DRAFT Sections L and M FUELS 20230313.docx
DOCX document 120 KB Posted
- Attached to
- AFCEC FUELS MATOC Federal contract opportunity
- Solicitation number
- FA890323R0017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FUELS SOW Draft 20230313.docx | DOCX document | |
| FUELS MATOC - DRAFT Attach 03 .xlsx | XLSX spreadsheet | |
| FA890323R0017 Question Matrix.xlsx | XLSX spreadsheet | |
| Attachment L-02 Contractor Data Sheet.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTIONS L & M: Instructions, Conditions, and Notices to Offerors and Evaluation Factors for Award
The following instructions and information is a combination of Instructions to Offerors (ITO) and the corresponding evaluation methodology that will be applied to Fuels MATOC proposals resulting from this solicitation. These have been combined for ease of reference and to ensure that all submission instructions have corresponding evaluation methodology or criteria. The terms “Offeror,” “Contractor,” or “Prime” are used interchangeably in this document.
1.0 PROPOSAL PREPARATION INSTRUCTIONS
This section provides instructions for preparing proposals. It is the Offeror's responsibility to ensure the completeness of the proposal submitted. Compliance with these instructions is mandatory and failure to furnish a complete proposal, at the time of proposal submission, may result in the proposal being unacceptable to the Government and may eliminate the Offeror from further consideration for award. Simply stating that the Offeror understands and intends to comply with this effort or paraphrasing statements in the RFP is inadequate. You are representing that your firm will perform all the requirements specified in the solicitation by submitting your proposal. All appropriate markings shall include those prescribed IAW FAR 52.215-1(e), Restriction on Disclosure and Use of Data, and FAR 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal Information and Source Selection Information.” Evaluation of a proposal will be conducted solely on the basis of the information contained within it and the Government will not assume that an Offeror possesses any capabilities not specified.
1.1 PROGRAM STRUCTURE AND OBJECTIVES
a. The Government intends to evaluate proposals and award contracts without discussions with Offerors in accordance with FAR 52.215-1 Instructions to Offerors – Competitive Acquisition. Clarifications may be conducted as described in FAR 15.306(a). Therefore, the Offeror's initial proposal should contain the Offeror's best terms from a technical and a price standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary or in the best interest of the Government. If discussions are held, discussions will only be held with those Offerors determined to be in the competitive range.
b. The Government intends to award approximately twenty-five (25) awards under an unrestricted Full and Open (F&O) competition. The Government reserves the right to make fewer or more awards based on the quality and quantity of proposals received.
| 2.0 | GENERAL INFORMATION |
| 2.1 | POINT OF CONTACT |
All questions, concerns, or clarifications shall be addressed to the Contracting Officer listed below. All inquiries must be made in writing and submitted electronically to the Contracting Officer and the Contract Specialist at 772ess.fuels.MATOC@us.af.mil. The Contracting office will provide a notice of receipt, but if none is received, it is the Contractor’s responsibility to follow-up to the Contracting Officer.
FUELS MATOC EMAIL. The FUELS email is: 772ess.fuels.MATOC@us.af.mil
2.1.1 Discrepancies
If an Offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the Offeror shall notify the CO in writing with supporting rationale immediately, but no later than 10 days after release of the RFP or RFP amendments.
2.1.2 Debriefings
Debriefings. The CO will promptly notify offerors of any decision to exclude them from the competitive range; whereupon the contractor may request and receive a pre-award debriefing in accordance with FAR 15.505, or the offeror may choose to wait until after award of the contract to request a post-award debriefing in accordance with FAR 15.506. However, offerors excluded from the competitive range are entitled to no more than one debriefing. Offerors will have five business days following a post-award debriefing to submit additional questions related to the debriefing. The agency shall not consider the post-award debriefing to be concluded until the agency delivers its written responses to the unsuccessful offeror.
