEMS.

7 TURNING VANES

24 X 12 S-l 8. CONTRACTOR SHALL SIZE REFRIGERANT PIPING AND PROVIDE NECESSARY

APPURTENANCES (TRAPS, DRYERS, ETC.) AS DIRECTED BY THE

EQUIPMENT MANUFACTURER FOR THE INDICATED INSTALLATION.

SIDEWALL SUPPLY GRILLE OR REGISTER WITH SIZE, TYPE, AND CFM700

SEISMIC DESIGN CATEGORY TABLE - DESIGN CATEGORIES D, E + F

SIDEWALL RETURN OR EXHAUST GRILLE OR REGISTER WITH SIZE,

TYPE, AND CFM

24 X 12 R-lCOMPONENT IMPORTANCE FACTOR (Ip) 700 9. WALL MOUNTED CONTROL DEVICES SHALL BE LOCATED IN THE ROOMS

INDICATED AND INSTALLED AT 54” ABOVE FINISHED FLOOR IN A LOCATION

THAT ALLOWS SIDE-REACH ACCESS FROM A WHEELCHAIR. IF THE

CONTROL DEVICE CANNOT BE MOUNTED TO ALLOW SIDE-REACH ACCESS

FROM A WHEELCHAIR, THEN THE FOLLOWING MOUNTING HEIGHTS SHALL

APPLY:

Ip = 1.0 Ip = 1.5

RESTRAINT

REQUIREMENTS mm*COMPONENT/SYSTEM

IDENTIFICATION

RESTRAINT

REQUIREMENTS

NOTES NOTES EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED

O O ROUND DUCTWORKFLOOR MOUNTED EQUIPMENT REQUIRED 1, 2 REQUIRED

4’—0” ABOVE FINISHED FLOOR; FRONT REACH FROM WHEEL CHAIR.

3’—8” ABOVE FINISHED FLOOR; REACH ACROSS COUNTERTOP.

A.£ CONTROLS AND SENSORSDUCTWORK 6 SQFT AND LARGER - REQUIRED 5 6 SQFT AND LARGER - REQUIRED 5, 6 B.

©COMPONENT CERTIFICATION (NOTE 7) NOT REQUIRED REQUIRED THERMOSTAT

10. ROUTE HVAC DRAIN LINES AS INDICATED. ROUTING SHALL NOT

INTERFERE WITH PASSAGEWAYS AND MAINTENANCE. DRAINS SHALL BE

TRAPPED. SLOPE CONDENSATE DRAIN PIPING AT 1/8” PER FOOT.

NOTES: HUMIDISTAT

1. EQUIPMENT 20 LBS OR LESS IS EXEMPT IF FLEXIBLE CONNECTIONS ARE PROVIDED BETWEEN THE COMPONENT AND ASSOCIATED DUCTWORK, PIPING, AND

CONDUIT.

2. EXEMPT IF ALL OF THE FOLLOWING APPLY:

- IF COMPONENT WEIGHS 400 LBS OR LESS.

- IF COMPONENT IS MOUNTED AT 4 FEET OR LESS ABOVE FINISHED FLOOR.

- HAS FLEXIBLE CONNECTIONS BETWEEN THE COMPONENT AND ASSOCIATED DUCTWORK, PIPING, AND CONDUIT.

3. FLEXIBLE CONNECTIONS REQUIRED FOR PIPE CONNECTIONS ONLY.

4. EXEMPT IF ONE OF THE FOLLOWING APPLY:

- IF PIPING IS INDIVIDUALLY SUPPORTED BY HANGERS AND EACH HANGER IN THE PIPING RUN IS 12” OR LESS IN LENGTH FROM THE TOP OF THE PIPE TO

THE SUPPORTING STRUCUTURE.

- WHERE PIPING IS SUPPORTED BY TRAPEZE HANGERS AND EACH HANGER IN THE PIPING RUN IS 12” OR LESS IN LENGTH FROM THE TOP OF THE PIPE TO

THE SUPPORTING STRUCUTURE AND THE TRAPEZE SUPPORTED PIPING ASSEMBLY WEIGHT IS LESS THAN 10 LB/FT.

NOTE: WHERE ROD HANGERS ARE USED, THEY SHALL BE EQUIPPED WITH SWIVELS, EYE NUTS, OR OTHER DEVICES TO PREVENT BENDING IN THE ROD.

5. EXEMPT IF ONE OF THE FOLLOWING APPLY:

- DUCTWORK IS SUPPORTED BY HANGERS AND EACH HANGER IN THE DUCT RUN IS 12” OR LESS IN LENGTH FROM THE DUCT SUPPORT POINT TO THE

SUPPORTING STRUCUTURE.

- WHERE MULTIPLE DUCTS ARE SUPPORTED BY TRAPEZE HANGERS AND EACH HANGER IN THE DUCT RUN IS 12” OR LESS IN LENGTH FROM THE DUCT

SUPPORT POINT TO THE SUPPORTING STRUCUTURE AND THE TOTAL WEIGHT SUPPORED BY THE TRAPEZE ASSEMBLY IS LESS THAN 10 LB/FT.

NOTE: WHERE ROD HANGERS ARE USED, THEY SHALL BE EQUIPPED WITH SWIVELS, EYE NUTS, OR OTHER DEVICES TO PREVENT BENDING IN THE ROD.

6. ALL DUCTWORK REGARDLESS OF SIZE DESIGNED TO CARRY HIGHLY TOXIC, EXPLOSIVE GASSES, OR USED AS PART OF A SMOKE CONTROL SYSTEM MUST BE

RESTRAINED.

