This document outlines specifications for a cast-in-place concrete project for the Calf Creek Recreation Area Redevelopment. It details concrete mixture designs and material requirements for various building elements including footings, foundation walls, and slabs-on-grade. It also provides instructions for formwork, reinforcement, embedded items, concrete mixing and placing, joints, curing, repairs if needed, and quality testing. Submittals are due from contractors addressing design mixtures, steel shop drawings, formwork drawings, and construction joint layout. The project will be constructed under a single prime contract through the Bureau of Land Management Utah Region, with a pre-solicitation number of 140L5724R0001 and an expected award date not provided.

View the file

Other files for this federal contract opportunity

Other files attached to Calf Creek Recreation Area Redevelopment, newest first.
File Type Posted
PreSolicitationNotice140L5724R0001_1.pdf PDF
DRAFT_Plans_-_Calf_Creek_Rec_Redevelopment_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior

Bureau of Land Management

Calf Creek Recreation Area Redevelopment

Escalante, Utah

January 2023

DRAFT

JANUARY 2018 TABLE OF CONTENTS

CALF CREEK RECREATION AREA REDEVELOPMENT 1

TABLE OF CONTENTS

SPECIFICATIONS ........................................................................................................................... # OF PAGES

DIVISION 01 - GENERAL REQUIREMENTS

011000 SUMMARY

011019 Government Finished Property VALUES

012000 UNIT PRICES AND SCHEDULE OF VALUES

013100 PROJECT MANAGEMENT AND COORDINATION

014000 QUALITY REQUIREMENTS

016000 PRODUCT REQUIREMENTS

017000 EXECUTION REQUIREMENTS

017700 CLOSEOUT PROCEDURES

017820 MAINTENANCE DATA

DIVISION 02 - (NOT USED)

DIVISION 03 - CONCRETE

033000 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

047200 NATIVE STONE MASONRY

DIVISION 05 - METALS

054000 COLD-FORMED METAL FRAMING

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

061062 REINFORCED COMPOSITE PLASTIC LUMBER

061070 PRESSURE TREATED WOOD

DIVISION 07 - 30 (NOT USED)

DIVISION 31 - EARTHWORK

311000 SITE CLEARING

312000 EARTH MOVING

DIVISION 32 – (NOT USED)

DIVISION 33 - (NOT USED)

END OF TABLE OF CONTENTS

JANUARY 2023 SUMMARY

CALF CREEK RECREATION AREA REDEVELOPMENT 011000-1

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Project Information.

2. Work covered by the Contract Documents

3. Use of premises.

4. Site Conditions.

1.2 PROJECT INFORMATION

A. Project Identification: Calf Creek Recreation Area Redevelopment

1. Project Location: Calf Creek Recreation Area, located in Grand Staircase-Escalante National Monument between Escalante and Boulder, Utah just off State Route 12.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work consists of the following:

1. The Work includes a full suite of repairs and upgrades including, but not limited to, the following:

a. Reconstruct all campsites to improve accessibility and reduce erosion

b. Incorporate picnic tables, fire rings, tent pads as shown

c. Remove old concrete pad near campsites 1 and 2

d. Construct two camp sites and two walk-in tent camping area.

e. Construct/Install three small shade shelters and one large shelter.

f. Replace all wood components on the pedestrian suspension bridge.

g. Remove block retaining wall and construct new retaining structures and access to the water play area

h. Construct accessible paths as shown throughout the site and demolish the existing tables with concrete pads.

B. Project will be constructed under a single prime contract.

1.4 USE OF PREMISES

A. Contractor shall have limited use of premises for construction operations as indicated on Drawings by the Contract limits.

CALF CREEK RECREATION AREA REDEVELOPMENT 011000-2

B. Schedule operations so that Work is conducted during regular office hours which are 7:00 am to 6:00 pm Monday through Friday, no work on national holidays or weekends without written approval from the Contracting Officer. Allow 48 hour notice prior to proceeding.

C. Schedule and sequence operations necessary to complete the work, including coordination with other crafts relative to the Contractor's requirements. Schedule Work in such manner as to avoid delays in overall construction and permit proper installation of work.

D. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Allow for Government occupancy of area facilities by Government or other authorized personnel. Conduct work in a manner that will minimize needs for disruption of other Government activities. Provide minimum 72 hours advance notice to Contracting Officer of activities that will impact other Government operations.

2. Parking Lot: Keep parking and access to trail available as much as possible when it safe for the public.

E. Utilities: Service interruptions will be allowed for short periods of time per schedule approved by Contracting Officer.

1.5 SPECIFICATION FORMATS AND CONVENTIONS

A. Specification Format: The Specifications are organized into Divisions and Sections using the 33-division format and CSI/CSC's "MasterFormat" numbering system.

1. Division 1: Sections in Division 1 govern the execution of the Work of all Sections in the Specifications.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

PART 4 - Site Conditions

4.1 Equipment USE:

A. Prior to entering the project area, all equipment and machinery will be cleaned for petroleum accumulations, dirt, plant material. All equipment and machinery leaks will be repaired prior to entering site. Such equipment includes large machinery, stationary power equipment (such as generators), and gas-powered equipment with tanks larger than 5 gallons

B. Heavy equipment use will be avoided during wet, muddy conditions to reduce the compaction of soils.

CALF CREEK RECREATION AREA REDEVELOPMENT 011000-3

C. During construction, spill containment berms will be used in all locations where equipment refueling occurs. On-site absorbent pads and booms (long enough to extend across Calf Creek) will be available should a spill occur. The above serve to prevent the potential for hazardous petroleum-based materials to contaminate Calf Creek.

D. To the extent feasible, heavy equipment work along the creek will be from the top of the bank, unless work from another location (instream) would result in less habitat disturbance, less floodplain disturbance, or better meet project design criteria. Operating heavy equipment in streams would only occur when project specialists believe that such actions are the only reasonable alternative for implementation or would result in less sediment in the stream channel or damage (short- or long-term) to the overall aquatic and riparian ecosystem relative to other alternative methods.

4.2 Fisheries/Aquatics

A. Any instream work or periods of prolonged equipment in the stream channel will not occur during spawning season of brown trout (October-December) and cutthroat (spring when stream levels begin to rise) unless first cleared by a qualified biologist. If work needs to occur during spawning timeframes, other mitigation features such as block nets and fish removal from the construction area will be used.

4.3 Health and Human Safety

A. Hazard trees would be trimmed or removed as warranted.

B. Signs to warn of hazards will be installed as necessary.

C. The public will be allowed to use the site or portions of the site when mixing vehicular and pedestrian traffic with maintenance activities does not pose immediate safety concerns. When it is not safe, the site will be closed in whole or in part to the public for overnight and day use, including hiking Lower Calf Creek Falls Trail.

4.4 Paleontology

A. A qualified paleontologist will be on site to monitor construction activities during any bedrock disturbance, particularly at the proposed overflow parking area and any place along the proposed bypass-trail. If fossils are encountered during construction, the resource must either be avoided or collected, depending on the threat to the resource and the practicality of avoidance for construction.

4.5 Soils

A. Storm drainage, erosion, and sediment control structures (swales, riprap, curbs, straw mats, vegetation, etc.) will be used to control erosion and sedimentation during and after construction.

CALF CREEK RECREATION AREA REDEVELOPMENT 011000-4

4.6 Vegetation

A. Where practical, native plants that need to be removed during construction will be saved and replanted in areas where revegetation is needed.

4.7 Water Resources/Hydrologic Conditions

A. A Utah Division of Water Quality Stormwater Pollution Prevention Plan will be prepared prior to project construction to protect Calf Creek during and after construction.

B. A US Army Corp of Engineers/Utah Division of Water Rights Steam Channel Alteration Permit will be acquired prior to replacement of the culvert, low water crossing, and retaining walls by the creek.

C. Storm drainage from parking areas, roads, and facilities will be managed through engineering (slope, riprap, curbs, etc.) and by using sediment control structures (swales, straw mats, vegetation, etc.) to reduce the potential of contaminants entering Calf Creek during and after construction.

