Draft SOW First Aid Training Services N6426720Q0072.pdf
PDF 142 KB Posted
- Attached to
- Code 102 first Aid Training Federal contract opportunity
- Solicitation number
- N6426720Q0072
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
CPR, AED AND FIRST AID TRAINING SERVICES
NAVAL SURFACE WARFARE CENTER CORONA DIVISION
1.0 INTRODUCTION
The service sought in this procurement is to provide cardiopulmonary resuscitation (CPR), automated external defibrillator (AED) and first aid training for NSWC Corona Division
(NSWCCORDIV).
2.0 BACKGROUND
NSWCCORDIV has employees who travel to remote destinations, which are not in near proximity to infirmaries, hospitals or clinics and, therefore, require first aid training.
3.0 SCOPE
The Contractor shall provide CPR, AED and First Aid Training upon request at the three performance locations identified in this SOW.
4.0 APPLICABLE DOCUMENTS
The contractor is required to adhere to all applicable federal standards and guidelines listed in this document. Publications and attachments applicable to this contract will be made available upon request. It should be noted that during the solicitation and life of this contract, the Government may make changes, additions, or deletions to those listed. The effective issue is the listed document or the thereafter modified or superseded document.
5.0 PERFORMANCE REQUIREMENTS
NSWCCORDIV requires first aid training in the following quantities:
CLIN Material w/ Service Qty.
0001 First Aid/CPR/AED Training 12 annually
1001 First Aid/CPR/AED Training 12 annually
First Aid/CPR/AED Training 12 annually
First Aid/CPR/AED Training 12 annually
CLIN Material w/ Service Qty.
4001 First Aid/CPR/AED Training 12 annually
5.1 Training
5.1.1 The Contractor shall provide First Aid/CPR/AED training as requested by the TPOC 12 times annually to support the three performance locations identified within this SOW.
5.1.2 The training shall meet the nationally recognized consensus standards developed by the American Heart Association (AHA) or American Red Cross (ARC) for basic and advanced first aid.
5.1.3 Upon completion of the training, the Contractor shall provide a certification card/certificate to each person who completed the training.
5.1.4 NSWCCORDIV will provide a facility to hold the training as well as a display/projector screen; however, the contractor shall provide all additional materials/resources necessary such as laptop computers, training videos, visual aids, training manikins, pamphlets, etc.
5.2 Security
5.2.1 Contractor shall be properly vetted through the Commander Navy Region Southwest clearance process and shall be enrolled in the Defense Biometric Identification System
(DBIDS).
5.2.2 The DBIDS badge shall be set up for Naval Weapons Station Seal Beach and Detachments Fallbrook and Norco. Badges will be issued upon arrival to the facility and shall be returned when leaving the installation.
5.2.3 Contractor employees shall meet the requirements for a favorable public trust background investigation initiated by the government.
5.2.4 Contractor will provide government a personnel list on company letterhead signed by competent authority/manager of all (prime and sub) personnel performing on the contract.
This list will also be reconciled and forwarded to the NSWCCORDIV security office as changes occur.
5.2.5 General Security Compliance. Contractor personnel shall comply with all DoD, DoN, NAVSEA, NSWCCORDIV, and other performance location’s security instructions, policies, procedures and guidance. These requirements apply both on and off Government property at NSWC Corona, remote sites or travel destinations.
5.2.6 Foreign Interests. Contractors with defined Foreign Interests (a Facility that is owned, controlled, or influenced by foreign interests) will ensure adherence to DoD and Navy regulations. Full disclosure to the Corona Contracting Officer, TPOC/POC and security office is mandated.
5.2.7 Contractors will follow Corona emergency preparedness and antiterrorism protocol during designated command emergencies and declared threat conditions.
5.2.8 Contractor will be escorted by authorized NSWC Corona personnel to training areas located in secured spaces.
5.2.9 Access to Government facilities is at the discretion of the Government. The Government reserves the right to rescind access at any time.
5.2.10 Contractor employees shall be clearly identifiable while on Government property by wearing a badge as required. Contractor employees shall clearly identify themselves and the company they work for whenever making contact with Government personnel by telephone, electronic, or by other means.
5.2.11 Contractor shall comply with all Department of the Navy and Marine Corps, State and Federal Government security laws and established policies and procedures. Contractor shall follow procedures for security compromises that conform to DoN and Government procedures.
5.3 Other Requirements
5.3.1 Delays. The Contracting Officers Representative will review any Contractor delay or failure to perform to determine if the delay is caused by technical factors beyond the Contractor’s control and without fault or negligence by the Contractor. If the review indicates performance deficiency is not the result of factors beyond the Contractor’s control, the Contractor will be notified. The Contractor shall respond within 24 hours of receipt of notification with remedies to correct the deficiencies.
5.3.2 Performance Standards. Satisfactory completion of this task order shall be measured by completion of deliverables and tasks identified in this document. Completion of deliverables and tasks shall remain within the scope of this document. At a minimum, the following metrics shall be applied:
There are no oversights in the review and analysis performed by the contractor that result in incorrect or inadequate assumptions, which, in turn, result in unacceptable recommendations.
There are no oversights in the development of reports, documents, or functional requirements, which could result in delays in meeting established timelines.
All written documentation is written in a skilled business style. The documentation conforms to standards for documentation established by the Contracting Officer and the TPOC/POC.
All work is completed within the established and agreed upon time frames.
The quality of the work and the content of deliverables (and their exposition) shall be highly professional.
File details come from the government source that posted it. Updated .