C02 SPACE MOUNTED CARBON DIOXIDE SENSOR 11. PIPING AND DUCTWORK INSULATION SHALL BE RUN CONTINUOUSLY

THROUGH NON-RATED FLOORS, WALLS AND PARTITIONS UNLESS NOTED

OTHERWISE.CO

cd

I tH PROVIDE A MANUAL DAMPER AT EACH DUCT TAKE-OFF/RUNOUT TO

INDIVIDUAL AIR DISTRIBUTION DEVICES (SEE INSTALLATION DETAIL FOR

ADDITIONAL INFORMATION). AIR DISTRIBUTION DEVICES INSTALLED IN A

FLOOR WITHOUT ACCESS SHALL BE COMPLETELY HARD PIPED AND THE

MANUAL DAMPER SHALL BE CABLE OPERATED. ALL CABLE OPERATED

MANUAL DAMPERS SHALL BE ACCESSIBLE THOUGH THE FACE OF THE AIR

DISTRIBUTION DEVICE.

12.2 ABBREVIATIONSo

cd <t co o AFF/AFG ABOVE FINISHED FLOOR/GRADE FR FLOOR REGISTER I O

LAT LEAVING AIR TEMPERATUREAPD AIR PRESSURE DROPCD

r-> co co 13. PROVIDE UNION OR FLANGED CONNECTIONS AT EACH PIECE OF

EQUIPMENT AND ON BOTH SIDES ON CONTROL VALVES AND PRESSURE

REGULATING VALVES.

AUTOMATIC VALVES.

ARCHITECT/ARCHITECTURALCO OA OUTSIDE AIRARCHCM

Cd

PROVIDE SHUT-OFF VALVES ON BOTH SIDES OFCd RA RETURN AIRCFM CUBIC FEET PER MINUTE Li_

J SPEC SPECIFICATION 14. CORRECT SETTING ON BALANCING FITTINGS SHALL BE PERMANENTLY

MARKED.

1—

DB DRY BULB

o

SRG SIDEWALL RETURN GRILLEi DN DOWN 15. LOCATE AND SIZE EQUIPMENT PADS, CURBS, AND STANDS FOR

MECHANICAL EQUIPMENT IN ACCORDANCE WITH ACTUAL EQUIPMENT

PURCHASED.

O o o

TEMP TEMPERATURE< DWG DRAWINGO

o o

VFD VARIABLE FREQUENCY DRIVEoo GRADE MOUNTED EQUIPMENT SHALL BE LOCATED ON 6” THICK

CONCRETE PADS WITH CHAMFERED EDGES UNLESS NOTED OTHERWISE.

EAT ENTERING AIR TEMPERATURE 16.7. COMPONENT CERTIFICATION MUST BE SUPPLIED BY THE EQUIPMENT MANUFACTURER AT TIME OF SUBMITTAL FOR REVIEW BY ENGINEER OF RECORD.mm

WB WET BULBCO ELECTRICAL/ELECTRICELECo o Cd

(E) EXISTINGQ_

Cd

CM

CM DESIGNED:A/E FIRM

CABo*EXP EXPOSED DRAWING NO.SUB SHEET NO. TITLE OF SHEETOd %% 550% PRIME/ARCH: MECHANICAL

LEGEND AND GENERAL

NOTES

KSL*

% LORD, AECK &

SARGENT

ATLANTA, GA

175190FL FLOOR ■p.•‘<5y00 VJbIbClc i§ zo NEWCOMB & BOYD:

No >8 l M0.1KSLDocujgnedfiliQ. 32652 r \ / a Bp26WBp9(jp55435... .*

PMIS/PKG NO.

266617B m

FPM FEET PER MINUTE a TECH. REVIEW:

'"//HIHllt""

MEP&F ENGINEERING:

' ^2$ NEWCOMB &

BOYD

ATLANTA GA

SHEETO

CN RECONSTRUCTION ERA

NATIONAL HISTORICAL PARK

DATE:

7 MAY 2021 09 OF 16GO

O

PORCH

DN

D N

DN

DN

DN

DN

DN

PORCH

RAMP DN

PORCH

RAMP DNLANDING

Signed on 05/07/2021 using a Digital Signature

DocuSign Envelope ID: DD9D0D4F-61BC-458C-8C81-56EB3A74484D

KEY NOTES

<D DEMOLISH EXISTING FLOOR REGISTER AND PREP FLOOR OPENING FOR

NEW GRILLES. NO MODIFICATIONS TO OPENING SIZE ARE PERMITTED.

<2) DEMOLISH EXISTING FLOOR REGISTER AND ASSOCIATED PLENUM BOX.

PREP FLOOR OPENING FOR NEW GRILLES. NO MODIFICATIONS TO

OPENING SIZE ARE PERMITTED.

<3> DEMOLISH EXISTING SIDEWALL RETURN GRILLE AND PREP WALL OPENING

FOR NEW GRILLES. NO MODIFICATIONS TO OPENING SIZE ARE

PERMITTED.

GENERAL NOTES

1. DEMOLISH HVAC SYSTEM AND ASSOCIATED DUCTWORK, AIR

DISTRIBUTION DEVICES, AND CONTROLS IN THEIR ENTIRETY.

CONTRACTOR TO ASSUME OWNERSHIP OF DEMOLISHED MATERIALS

AND REMOVE FROM SITE.

2. EXISTING PROPANE TANK, ASSOCIATED GAS LINE AND GAS TRAIN

ASSEMBLY TO BE DEMOLISHED AND REMOVED FROM SITE.

SUBURBAN PROPANE TO RESUME OWNERSHIP OF TANK.