4.8 Wildlife

A. To minimize potential impacts to the ongoing hummingbird monitoring study, the banding location would be shifted away from the main toilet building and lower day-use area access route to an area across (southwest of) the existing lodgepole fence where no construction is proposed. On the hummingbird banding days, construction activities would not occur within immediate proximity to where hummingbirds are actively fed, captured, and processed, during the banding season (May 1 to September 30).

END OF SECTION 011000 DRAFT

JANUARY 2023 GOVERNMENT FURNISHED PROPERTY

CALF CREEK RECREATION AREA REDEVELOPMENT 011019‐1

SECTION 011019 – GOVERNMENT FURNISHED PROPERTY

PART 1 - GENERAL

1.1 SUMMARY:

A. Section Includes: Materials and products to be furnished by the Government and shall be installed by Contractor and the material/product locations.

1.2 DELIVERY, STORAGE, AND HANDLING:

A. Location: The Government furnished property will be provided by the Bureau of Land

Management at the Grand Staircase Escalante Field Station at 775 West Main Street. Escalante, UT 84726.

B. Time: Property will be available Monday through Friday, 8:00 AM to 4:30 PM except on holidays.

C. Return of Unused Property: Return unused material to the Grand Staircase Escalante Field

Station at 775 West Main Street. Escalante, UT 84726.

D. Loading, Offloading and Transporting Property: The Contractor shall be responsible for providing the necessary material-handling equipment to load and offload materials. The Contractor shall load and transport materials to work sites. Special loading & unloading requirements may be required when handling concrete products. Obtain manufactures recommendations prior to handling any materials. Any material lost or damaged while loading, offloading, or transporting will be replaced by the Contactor at the Contractor’s expense.

PART 2 - PRODUCTS

2.1 MATERIALS:

A. Materials to be furnished by the Government:

Specification Materials Estimated Section Description Quantity Unit

011019 Group Pavilion 1 each 011019 Shade Structure 6 each

END OF SECTION

JANUARY 2023 UNIT PRICES AND SCHEDULE OF VALUES

CALF CREEK RECREATION AREA REDEVELOPMENT 012000-1

SECTION 012000 UNIT PRICES AND SCHEDULE OF VALUES

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for unit prices and requirements to prepare schedule of values.

1.2 DEFINITIONS

A. Unit price is a price per unit of measurement for materials or services added to or deducted from the Contract Sum by appropriate modification, if estimated quantities of Work required by the Contract Documents are increased or decreased.

1.3 PROCEDURES

A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.

B. Government reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Government expense, by an independent surveyor acceptable to Contractor.

1.4 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the Schedule of Values with preparation of Contractor's Construction Schedule.

1. Correlate line items in the Schedule of Values with other required administrative forms and schedules, including Application for Payment and Contractor's Construction Schedule.

2. Submit the Schedule of Values to Contracting Officer at earliest possible date but no later than ten calendar days after the Notice to Proceed.

B. Format and Content: Use the Project Manual table of contents as a guide to establish line items for the Schedule of Values. Provide at least one line item for each Specification Section.

1. Identification: Include the following Project identification on the Schedule of Values:

a. Project name and location.

b. Name of Contracting Officer.

c. Contractor's name and address.

d. Date of submittal.

CALF CREEK RECREATION AREA REDEVELOPMENT 012000-2

2. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the Project Manual table of contents. Provide several line items for principal subcontract amounts, where appropriate. Include separate line items under required principal subcontracts for maintenance manuals, punch list activities, Project Record Documents, and demonstration and training in the amount of 5 percent of the Contract Sum.

3. Round amounts to nearest whole dollar; total shall equal the Contract Sum.

4. Provide a separate line item in the Schedule of Values for each part of the Work where

Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed.

5. Provide separate line items in the Schedule of Values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work.

6. Each item in the Schedule of Values and Applications for Payment shall be complete.

Include total cost and proportionate share of general overhead and profit for each item.

a. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the Schedule of Values or distributed as general overhead expense, at Contractor's option.

7. Schedule Updating: Update and resubmit the Schedule of Values before the next Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LUMP SUM PAYMENT ITEMS

A. Payment items for the work of this Contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below.

B. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved.

C. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

D. Mobilization and Demobilization: Preparatory work and operations, including movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations that must be performed or costs incurred prior to beginning work on the various items on the project site.

CALF CREEK RECREATION AREA REDEVELOPMENT 012000-3

1. Payment: Payment will be made for costs associated with mobilization and demobilization, as defined in Special Clause PAYMENT FOR MOBILIZATION AND DEMOBILIZATION. Include consideration for moves between project sites. Prices and payment will be full compensation for the work described in this section. Progress payments will be made as follows:

a. When 5 percent of the original Contract amount is earned from other bid items, 50 percent of the amount bid for mobilization or 5 percent of the original Contract amount, whichever is lesser, will be paid.

b. When 10 percent of the original Contract amount is earned from other bid items, 100 percent of the amount bid for mobilization or 10 percent of the original Contract amount, whichever is lesser, will be paid.

c. Upon completion of work for the project, payment of the amount bid for mobilization in excess of 10 percent of the original Contract amount, will be paid.

d. The total sum of all payments shall not exceed the original Contract amount bid for mobilization, regardless whether Contractor may have shut down the work on the project or moved equipment away from the project and then back again.

2. Unit of Measure: Lump sum.

E. Demolition:

1. Payment: Payment will be made for costs associated with operations necessary for demolition.

2. Unit of Measure: Lump sum.

F. Site Excavation and Structural Fill:

1. Payment: Payment will be made for costs associated with operations necessary for the site excavation and structural fill.

2. Unit of Measure: Lump sum.

G. Site Work:

1. Payment: Payment will be made for costs associated with operations necessary for construction of the remaining site work not listed above.

2. Unit of Measure: Lump sum.

H. Site Structures:

1. Payment: Payment will be made for costs associated with operations necessary for construction of the site structures.

2. Unit of Measure: Lump sum.

3.2 LIST OF UNIT PRICES

A. Unit Price No. 01 – Structural Fill:

1. Description: Structural Fill

CALF CREEK RECREATION AREA REDEVELOPMENT 012000-4

2. Unit of Measurement: Cubic Yard.

B. Unit Price No. 02 - Concrete:

1. Description: Concrete

2. Unit of Measurement: Cubic Yard.

3.3 SUMMARY OF BID ITEMS

A. The intent of the following paragraphs is to explain, in general, what is and what is not included in a bid item, and the limits or cut-off points where one bid item ends and another begins. If no bid item exists for a portion of the work, include the costs in a related bid item.

A. BID ITEM 1 - MOBILIZATION AND CONSTRUCTION MANAGEMENT: This item includes all preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; bonds, work layout ; other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site. Construction management includes ongoing tasks such as environmental controls and field office operations. It will be paid for as a lump sum.

B. BID ITEM 2 - SITE EXCAVATION AND STRUCTURAL FILL: This item includes all work related to the excavation and fill required to prepare the site for construction. It will be paid for as a lump sum.

C. BID ITEM 3 - SITE WORK: This item includes all earthwork, grading, embankment, drainage, aggregate base, walks, slabs and related work as shown and specified for the site. It will be paid for as a lump sum.

D. BID ITEM 4 – SITE STRUCTURES: This item includes all work required for the construction of the shade structures, pedestrian bridge modifications, including all structural, mechanical, electrical, and architectural features. It includes all required additional design and refinement of the contract drawings and specifications to complete all structural, architectural, electrical details. It will be paid for as a lump sum.

END OF SECTION 012000

JANUARY 2023 PROJECT MANAGEMENT AND COORDINATION

CALF CREEK RECREATION AREA REDEVELOPMENT 013100-1

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Coordination Drawings.

2. Project meetings.

3. Requests for Interpretation (RFIs).

1.2 SUBMITTALS

A. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.

1. Content: Project-specific information, drawn accurately to scale. Do not base Coordination Drawings on reproductions of the Contract Documents or standard printed data. Revise first subparagraph below to establish a standard sheet size and format.Sheet Size: At least 8-1/2 by 11 inches but no larger than 30 by 40 inches.