2.1.3 Exclusions of Grossly Deficient Proposals
The Government may exclude a proposal from this competition without evaluating the proposal against the Evaluation Factors as defined in Section M, if an initial assessment of the proposal shows the proposal to be grossly deficient. Grossly deficient proposals are proposals that fail to address essential requirements of the solicitation, fail to furnish information demonstrating compliance with mandatory solicitation requirements set forth in the solicitation, or in some other manner do not represent a reasonable initial effort by the Offeror to satisfy the requirements of the solicitation.
| 2.1.4 | Teaming |
| 2.1.4.1 | Use of Teaming Partners: The Government intends to award directly to firms that perform DoD POL Construction Management (Home and On-site Management/Quality Control) in-house (organically) without use of teaming partners. Offerors are advised that the use of teaming partner resources in the technical proposal, including experience and/or key personnel qualifications, is not permitted unless the offeror is a formal Joint Venture and the key personnel/experience are from the JV itself or one of its entities. See evaluation criteria. |
| 2.1.4.2 | Joint Ventures (JV): A business arrangement wherein two or more companies agree to form a partnership to perform a specific function. The JV is a discrete business entity separate from each of its component participants. The Joint Venture Agreement is the controlling document concerning what responsibilities each participant will contribute to the JV. This is different from a teaming agreement in that each participant in a teaming agreement maintains its separate identity and responsibilities. No contract may be awarded to a joint venture that is not registered in the System for Award Management (SAM). Joint ventures may register by contacting the SAM at http://www.sam.gov. Each contractor may only receive a maximum of one prime contract award. |
a. Mentor-Protégé (M-P) is a relationship and not a business entity. M-Ps require formal agreements and thus a Joint Venture relationship must be established and submitted as the Prime Offeror for that technical proposal to be valid.
b. Each potential contractor shall submit only one proposal and only one contract may be awarded to that contractor. Individual entities of Joint Venture (JV) Offers are not permitted to submit a separate proposal independent of that JV, to include being an entity of another JV. In the case where one offeror submits multiple proposals, that offeror will be provided the opportunity to clarify which proposal shall be evaluated. All other proposals from that offeror will be removed from consideration.
2.1.5. Conglomerate and Affiliated Business Rules:
a. Definitions:
For purposes of this solicitation, the following definitions apply:
Stand-Alone Company – A company that does not have a parent, sister or subsidiary business relationship with any other entity.
Conglomerate – A business arrangement where the entities of the Parent or Holding Company remain totally separate from each other. In this arrangement, entities do not have management or business decision rights over Parent, Sister, Subsidiary, and/or other related entities.
Affiliated Company- A business arrangement where each of the entities have management and business decision rights that extend to the other entities within the corporation or LLC. In this relationship, management and key personnel work interchangeably across the affiliated entities without the requirement for internal permission or delegation memos, documents, or contracts.
b. Prohibition of Multiple Proposal Submissions Only one offer may be submitted per entity under a conglomerate business arrangement, provided that the parent or holding company does not also submit a proposal. Affiliated businesses shall submit only one proposal across all entities contained within the affiliated business arrangement. Proposals received from more than one entity under an affiliated business arrangement will not be evaluated. In the case where one entity submits multiple proposals, all proposals from that entity may be removed from consideration.
c. Technical Proposal Limitations Offerors are ONLY permitted to submit experience and/or key personnel qualifications from a sister, parent, or subsidiary company IF the Offeror’s business status is that of an affiliated company. Offerors that are considered part of a conglomerate business arrangement SHALL NOT utilize experience or key personnel from a sister, parent, or subsidiary. Accordingly, Offerors that submit experience and/or key personnel qualifications from a parent, sister, or subsidiary company that is part of a conglomerate business arrangement, will not be considered. Comment by SUMMERS, BRINDLE T NH-04 USAF AFMC 772 ESS/PKA: Now we need to consider how we are going to have the contractors respond to this. Perhaps in their cover letter they need to identify if they have sister/parent/subsidiary companies. And if they do, if they are going to use them for any experience/quals...and if they are, they would need to address the specific relationship.