COORDINATE WITH SUBURBAN PROPANE FOR REMOVAL AND

RETURN.

y/////////////y // r i

// HVAC UNIT

LI------ n X

\ 3Q Q O o o

<2>(E)FR ^ 4 /

(E)FR<2> (E)FR <2> : (E)FR <2> I-/

o 1—I3 i c I5?

(E)FR {j>

%'a.o q ✓s MAIN HALL

V7. jhI / q

(E)FR <1>

o

CO

QSRG/Ts (TYPx8)W on I tH a.5 oon <t dCO m.O

/I O

1 1c P 101.mr- 4' (E)FR <D (E)FR <D<2>(E)FRCO

VCO

CO

CM n D3---------E I 3------------[on

L,on T T

<2>(E)FRLi_

J 1—

1O I o L J Q Q< O o o COmm

CO 4 0 4 8 12o

SCALE ®O

SCALE OF FEETQ_

cn CM FIRST FLOOR PLANCM DESIGNED:A/E FIRM DRAWING NO.1 SUB SHEET NO. TITLE OF SHEETon % 550\ PRIME/ARCH: MECHANICAL

DEMOLITION PLAN

KSLSCALE ®M1.0 %N LORD, AECK &

SARGENT

ATLANTA GA

175190■P,■S) s,y00 i'Jolo•Ac Clc i§ zo NEWCOMB & BOYD:

No >8 ft KSLDocu^nedfiliO^ 32652 r \ / a Bp26WBp9(jp55435...

PMIS/PKG NO.

266617B m

TECH. REVIEW:

%bnf

MEP&F ENGINEERING:

CM ' ^2$ NEWCOMB &

BOYD

ATLANTA GA

SHEETO 3**CM RECONSTRUCTION ERA

NATIONAL HISTORICAL PARK

DATE:

7 MAY 2021 10 OF 16CO

o

D N

DN

DN

DN

DN

DN

PORCH

RAMP DN

PORCH

RAMP DNLANDING

Signed on 05/07/2021 using a Digital Signature

DocuSign Envelope ID: DD9D0D4F-61BC-458C-8C81-56EB3A74484D

KEY NOTES

(D LCD DISPLAY COMBINATION THERMOSTAT/HUMIDISTAT TO BE MOUNTED

ON THE WALL IN COMPLIANCE WITH OTHER REQUIREMENTS DESCRIBED

IN THESE DOCUMENTS. COORDINATE WITH NATIONAL PARK SERVICE FOR

EXACT FINAL LOCATION.

<2> VERIFY MANUFACTURER RECOMMENDED CLEARANCES AND COORDINATE

WITH ARCHITECTURAL SCREENING.

<3> ROUTE RETURN DUCTWORK TIGHT TO STAGE STRUCTURE.

GENERAL NOTES

1. CONDENSATE PIPING FROM AHU-1 TO TERMINATE ON GRADE WITHIN

THE MECHANICAL ENCLOSURE. REFER TO DETAIL 3/M5.0 FOR

ADDITIONAL INFORMATION.

M1.1

UNIT CLEARANCES <2>I

r 6” CONCRETE PAD

AHU-1 ANNUAL SERVICE CONTRACT (BID OPTION B)

L 1. CONTRACTOR TO PROVIDE QUOTE FOR ANNUAL SERVICE CONTRACT

FOR AHU-1 TO ENSURE MANUFACTURER WARRANTY IS MAINTAINED.

r i fo J co

CM

Lr n

I 3Q Q O o o F = =lLBG-2 LBG-2 LBG-2 LBG-2 i-I675 675 675 675I I I I I I I Ib = d 2 oitzt Ftzt FtI I IhI I j!__h"hi—i

FH3 18X16 i i U- —CM

X rrh rt-c M"

CM

LlJ—1X ■ t"1CM I 100LBG-1 co

No:

CM h-h200

= =i *=6.

O

I h-h u

MAIN HALL

i DUCT SUPPORTRETURN

26X24 100 <3>h-h z

1=1 1 li frhzazzi AHU-1

24X24 V.LBG-1 I SRG jCO I100(7YP x8)cm h-h200 825i SUPPLYtH FRESH AIR

INTAKEcurl2

I BAROMETRIC

RELIEF----no h-hCm

I<t r"V CONCRETE PADd 18X16CO CONCRETE PADO —yy\

I Q

5T0R-^ii ic "FK-K 7P +A pi===i i i i i i i101CD LBG-2 LBG-2LBG-2r- I I

LCO 675 675675CO

CO

CM n n D □3---------E I 3------------[Cd

ELEVATION 12L, .Jcm T T

M1.1LBG-2 NOT TO SCALELi_

J 675£ 1—

1O I o L J Q Q< O o o COmm

CO 4 0 4 8 12o

SCALE ®O

ct SCALE OF FEETQ_

Cd

CM FIRST FLOOR PLANCM DESIGNED:A/E FIRMCABo* DRAWING NO.1 SUB SHEET NO. TITLE OF SHEETcm % 550% PRIME/ARCH: MECHANICAL

NEW WORK

PLAN

KSL*

SCALE ®M1.1 % LORD, AECK &

SARGENT

ATLANTA, GA.

175190••Q,y00 i'JoloClc i§ zo NEWCOMB & BOYD:

Nc 53 l KSLDocu^nedfiliO^ 32652 r \ / a Bp26WBp9(jp55435... .*

PMIS/PKG NO.

266617B m

S3a TECH. REVIEW:

%0Fif

MEP&F ENGINEERING:

CM ' ^2$ NEWCOMB &

BOYD

ATLANTA, GA.