2. Email submittal to the Contracting Officer for review. Contracting Officer will return one electronic copy.

3. Refer to individual Sections for Coordination Drawing requirements for Work in those Sections.

1.3 COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other contractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components.

CALF CREEK RECREATION AREA REDEVELOPMENT 013100-2

B. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Preinstallation conferences.

7. Startup and adjustment of systems.

8. Project closeout activities.

1.4 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Contracting Officer of scheduled meeting dates and times.

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.

3. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Contracting Officer, within three days of the meeting.

B. Preconstruction Conference: A preconstruction conference will be held before starting construction, at a time convenient to Contracting Officer, but no later than 15 days after receipt of the notice to proceed. Hold the conference at Project site or another convenient location.

Conduct the meeting to review project drawings, specifications, construction schedules, payroll, payments, and administrative provisions of the Contract. Be prepared to summarize and explain procedures planned for the project and present specified preconstruction submittals.

1. Minutes: Government will record and distribute minutes of meetings.

2. agreements, and disagreements, including required corrective measures and actions.

3. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present.

4. Do not proceed with installation if the conference cannot be successfully concluded.

Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

C. Progress Meetings: Conduct progress meetings on an as needed basis. Hold the meetings at the project site.

CALF CREEK RECREATION AREA REDEVELOPMENT 013100-3

1.5 REQUESTS FOR INTERPRETATION (RFIs)

A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, and if not possible to request interpretation at Project meeting, prepare and submit an RFI in the form specified.

1. RFIs shall originate with Contractor. RFIs submitted by entities other than Contractor will be returned with no response.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing interpretation and the following:

1. Project name.

2. Date.

3. Name of Contractor.

4. Name of Contracting Officer.

5. RFI number, numbered sequentially.

6. Contractor's signature.

7. Attachments: Include drawings, descriptions, measurements, photos, Product Data, Shop

Drawings, and other information necessary to fully describe items needing interpretation.

C. Contracting Officer's Action: Contracting Officer will review each RFI, determine action required, and return it. Allow 7 calendar days for Contracting Officer's response for each RFI.

D. On receipt of Contracting Officer's action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Contracting Officer within seven days if Contractor disagrees with response.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 013100

JANUARY 2018 QUALITY REQUIREMENTS

CALF CREEK RECREATION AREA REDEVELOPMENT 014000-1

SECTION 014000 - QUALITY REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and -control procedures that facilitate compliance with the Contract Document requirements.

2. Requirements for Contractor to provide quality-assurance and -control services required by Government or authorities having jurisdiction are not limited by provisions of this Section.

C. See Divisions 2 through 33 Sections for specific test and inspection requirements.

1.2 SUBMITTALS

A. Qualification Data: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority.

B. Reports: Prepare and submit certified written reports that include the following:

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples and tests or inspections.

5. Names of individuals making tests and inspections.

6. Description of the Work and test and inspection method.

7. Identification of product and Specification Section.

8. Complete test or inspection data.

9. Test and inspection results and an interpretation of test results.

10. Record of temperature and weather conditions at time of sample taking and testing and inspecting.

11. Comments or professional opinion on whether tested or inspected Work complies with the Contract Document requirements.

12. Name and signature of laboratory inspector.

13. Recommendations on retesting and reinspecting.

CALF CREEK RECREATION AREA REDEVELOPMENT 014000-2

C. Permits, Licenses, and Certificates: For Government records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.

1.3 DEFINITIONS

A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.

B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Contracting Officer.

C. Preconstruction Testing: Tests and inspections that are performed specifically for the Project before products and materials are incorporated into the Work to verify performance or compliance with specified criteria.

D. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with industry standards.

E. Source Quality-Control Testing: Tests and inspections that are performed at the source, i.e., plant, mill, factory, or shop.

F. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of the Work and for completed Work.

G. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.

H. Experienced: When used with an entity, "experienced" means having successfully completed a minimum of five previous projects similar in size and scope to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.

1.4 CONFLICTING REQUIREMENTS

A. General: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer uncertainties and requirements that are different, but apparently equal, to Contracting Officer for a decision before proceeding.

B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits.