2.2 VOLUME ORGANIZATION
Volume I – Contract Documentation Cover Page Contractor Data Sheet (Attachment L-02) Banking Representations and Certifications – Call out clauses that they must mark
Volume II – Technical Capabilities Attachment L-04A Corporate and On-site Key Personnel Table Technical Factor 1 - Bonding Technical Factor 2 - Corporate Experience and Structure
| Category 1 - Corporate Experience – One (1) page per Project, Three (3) pages total |
| Category 2 – Program Manager - One (1) page (Attachment L-4B) |
Category 3 – Project Manager - One (1) page (Attachment L-4B) Category 4 - Corporate Quality Control - One (1) page (Attachment L-4B) Category 5 – Corporate Safety Manager - One (1) page (Attachment L-4B) Technical Factor 3 – Qualifications of Key Field Personnel - One (1) page per Key Field Personnel per pool as applicable (Attachment L-4B).
Technical Factor 4 – Small Business Participation Commitment – Five (5) pages maximum & Attachment L-05 Subcontracting Plan if applicable (not included in page count).
Volume III – Price Price Factor 1 (Attachment L-3)
| 2.3 | PROPOSAL FORMAT |
| 2.3.1 | Guidance |
SUBMITTAL OF ANY INFORMATION THAT DOES NOT COMPLY WITH THE FORMAT SPECIFICATIONS STATED IN THIS SOLICITATION MAY NOT BE EVALUATED, RESULTING IN A PROPOSAL THAT IS UNAWARDABLE.
2.3.2 Sufficient Detail
The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. Offeror(s) shall assume that the Government has no prior knowledge of their facilities and experience, and will base its evaluation on the information presented in the Offeror's proposal.
2.3.4 Price Information
All cost or pricing information shall be addressed in the Price Proposal Volume. Cost or pricing information shall not be included in Volumes I or II.
2.3.5 Electronic Proposal Submission
Each offeror shall email the electronic submission of their proposal to the FUELS email address at 772ess.fuels.MATOC@us.af.mil. All volumes of an Offeror’s proposal must be submitted together. All Prime and or Joint Venturer information must be incorporated into one coherent email or DoDSafe Drop with all Volumes being delivered as separate PDF documents.
(i) Complete electronic proposals containing all Volumes shall be submitted in searchable Adobe Acrobat Portable Document File (pdf) format; zip files will not be accepted. Attachments L-04, FUELS Labor Rate Tables is the exception and shall be submitted in Microsoft Excel format. Do not password protect any Price Proposal Microsoft Excel spreadsheets. The electronic files shall be live and contain fully traceable formulas and shall not contain references to external workbooks, with all equations and functions fully functional, unlocked, and unhidden.
(ii) Each volume shall be compatible with the following available Government equipment and software products:
Adobe Acrobat Reader Microsoft Office 2010
(iii) Sound, video (e.g. MPEG), or other files shall not be embedded into the proposal files.
2.3.6 Page Format Restrictions and Limitations
a. Pages shall be 8.5 x 11 inches.
b. Text pages shall be portrait oriented. Graphics and tables may be landscape oriented if required to properly present the information.
c. Pages shall be typed with at least single line spacing. No condensed fonts allowed. Times New Roman, Arial, or Calibri. The font size shall be no less than 12 point except for the following: Tables, charts, graphs and figures shall be no smaller than 8 point.
d. Margins on all four edges of each sheet shall be at least one inch.
e. Proprietary statements, security markings, and page numbers can fall within the defined margin area and shall be no smaller than 8 font size.
f. Page limitations shall be treated as maximums. If page limits are exceeded, the excess pages will not be read or considered in the evaluation of the proposal.
VOLUME COMPOSITION
3.0 VOLUME I – OFFEROR INFORMATION
3.1 COVER PAGE AND VALIDITY STATEMENT
The Cover page shall address the offerors point of contact including the authorized signing representative. The Offeror shall make a clear statement that the proposal is valid until the date in the Fuels MATOC solicitation and any resulting amendments. Any applicable restriction on disclosure and use of the data provided in the Offeror’s proposal shall include the appropriate markings prescribed in FAR 52.215-1(e), Restriction on Disclosure and Use of Data, and FAR 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal Information and Source Selection Information.”