SHEETO 3**CM RECONSTRUCTION ERA

NATIONAL HISTORICAL PARK

DATE:

7 MAY 2021 11 OF 1 6CO

EXISTING STRUCTURE

SHALL NOT BE MODIFIED.EXTERIOR

WALL

\DRAIN LINE SHALL BE AT LEAST THE

SAME SIZE AS THE NIPPLE ON THE

DRAIN PAN

SECURE TO EXTERIOR WALL

AND CAULK WATERTIGHT

VENT

CLEAN OUT \Lf777lFLOOR < UNIT DRAIN

CONNECTION

2” x 2” x 0125”

GALVANIZED ANGLES

EXTERIOR

DUCT WORK\ DUCT CD

o6” POURED CONCRETE PAD

WITH WWF 3X3 METAL GRID

IN TOP 1” OF CONCRETE

A BUNIT TYPE

j 1-INCH

PLUS X 1/2 ADRAW THRUNOTE 2.

AS REQUIREDEXTERIOR GRADE

1-INCH

MINIMUM

BLOW THRU YNOTES:

J1. PROVIDE FLEXIBLE CONNECTIONS AT THE SUPPLY AND RETURN DUCT CONNECTIONS TO THE UNIT. GRADE UNIT NEGATIVE STATIC PRESSURE

Y = 1/2” + UNIT TOTAL STATIC PRESSURE

X

NOTES:2. SECURE UNIT TO CONCRETE PAD WITH SEISMIC FASTENERS PER SEISMIC ENGINEER. NOTES:

DRAIN LINES SHALL SLOPE AT LEAST 1/8” PER FOOT CONTINUOUSLY.

LINES SHALL NOT BE ALLOWED TO RISE UP AGAIN.

1.3. LEVEL GRADE AT CONCRETE PAD LOCATION BEFORE POURING PAD.

LARGER THAN UNIT ON ON ALL SIDES.

CONCRETE PAD SHALL BE 6 1. WELD HORIZONTAL SUPPORTS TO VERTICAL ANGLES.

2. WELD VERTICAL SUPPORTS TO BASE PLATES.

4. DUCTWORK SHALL BE ENCASED IN A GALV. STEEL SHROUD WITH A STAMPED RIDGE ON THE TOP TO

PREVENT WATER ACCUMULATION. REFER TO ARCHITECTURAL FOR SHROUD SHAPE, PROFILE, AND

FINISH.

WHERE THE UNIT DRAIN LINE TERMINATES ON GRADE. PROVIDE AN AIR GAP

BETWEEN THE DRAIN LINE AND THE GROUND. THE AIR GAP SHALL BE A

MINIMUM OF TWICE THE DIAMETER OF THE UNIT DRAIN LINE.

2.

3. MECHANICALLY FASTEN DUCT TO VERTICAL ANGLES.

4. DUCT SUPPORTS SHALL BE MAXIMUM 8’ ON CENTER.

5. DETAIL IS GENERIC IN NATURE AND MAY NOT REFLECT INSTALLATION CONDITIONS IN THE FIELD. 5. PROVIDE CONCRETE PAD BELOW SUPPORT BASE PLATES.

GRADE DUCT SUPPORTS P-TRAP INSTALLATION DETAILPACKAGED AIR CONDITIONER INSTALLATION DETAIL 2 31

M6.0 M6.0M6.0 NO SCALE NO SCALENO SCALE

TURNING VANES

O

SEE FLOOR PLAN FOR

SPLIT DIMENSION

MAIN AIR AIR AIR

SUPPLY

DUCT -

FLOW FLOW FLOW

AIR EXISTING FLOOR OPENING

WITH NO MODIFICATIONS, TYP.FLOW FLOOR MOUNTED

LINEAR BAR GRILLE

MAIN

SUPPLY

DUCT- VOLUME DAMPERPROVIDE VOLUME

DAMPER WHEN

SHOWN ON FLOOR

PLANS

I FLOORING

REGSTERcmSQUARE ELBOW SHOWN.

PROVIDE ROUND ELBOW

WHEN SHOWN ON FLOOR

PLANS-------------------------- "

PLENUM ’BOOT’

WITH DUCT COLLAR

CO Ocd FLOOR JOIST< SUPPLY REGISTER TAKE-OFFi

PLAN VIEW€H

ro cd <t ATTACH DUCT

TO ’BOOT’ COLLAR

SUPPLY REGISTER

OR BRANCH DUCT

CO

o

AIR SPLIT DUCT TAKE-OFF AIRI

O PLAN VIEW FLOWiCD r-> x /

ZMAIN SUPPLY

DUCT

VOLUME DAMPER

NOTES:CO

CO

CO

cvj

V1. ALL VANED ELBOWS SHALL BE CONSTRUCTED AND

INSTALLED AS DETAILED BY SMACNA.

Cd NOTES:cmoCd

1/4 W OR

4” MIN.

1. PROVIDE 1 FIBERGLASS DUCT LINER IN THE PLENUM BOOT FOR SOUND ATTENUATIONLi_

J 2. DAMPERS SHALL HAVE HANDLE WITH INSULATION

STAND-OFF (WHERE REQUIRED) AND LOCKING

QUADRANT.

1—

O FLOOR MOUNTED AIR DISTRIBUTION DEVICE DETAILWl 53. PROVIDE DAMPERS WITH CONCEALED REGULATORS AND

ASSOCIATED PAINT-GRIP FINISH CAP FOR DAMPERS

INSTALLED ABOVE HARD CEILINGS.