To comply with these requirements, indicated numeric values are minimum or maximum, as

CALF CREEK RECREATION AREA REDEVELOPMENT 014000-3

appropriate, for the context of requirements. Refer uncertainties to Contracting Officer for a decision before proceeding.

1.5 QUALITY ASSURANCE

A. General: Qualifications paragraphs in this Article establish the minimum qualification levels required; individual Specification Sections specify additional requirements.

B. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.

C. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

D. Specialists: Certain sections of the Specifications require that specific construction activities shall be performed by entities who are recognized experts in those operations. Specialists shall satisfy qualification requirements indicated and shall be engaged for the activities indicated.

1. Requirement for specialists shall not supersede building codes and regulations governing the Work.

E. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspecting indicated, as documented according to ASTM E 548; and with additional qualifications specified in individual Sections; and where required by authorities having jurisdiction, that is acceptable to authorities.

1.6 QUALITY CONTROL

A. Government Responsibilities: Where quality-control services are indicated as Government responsibility, Government will engage a qualified testing agency to perform these services.

1. Contracting Officer will furnish Contractor with names, addresses, and telephone numbers of testing agencies engaged and a description of types of testing and inspecting they are engaged to perform.

2. Costs for retesting and reinspecting construction that replaces or is necessitated by work that failed to comply with the Contract Documents will be charged to Contractor.

B. Tests and inspections not explicitly assigned to Government are Contractor's responsibility.

Unless otherwise indicated, provide quality-control services specified and those required by authorities having jurisdiction. Perform quality-control services required of Contractor by authorities having jurisdiction, whether specified or not.

1. Where services are indicated as Contractor's responsibility, engage a qualified testing agency to perform these quality-control services.

a. Contractor shall not employ same entity engaged by Government, unless agreed to in writing by Contracting Officer.

CALF CREEK RECREATION AREA REDEVELOPMENT 014000-4

2. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or inspecting will be performed.

3. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service.

4. Testing and inspecting requested by Contractor and not required by the Contract Documents are Contractor's responsibility.

C. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and -control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 REPAIR AND PROTECTION

A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.

1. Provide materials and comply with installation requirements specified in other Specification Sections. Restore patched areas and extend restoration into adjoining areas with durable seams that are as invisible as possible.

B. Protect construction exposed by or for quality-control service activities.

C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.

END OF SECTION 014000 DRAFT

JANUARY 2023 PRODUCT REQUIREMENTS

CALF CREEK RECREATION AREA REDEVELOPMENT 016000-1

SECTION 016000 - PRODUCT REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for selection of products for use in Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special warranties; product substitutions; and comparable products.

B. See Division 1 Section "Closeout Procedures" for submitting warranties for Contract closeout.

C. See Divisions 2 through 33 Sections for specific requirements for warranties on products and installations specified to be warranted.

1.2 SUBMITTALS

A. Substitution Requests: Submit one electronic copy of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

1. Documentation: Show compliance with requirements for substitutions and the following, as applicable:

a. Statement indicating why specified material or product cannot be provided.

b. Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by Government and separate contractors that will be necessary to accommodate proposed substitution.

c. Detailed comparison of significant qualities of proposed substitution with those of the Work specified. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, and specific features and requirements indicated. Provide sufficient calculations and data to justify selection of proposed item and permit comparisons.

d. Product Data, including technical data, drawings, performance information, and descriptions of products and fabrication and installation procedures. Show complete layout of system, except that which is identical to Contract Documents, unless unchanged portion must be shown to indicate clearances. Include drawings, same (or larger) scale as Contract Drawings, marked to show differences. Include detail drawings of supports for equipment and load calculations, stamped and signed by a registered professional engineer.

e. Samples, where applicable or requested.

f. List of similar installations for completed projects with project names and addresses and names and addresses of COR’s and Government’s.

g. Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated.