3.2 CONTRACTOR DATA INFORMATION
a. The Government requests that Offerors provide Attachment L-02, Contractor Data Sheet to acquisition mailbox 772ess.fuels.MATOC@us.af.mil, on or before 2:00 pm (CST) – XXXXX (date established in Contract Opportunities on beta.SAM.gov website).
b. Once the contract is awarded, all successful contractors will be added into a database and will receive an email with further directions for updating contractor information. Comment by HAYHURST, MELISSA H NH-03 USAF AFICC 772 ESS/PKC: What does this mean?
3.5 CONTRACTOR RESPONSIBILITY
In accordance with FAR 9.103(b), prior to being eligible for award, the CO must make an affirmative determination of responsibility for potential awardees. The information requested in this volume is necessary to establish contractor responsibility. Information will not be evaluated, but will be used solely for the purpose of determining contractor responsibility.
3.5.1 Representations and Certifications Comment by HAYHURST, MELISSA H NH-03 USAF AFICC 772 ESS/PKC: Ask Policy if we can just have them indicate they have completed the ones in SAM.
The offeror shall review FAR 52.204-8 and certify in the cover letter that paragraph (d) applies such that the offeror has updated SAM in accordance with 52.204-8(d). The NAICS code for this solicitation is 237120. The size standard for this NAICS is $45M.
3.6.2 Financial Responsibility
a. As part of the Financial Responsibility Determination, the CO will rely on information from the cognizant banking institution. The offeror shall complete the Attachment L-02, Contractor Data Sheet to provide banking contact information and submit with the proposal. Additionally, offerors shall request that their Bank or Credit Union (Financial Institution) complete the Banking Status Inquiry located in Attachment L-XX and submit it to acquisition mailbox 772ess.fuels.MATOC@us.af.mil on or before the submission deadline for the proposal. The Banking Status Inquiry will not be evaluated as part of the technical and price proposal; however, it’s evaluation is required to determine contractor responsibility prior to award. A contract may only be awarded to the offerors who are deemed responsible in accordance with the FAR 9.104.
3.7 EVALUATION METHODOLOGY
3.7.1 Basis For Contract Award
Award will be made to Technically Acceptable Offerors that provide a Fair and Reasonable Rate Proposal (Technically Acceptable, Rates Acceptable (TARA)). Award will be made to all Offerors that provide a technically acceptable Volume II Technical Proposal, and whose Volume III Rate Proposal is considered Fair and Reasonable.
3.7.2 Gated Evaluation:
The Volume III technical proposal will be evaluated in two phases/gates. Gate 1 will be comprised of the following technical factors: 1- Bonding; and 2-Corporate Experience and Corporate Key Personnel. Only those offerors that receive a technical rating of acceptable in all criteria in Gate 1 will progress to the next phase/gate in evaluation. Phase/Gate 2 will consist of the technical factor 4- Key Field Personnel for each desired pool, and Volume III – Rates Proposal.
To be considered for evaluation and contract award, Offerors are required to submit all volumes with their proposal. The Air Force will not request a separate submission for the gate 2 evaluation. Each proposal will be independently rated against the criteria. While the Government source selection evaluation team and the Source Selection Authority (SSA) will strive for maximum objectivity, the source selection process is subjective by nature and professional judgment is implicit throughout the entire process. To arrive at a source selection decision, the SSA will integrate the source selection team's evaluations of the Factors described below.
4.0 VOLUME II – TECHNICAL PROPOSAL
4.1 DEFINITIONS. Contractors shall use the following definitions while preparing proposals for this acquisition. These definitions are applicable to Sections L & M. Throughout the document terms are italicized for reference to indicate there is a definition.
4.1.1. COMPLETED PROJECTS. Completed projects are defined as construction completed (beneficial occupancy established) within the past five years from the date this request for proposals was issued.
4.1.2 DOD POL FACILITIES. DoD POL Facilities are defined as Petroleum, Oil, and Lubricants (POL or `fuels') facilities that are located on a United States Department of Defense installation (Army, Navy, Air Force, Marines, Army or Air Force National Guard, or Reserve bases). DoD POL facilities include fuel farms, above ground storage tanks, underground storage tanks, cut-and-cover tanks, hydrant fuel distribution systems including piping, pumps, valves, hydrant and filter separators, oil water separator, bulk storage systems, transfer pump houses, POL control systems, stilling wells, containment areas, fuel pits, and fill stands. The definition of DoD POL facilities does not include facilities on a Coast Guard base, NASA location, or any other federal, commercial, or private facility, to include commercial supply pipelines leading up to and/or connecting to DoD Installations.