O

M6.0BRANCH DUCT TAKE-OFFO NO SCALEO< PLAN VIEWO

o o

4. BRANCH DUCTWORK TAKE-OFF SHOWN ABOVE MAY BE

SUBSTITUTED FOR A MANUFACTURERED TAKE-OFF WHEN

USED FOR A SINGLE AIR DISTRIBUTION DEVICE.

COmm co o 5. OMIT MANUAL DAMPER IN BRANCH DUCTWORK TAKE

OFF WHEN TAKE-OFF IS DEDICATED TO A SINGLE

VARIABLE-AIR-VOLUME (VAV) TERMINAL UNIT.

o Cd Q_

Cd

CM

CM DESIGNED:A/E FIRMCABo* DRAWING NO.SUB SHEET NO. TITLE OF SHEETOd %% 550% PRIME/ARCH: MECHANICAL

DETAILS

KSL*

% LORD, AECK &

SARGENT

ATLANTA, GA

175190■P.•‘<5y00 VJbIbClDUCTWORK TAKE-OFF DETAILc i§4 zo NEWCOMB & BOYD:

No >8 ft M5.0KSLDocujgnedfiliQ. 32652 r ■. / a Bp26WBp9(jp55435...

PMIS/PKG NO.

266617B m

M6.0 aNO SCALE TECH. REVIEW:

%0Fif "••Htn mu""

MEP&F ENGINEERING:

' ^ NEWCOMB &

BOYD

ATLANTA, GA

SHEETO

cvj RECONSTRUCTION ERA

NATIONAL HISTORICAL PARK

DATE:

7 MAY 2021 12 of 16GO

SEQUENCE OF OPERATION: PACKAGED AIR CONDITIONING SYSTEM (AHU-1)

RUN CONDITIONS:

THE PACKAGED UNIT SHALL RUN PER THE UNIT’S ASSOICATED

OPERATING SCHEDULE, UNLESS SHUTDOWN ON SAFETIES/ALARMS.

PACKAGED AIR CONDITIONING UNIT SCHEDULE

1.

COOLING SECTION (NOTE 4)

COIL EAT *F COIL LAT ’F

G SECTION (NOTE 5)FAN HEATIN HOT GAS REHEAT

NO. AREA SERVED

(NOTE 1)

TYPE ESP, MOTOR MINIMUM NOTES

(NOTE 2)CFM RPM IN. WG. MINIMUMMAXIMUM

BRAKE

OA, MINIMUM CAPACITY EAT LAT CAPACITY, LAT

(NOTE 3) DB WB DB WBHP CFM EER kW *F *F MBH *FFILTER fMERV 8) STATUS:

THE CONTROLLER SHALL MONITOR FILTER STATUS. ALARMS SHALL BE PROVIDED

AS FOLLOWS: FILTER CHANGE REQUIRED - PROVIDE DIFFERENTIAL PRESSURE

SENSOR OR CHANGE FILTERS ON A SCHEDULE DETERMINED BY THE NATIONAL

PARK SERVICE.

2. HP

AHU-1 DARRAH HALL6600 940 FC-CV 0.8 10 4.68 965 77.9 63.7 54 52.5 11.0 45.0 62.7 85.0 115.6 70.0

NOTES:

1. DESIGN CONDITIONS:

SUMMER

95.8‘F DB, 78.2*F WB

WINTER3. SYSTEM START-UP:

THE SYSTEM SHALL BE AUTOMATICALLY STARTED AND STOPPED WHENEVER THERE

IS A CALL FOR HEATING AND COOLING AS NOTED BELOW.

OUTSIDE 27* F

REMAINING SPACES 75*F DB, 50% RH 70* F

2. FAN TYPE:

FORWARD-CURVED

AIRFOIL

3. EXTERNAL STATIC PRESSURE DOES NOT INCLUDE UNIT CASING, UNIT-MOUNTED COOLING AND HEAT SECTION, UNIT-MOUNTED DAMPERS, OR FILTERS.

4. UNITS SHALL START AND OPERATE DOWN TO 0*F.

5. PROVIDE ELECTRIC HEATER WITH SCR CONTROL.

6. SERVICE: 208 V, 3 - PHASE, 60 Hz.

7. PROVIDE WITH DUCT MOUNTED SMOKE DETECTORS DOWNSTREAM OF FILTERS IN SUPPLY AND RETURN DUCTWORK.

8. PROVIDE WITH INTEGRAL CONVENIENCE OUTLET.

FC CV CONSTANT VOLUME

W VARIABLE VOLUME4. SUPPLY AIR TEMPERATURE CONTROL:

THE SYSTEM SHALL BE IN OCCUPIED OR UNOCCUPIED MODE AS SCHEDULED VIA

THE CONTROLLER.

AF

CAPACITY IS BASED ON 95*F CONDENSER EAT.FAN CONTROL: THE SUPPLY FAN SHALL CYCLE ON AND OFF IN CONJUNCTION

WITH A CALL FOR COOLING, HEATING, DEHUMIDIFICATION, OR VENTILATION AS

NOTED BELOW.

THE HEATING AND COOLING OCCUPIED SETPOINTS SHALL BE 68*F AND 75*F

(ADJ). UPON AN INCREASE IN ZONE TEMPERATURE ABOVE THE COOLING

SETPOINT, THE CONTROLLER SHALL ENERGIZE THE UNIT IN COOLING MODE UNTIL

THE SETPOINT IS SATISFIED. UPON A DECREASE IN ZONE TEMPERATURE BELOW

THE HEATING SETPOINT, THE CONTROLLER SHALL ENERGIZE THE ELECTRIC HEAT

UNTIL SETPOINT IS SATISFIED.