CALF CREEK RECREATION AREA REDEVELOPMENT 016000-2

h. Research/evaluation reports evidencing compliance with building code in effect for Project, from a model code organization acceptable to authorities having jurisdiction.

i. Detailed comparison of Contractor's Construction Schedule using proposed substitution with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating lack of availability or delays in delivery.

j. Cost information, including a proposal of change, if any, in the Contract Sum.

k. Contractor's certification that proposed substitution complies with requirements in the Contract Documents and is appropriate for applications indicated.

l. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

2. Government Action: If necessary, Contracting Officer will request additional information or documentation for evaluation within 7 days of receipt of a request for substitution.

Contracting Officer will notify Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request, or 7 days of receipt of additional information or documentation, whichever is later.

a. Form of Acceptance: Modification.

b. Use product specified if Contracting Officer cannot make a decision on use of a proposed substitution within time allocated.

B. Comparable Product Requests: Submit one electronic copy of each request for consideration.

Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

1. Government Action: If necessary, Contracting Officer will request additional information or documentation for evaluation within one week of receipt of a comparable product request. Contracting Officer will notify Contractor of approval or rejection of proposed comparable product request within 15 days of receipt of request, or 7 days of receipt of additional information or documentation, whichever is later.

a. Form of Approval: As specified in Division 1 Section "Submittal Procedures."

b. Use product specified if Contracting Officer cannot make a decision on use of a comparable product request within time allocated.

C. Basis-of-Design Product Specification Submittal: Comply with requirements in Division 1 Section "Submittal Procedures." Show compliance with requirements.

1.3 DEFINITIONS

A. Products: Items purchased for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent.

CALF CREEK RECREATION AREA REDEVELOPMENT 016000-3

1. Named Products: Items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature, that is current as of date of the Contract Documents.

2. New Products: Items that have not previously been incorporated into another project or facility, except that products consisting of recycled-content materials are allowed, unless explicitly stated otherwise. Products salvaged or recycled from other projects are not considered new products.

3. Comparable Product: Product that is demonstrated and approved through submittal process, or where indicated as a product substitution, to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product.

B. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.

C. Basis-of-Design Product Specification: Where a specific manufacturer's product is named and accompanied by the words "basis of design," including make or model number or other designation, to establish the significant qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics for purposes of evaluating comparable products of other named manufacturers.

1.4 QUALITY ASSURANCE

A. Compatibility of Options: If Contractor is given option of selecting between two or more products for use on Project, product selected shall be compatible with products previously selected, even if previously selected products were also options.

1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft. Comply with manufacturer's written instructions.

B. Delivery and Handling:

1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces.

2. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

3. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.

4. Load and unload products in manner that protects from damage.

5. Inspect products on delivery to ensure compliance with the Contract Documents and to ensure that products are undamaged and properly protected.

CALF CREEK RECREATION AREA REDEVELOPMENT 016000-4

PRODUCT WARRANTIES

C. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents.

1. Manufacturer's Warranty: Preprinted written warranty published by individual manufacturer for a particular product and specifically endorsed by manufacturer to Government.

2. Special Warranty: Written warranty required by or incorporated into the Contract Documents, either to extend time limit provided by manufacturer's warranty or to provide more rights for Government.

D. Submittal Time: Comply with requirements in Division 1 Section "Closeout Procedures."

PART 2 - PRODUCTS

2.1 PRODUCT SELECTION PROCEDURES

A. General Product Requirements: Provide products that comply with the Contract Documents, that are undamaged and, unless otherwise indicated, that are new at time of installation.

1. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect.

2. Standard Products: If available, and unless custom products or nonstandard options are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects.

3. Government reserves the right to limit selection to products with warranties not in conflict with requirements of the Contract Documents.

4. Where products are accompanied by the term "as selected," Contracting Officer will make selection.

5. Where products are accompanied by the term "match sample," sample to be matched is Contracting Officer's.

6. Descriptive, performance, and reference standard requirements in the Specifications establish "salient characteristics" of products.

B. Product Selection Procedures:

1. Product: Where Specifications name a single product and manufacturer, provide the named product that complies with requirements.

2. Manufacturer/Source: Where Specifications name a single manufacturer or source, provide a product by the named manufacturer or source that complies with requirements.

3. Available Products: Where Specifications include a list of names of both products and manufacturers, provide one of the products listed, or an unnamed product, that complies with requirements. Comply with provisions in Part 2 "Comparable Products" Article for consideration of an unnamed product.