AIR DISTRIBUTION SCHEDULE

TYPE/DESCRIPTIONNO. NECK SIZE FACE SIZE MOUNTING TYPE

5. DEHUMIDIFICATION MODE:

THE SPACE RELATIVE HUMIDITY SETPOINT SHALL BE 50% (ADJ). UPON A RISE IN

HUMIDITY ABOVE THE SETPOINT, AS SENSED BY THE ZONE MOUNTED HUMIDISTAT,

THE CONTROLLER SHALL ENERGIZE THE COOLING COIL AND HOT GAS REHEAT

COIL TO DELIVER ROOM NEUTRAL 70*F (ADJ) DEHUMIDIFIED AIR UNTIL THE

SETPOINT IS SATISFIED.

LBG-1 10X6 12X8 FLOOR SUPPLY - LINEAR BAR GRILLE

LBG-2 30X6 32X8 FLOOR SUPPLY - LINEAR BAR GRILLE

SRG 30X10 32X12 SIDEWALL RETURN - LOUVERED SINGLE DEFLECTION

NOTES:

1. REFER TO MECHANICAL SPECIFICATIONS FOR REQUIREMENTS.

2. ALL SUPPLY AND RETURN GRILLES SHALL FIT WITHIN EXISTING OPENINGS WITHOUT MODIFICATION TO OPENING OR

SURROUNDING BUILDING MATERIALS. NOTIFY CONTRACTING OFFICER IN CASE OF CONFLICT.

6. DEMAND CONTROL VENTILATION:

DURING OCCUPIED MODE, IF THE SPACE CARBON DIOXIDE (C02) CONCENTRATION

IS ABOVE 1000 PPM FOR 5 MINUTES (ADJ) AS SENSED BY THE SPACE

MOUNTED C02 SENSOR THE OUTDOOR AIR DAMPER SHALL OPEN (POSITION

ESTABLISHED DURING TESTING AND BALANCING) TO DELIVER THE SCHEDULED

AMOUNT OF OUTDOOR AIR UNTIL THE SPACE C02 CONCENTRATION DROPS BELOW

800 PPM (ADJ) FOR 20 MINUTES (ADJ). IF THE SPACE C02 LEVELS ARE ABOVE

1000 PPM FOR LONGER THAN 1 HOUR (ADJ), INITIATE AN ALARM THROUGH THE

CONTROLLER.

O

7. ECONOMIZER MODE:

INITIATE ECONOMIZER OPERATION ON A DROP IN OUTSIDE AIR DRY BULB

TEMPERATURE BELOW 68*F FOR 15 MINUTES (ADJ). DURING ECONOMIZER

OPERATION, MODULATE THE MAXIMUM OUTSIDE AIR DAMPER TO MAINTAIN A MIXED

AIR TEMPERATURE EQUAL TO 2*F LESS THAN DISCHARGE TEMPERATURE SETPOINT.

TERMINATE ECONOMIZER OPERATION WHEN OUTSIDE AIR DRY BULB TEMPERATURE

EXCEEDS 70*F FOR 10 MINUTES (ADJ).

8. SMOKE DETECTION:

SMOKE DETECTORS IN THE SUPPLY AND RETURN DUCTS DOWNSTREAM OF THE

FILTERS SHALL AUTOMATICALLY SHUT DOWN THE FAN.

CO

cm

I tH

O Cm <t

CO

o o

CD

r-> coco co

CM

Cd

Cd

Li_

J 1—

O I o o o<o o o COmm co o o Cd Q_

Cd

CM

CM DESIGNED:A/E FIRM

CABO:

'c?V8“l<a‘fc& DRAWING NO.SUB SHEET NO. TITLE OF SHEETcm %% 550% PRIME/ARCH: MECHANICAL

SCHEDULES AND

CONTROLS

KSL*

% LORD, AECK &

SARGENT

ATLANTA, GA.

175190■P.•‘<5y00 VJbIbClc i§ zo NEWCOMB & BOYD:

No >8 h M6.0KSLDocujgnedfiliQ. 32652 PMIS/PKG NO.

266617B m aSac?. TECH. REVIEW:

'"//Millin'"

MEP&F ENGINEERING:

P 26*0*9^355435...cm

■ ^ NEWCOMB &

BOYD

ATLANTA, GA.

SHEETO

CM RECONSTRUCTION ERA

NATIONAL HISTORICAL PARK

DATE:

7 MAY 2021 13 of 16CO

D N

DN

DN

DN

DN

DN

PORCH

RAMP DN

PORCH

RAMP DNLANDING

Signed on 05/07/2021 using a Digital Signature.

DocuSign Envelope ID: 58F7F59B-361B-476F-99FF-35BE778A406C

ELECTRICAL DEMOLITION LEGEND KEY NOTES

EXISTING PANELBOARD (T) EXISTING PANELBOARD AND FEEDER RACEWAY TO BE

DEMOLISHED. DISCONNECT EXISTING RACEWAY FOR POWER AND

LIGHTING DEVICES TO BE RECONNECTED TO NEW PANELBOARD,

SEE ELECTRICAL NEW WORK E1.0.

V / / A

EXISTING DISCONNECT,

HD EXISTING UTILITY METER

(2) DISCONNECT AND REMOVE HVAC UNIT ELECTRICAL

CONNECTION, REMOVE CONDUIT AND WIRE FROM UNIT TO

EXISTING PANELBOARD.

EXISTING CONDUIT, UNDER BUILDNG, IN CRAWL SPACE

GENERAL NOTES

1. ELECTRICAL DEVICES AND LIGHTING FIXTURES NOT INDICATED ON

THIS PLAN SHALL REMAIN. INCLUDING WIRE AND RACEWAY.

HVAC UNIT

Q n o o uo y o I—I5 □

□ oo

□ □c s MAIN HALL c □□ a□ co cm

I tH a □[o cm <t tco

CD

STOR1 1£ A pEXISTING SERVICE METERQ

101CD

r-> m\co \CO

CO

CM n o o 0]-----------[ 3---------ECd

Cd

J

1O I o Q O<o o o 00mm

CO 4 0 4 8 12o

SCALE ®O

cl: SCALE OF FEETQ_

Cd

CM ELECTRICAL DEMOLITION - FIRST FLOOR PLANCM DESIGNEDA/E FIRM DRAWING NO1 SUB SHEET NO TITLE OF SHEETcm

"W%

550PRIME/ARCH:'U ELECTRICAL

DEMOLITION FLOOR PLAN

DZSSCALE ®E0.5 ^\\\£<sr LORD, AECK &

SARGENT

ATLANTA, GA.

175190Ot,yc 00 orcd w a E0.5DZSNEWCOMB & BOYD:

Nc 53 ft

Z< PMIS/PKG NO

266617B

DoJSignN®*, 32761 m*•o HI ** TECH. REVIEW:o MEP&F ENGINEERING:

\■E^57gB^E52F447 ft-mCM

<0 HDCNEWCOMB &

BOYD

ATLANTA, GA.

SHEETo

''•iimiui*1**

CM RECONSTRUCTION ERA

NATIONAL HISTORICAL PARK

DATE: 14 of 16CO

7 MAY 2021O

D N

DN

DN

DN

DN

DN

PORCH

RAMP DN

PORCH

RAMP DNLANDING

Signed on 05/07/2021 using a Digital Signature.

DocuSign Envelope ID: 58F7F59B-361B-476F-99FF-35BE778A406C

NEW WORK LEGEND KEY NOTES:

(T) CONNECT EXISTING POWER AND LIGHTING RACEWAYS INDICATED

ON SHEET E0.5 TO PANEL ’DH’.

(2) PROVIDE (1) 208V/3P NON FUSED 200A DISCONNECT RATED

NEMA 4X FOR AHU-1. PROVIDE (3) #2/0 & (1) #6G IN 2”C

IN CRAWL SPACE, CONDUIT SHALL NOT BE VISIBLE FROM

OUTSIDE OF CRAWL SPACE.

(3) PROVIDE UNDERGROUND PRIMARY CONDUCTORS FROM POLE

MOUNTED TRANSFORMER TO PANELBOARD ’DHL COORDINATE

WITH UTILITY COMPANY FOR METER INSTALLATION. USE

EXISTING UNDERGROUND CONDUIT ROUTE IF APPLICABLE.

PANELBOARD, SURFACE MOUNTED.

ELECTRICAL DISCONNECT, MOUNTED TO BUILDING.HD

UTILITY METEREl

WP

DUPLEX, 20A/1P RATED, GFCI, IN WEATHERPROOF

ENCLOSURE. MOUNTED TO BUILDING.

GENERAL NOTES:

1. SEE SHEET E2.0 FOR PANEL SCHEDULE INFORMATION.

HVAC UNIT

LT

PANEL LOCATION (BID OPTION A)1Q O O on

1. IN LIEU OF EXTERIOR LOCATION INDICATED, INSTALL ALTERNATE

PANEL ’DH’ (NEMA 1 IN LIEU OF NEMA 4X) AT ALTERNATE INTERIOR

LOCATION SHOWN. INTERIOR PANEL OPTION TO BE RECESSED IN

EXISTING EXTERIOR WALL CAVITY, IN APPROXIMATE LOCATION SHOWN.

PROVIDE EXTERIOR RATED PULL BOX AT EXISTING PANELBOARD ’DH’

AND INTERCEPT, EXTEND, AND SPLICE AS NECESSARY ALL EXISTING

CONDUCTORS AND RACEWAYS FOR BUILDING UP TO NEW LOCATION

OF NEW PANEL ’DH’.

J O i 1—13 □c

□O

□c s MAIN HALL c □ cocm I tHa □ocm <t 3 ALTERNATE PANEL LOCATION

(BID OPTION A)

\COo

STOR.2 po

D>I dV

101CDr-> coco co CM u n D3----------E I 3------------[Cd

Cd

J

1O I o Q Q< O o o 00mm

CO 4 0 4 8 12o SCALE ®O Cd SCALE OF FEETQ_

Cd

CM

ELECTRICAL 1ST FLOOR NEW WORK PLANCM DESIGNED:A/E FIRM DRAWING NO.1 SUB SHEET NO. TITLE OF SHEETcm

CA*0O:„

/ NEWCOMB & BOYD \

: NO.C00268

% 550PRIME/ARCH: ELECTRICAL

NEW WORK PLAN

DZSSCALE ®E1.0

LORD, AECK &

SARGENT

ATLANTA, GA

175190&< <&/o E1.0DZSZ< PMIS/PKG NO.

266617B

S-DoifiignN^: 32761 5 ‘,S?

f ;

m*; nr

TECH. REVIEW:MEP&F ENGINEERING:

CM

HDCNEWCOMB &

BOYD

ATLANTA, GA

SHEETo

CN RECONSTRUCTION ERA

NATIONAL HISTORICAL PARK

DATE:

7 MAY 2021 15 of 16CO

FEEDER SIZE SCHEDULE

FEEDER

MARK

COPPER CONDUCTORS AND CONDUIT SIZE

4 #4/0 AND 1 #2 G ~ 2.5" C225X

225X

Signed on 05/07/2021 using a Digital Signature.