4. Available Manufacturers: Where Specifications include a list of manufacturers, provide a product by one of the manufacturers listed, or an unnamed manufacturer, that complies

CALF CREEK RECREATION AREA REDEVELOPMENT 016000-5

with requirements. Comply with provisions in Part 2 "Comparable Products" Article for consideration of an unnamed product.

5. Product Options: Where Specifications indicate that sizes, profiles, and dimensional requirements on Drawings are based on a specific product or system, provide the specified product or system. Comply with provisions in Part 2 "Product Substitutions" Article for consideration of an unnamed product or system.

6. Basis-of-Design Product: Where Specifications name a product and include a list of manufacturers, provide the specified product or a comparable product by one of the other named manufacturers. Drawings and Specifications indicate sizes, profiles, dimensions, and other characteristics that are based on the product named. Comply with provisions in Part 2 "Comparable Products" Article for consideration of an unnamed product by the other named manufacturers.

7. Visual Matching Specification: Where Specifications require matching an established Sample, select a product that complies with requirements and matches Contracting Officer's sample. Contracting Officer's decision will be final on whether a proposed product matches.

a. If no product available within specified category matches and complies with other specified requirements, comply with provisions in Part 2 "Product Substitutions" Article for proposal of product.

8. Visual Selection Specification: Where Specifications include the phrase "as selected from manufacturer's colors, patterns, textures" or a similar phrase, select a product that complies with other specified requirements.

a. Standard Range: Where Specifications include the phrase "standard range of colors, patterns, textures" or similar phrase, Contracting Officer will select color, pattern, density, or texture from manufacturer's product line that does not include premium items.

2.2 PRODUCT SUBSTITUTIONS

A. Timing: Contracting Officer will consider requests for substitution if received within 30 days after the Notice to Proceed. Requests received after that time may be considered or rejected at discretion of Contracting Officer.

B. Conditions: Contracting Officer will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Contracting Officer will return requests without action, except to record noncompliance with these requirements:

1. Requested substitution offers Government a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional responsibilities Government must assume. Government additional responsibilities may include compensation to COR for redesign and evaluation services, increased cost of other construction by Government, and similar considerations.

2. Requested substitution does not require extensive revisions to the Contract Documents.

3. Requested substitution is consistent with the Contract Documents and will produce indicated results.

4. Substitution request is fully documented and properly submitted.

CALF CREEK RECREATION AREA REDEVELOPMENT 016000-6

5. Requested substitution will not adversely affect Contractor's Construction Schedule.

6. Requested substitution has received necessary approvals of authorities having jurisdiction.

7. Requested substitution is compatible with other portions of the Work.

8. Requested substitution has been coordinated with other portions of the Work.

9. Requested substitution provides specified warranty.

2.3 COMPARABLE PRODUCTS

A. Conditions: Contracting Officer will consider Contractor's request for comparable product when the following conditions are satisfied. If the following conditions are not satisfied, Contracting Officer will return requests without action, except to record noncompliance with these requirements:

1. Evidence that the proposed product does not require extensive revisions to the Contract Documents that it is consistent with the Contract Documents and will produce the indicated results, and that it is compatible with other portions of the Work.

2. Detailed comparison of significant qualities of proposed product with those named in the Specifications. Significant qualities include attributes such as performance, weight, size, durability, visual effect, and specific features and requirements indicated.

3. Evidence that proposed product provides specified warranty.

4. List of similar installations for completed projects with project names and addresses and names and addresses of COR’s and Government’s, if requested.

5. Samples, if requested.

PART 3 - EXECUTION (Not Used)

END OF SECTION 016000

JANUARY 2023 EXECUTION REQUIREMENTS

CALF CREEK RECREATION AREA REDEVELOPMENT 017000-1

SECTION 017000 - EXECUTION REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes general procedural requirements governing execution of the Work including, but not limited to, the following:

1. Construction layout.

2. Field engineering and surveying.

3. General installation of products.

4. Progress cleaning.

5. Starting and adjusting.

6. Protection of installed construction.

7. Correction of…