DocuSign Envelope ID: 58F7F59B-361B-476F-99FF-35BE778A406C

GENERAL RISER NOTES:

1. REMOVE FEEDER BACK TO POLE MOUNTED TRANSFORMER.

2. CONTRACTOR TO INSPECT EXISTING UNDERGROUND CONDUIT, IF

UNDERGROUND CONDUIT IS SUITABLE FOR NEW CONDUCTORS

CONTRACTOR SHALL RE-USE CONDUIT. IF UNDERGROUND CONDUIT IS

NOT RE-USABLE. PROVIDE NEW RACEWAY AS INDICATED IN FEEDER

SIZE SCHEDULE.

EXISTING POLE MOUNTED TRANSFORMER

m

3. PROVIDE LINE ITEM PRICING FOR ITEMS LISTED BELOW:

3.1. DEMO EXISTING FEEDER.

3.2. DEMO EXISTING UNDERGROUND CONDUIT.

3.3. TRENCH NEW CONDUIT PER FEEDER SIZE SCHEDULE.

3.4. INSTALL NEW FEEDER PER FEEDER SIZE SCHEDULE.

4. EXISTING POLE MOUNTED TRANSFORMER IS APPROXIMATELY 200 FEET

FROM EXISTING METER LOCATION, CONTRACTOR TO VERIFY.

PANEL

DH

METER O

ELECTRICAL RISER DIAGRAM1

E3.0

PANELBOARD ”DH” SCHEDULEo

£ VOLTAGE: 208Y/120V

PHASE: 3

WIRE: 4

AIC: 10.000

BUS: 225 A

MAIN: 250A/3P MCB

SECTION: 1 OF 1

MOUNTING: SURFACE

LOCATION: EXTERIOR

LOAD DESCRIPTION kVA CB CKT A B C CKT CB kVA DESCRIPTION LOAD

20/2 2__ *175/3 18.7EXISTING 1 18.69 AHU-1 HVAC

3 18.69 4 *___ 18.7 HVAC

30/2EXISTING 5 18.69 6 *___ 18.7 HVAC

7 8 15 EXISTING

EXISTING 15 9 10 20 EXISTING

CO EXISTING 20 11 12 20 EXISTINGcm

EXISTING 20 13 14 20 EXISTINGi €H

EXISTING 20 15 16 20 EXISTING2

EXISTING 20 17 18 20 EXISTINGo EXISTING 20 19 20 20 SPARECm

<t

SPARE 20 21 22 20 SPARECO

o

SPARE 20 23 24 20 SPARE

O

SPACE 20 25 26 20 SPACE

SPACE 20 27 28 20 SPACECD

r-> SPACE 20 29 30 20 SPACE

CO

PHASE TOTALS 18.69 18.69 18.69CO

CO

cvj CONNECTED AMPERES

DEMAND AMPERES

156 CONNECTED kVA:

DEMAND kVA:

56Cd

156 56Cm

* PROVIDE SUB-FEED BREAKER.Li_

J NOTES:

1. PROVIDE FULLY RATED BREAKER AIC AND BUS BRACING RMS SYMMETRICAL.

2. CIRCUITS LABELED EXISTING SHALL BE TRACED AND PROPERLY LABELED IN PANEL SCHEDULE.

3. PANELBOARD NEMA RATING: 4X.

4. KEY ENTRY DOOR ACCESS.

1—

O I o o o<o o o COmm

CO 4 0 4 8 12o

SCALE ®

O Cd SCALE OF FEETQ_

CH

CM

CM DESIGNED:A/E FIRM DRAWING NO.SUB SHEET NO.

/c&&frss'Ote/'k

* jjf S-DoliSignN^: 32761 5 *o

\ .’Or ---- tjf57gB^E52F447... <(/

''"mi mi*1*’

TITLE OF SHEETcm

VJ.--feA 550PRIME/ARCH: ELECTRICAL SCHEDULESDZS^\\\£<sr Ai * LORD, AECK &

SARGENT

ATLANTA, GA

175190,yc 00 <2'.o E3.0DZSNEWCOMB & BOYD:

Nc 53 l

Z< PMIS/PKG NO.

266617B m* nr

TECH. REVIEW:oa MEP&F ENGINEERING:

...#4PCH

HDCNEWCOMB &

BOYD

ATLANTA GA

SHEETO

CN RECONSTRUCTION ERA

NATIONAL HISTORICAL PARK

DATE:

7 MAY 2021 16 of 16GO

210507_REER_Arch_For Construction
COVER-COVER
PLOT
A1.1_FIRSTFLPL_DEMO-A1.1
PLOT
A1.2_FIRSTFLPL-A1.2
PLOT
A2.1_FIRSTCLPL-A2.1
PLOT
A3.1_ELEV-A3.1
PLOT
A3.2_SECT-A3.2
PLOT
A4.1_ENLARGEDELEV-A4.1
PLOT
A5.1_DTLS-A5.1
PLOT
MEP_For Const-Combined
M0.1-MECHANICAL_LEGEND_AND_GENERAL_NOTES
M1.0-MECHANICAL_DEMOLITION_PLAN
M1.1-MECHANICAL_NEW_WORK_PLAN
M5.0-MECHANICAL_DETAILS
M6.0-MECHANICAL_SCHEDULES_&_CONTROLS
E0.5-ELECTRICAL_DEMOLITION_PLAN
E1.0-ELECTRICAL_NEW_WORK_PLAN
E3.0-ELECTRICAL_SCHEDULES

File details come from the government source that posted it. Updated .