4.1.3. PROJECTS. “Project” is defined as work performed pursuant to ONE SPECIFIC TASK ORDER of an indefinite delivery/indefinite quantity (IDIQ) type contract. An IDIQ type contract, in and of itself, is NOT considered a project. “Project” is also defined as a single, stand alone, site-specific contract with one or more of the following minimum characteristics noted below:
4.1.4. DOD POL WETTED SYSTEM REPAIRS: DoD POL Wetted System Repairs is defined as any construction or repair of DoD POL WETTED facilities, where the construction/repairs are MECHANICAL OR ELECTRICAL in nature, for the following types of wetted DoD POL facilities: above ground storage tanks, underground storage tanks, cut-and-cover tanks, hydrant fuel distribution systems including pumps, valves, hydrant and filter separators, bulk storage systems, pump houses, fuel pits, and fill stands. To be considered relevant, the work must have been substantially mechanical and/or electrical construction/repair in which the facility or asset constructed/repaired was taken out of service during the repair. Coatings, abatement, cathodic protection, civil works, demolition, or maintenance-type efforts are NOT relevant. Construction/Repair to DoD POL-related facilities that do NOT touch fuel during normal daily operations (containment, canopies, fuels operation facilities, buildings, pavement, etc) are NOT considered Wetted Systems and are thus not relevant.
4.1.5. SPECIALIZED API 653 TANK REPAIRS: New field-erected and/or cut and cover fuel tank construction pursuant to API 650 and/or tank repair projects resultant from API 653 inspections (or modified API 653 inspections) in which the construction requires the removal of the tank(s) from service, performing multi-disciplinary repairs, to include mechanical repairs, patch plate/pit repairs, substantial welding (not just incidental welding) and significant coatings (not just spot coatings), and successfully returning the tank(s) to operation. (Incidental work around an API 653 fuel tank is not considered API 653 construction and/or repair.)
4.1.6. SPECIALIZED HYDRANT SYSTEM REPAIRS: Infrastructure construction and repair for JP/Jet-A type products to support military aircraft hydrant fueling systems. Each hydrant system project must demonstrate experience making multi-disciplinary repairs to at least three of the following components of TYPE III, IV, or V hydrant systems: hydrant pumps, hydrant valves, hydrant pits, hydrant pump houses, hydrant filtration systems, hydrant distribution pipelines, and hydrant system controls and motor control centers. To be considered relevant, the work must have been substantially mechanical and/or electrical construction/repair in which the facility or asset constructed/repaired was taken out of service during repair efforts. Coatings, abatement, cathodic protection, civil works, demolition, or maintenance-type efforts are NOT relevant. Construction/Repair to DoD POL-related facilities that do NOT touch fuel during normal daily operations (containment, canopies, fuels operation facilities, buildings, pavement, etc) are NOT considered Hydrant Systems and are thus not relevant. (Incidental work on and/or around a hydrant system, such as tanks, equipment, and appurtenances attached to the hydrant loop, is not considered Hydrant System construction and/or repair.)
4.2. PARTICIPATION IN SPECIALIZED POOLS
Only those offerors whose Volume II Technical Proposals are deemed Technically Acceptable for a specialized pool, will be afforded the opportunity to provide proposals for that pool at the task order level.
4.3. SUBMISSION AND EVALUATION- GATE 1 CRITERIA
4.3.1 Technical Factor 1 – Bonding
4.3.1.1. SECTION L Submission Requirement: The Offeror must provide a letter from their surety, on surety letterhead, stating the contractor has a relationship with the surety and identifies the Prime contractor’s single and aggregate bonding capacities. For Joint Venture Offerors, the surety letter must clearly identify that the surety is bonding for the Joint Venture itself, not the individual entity(s).
4.3.1.2. SECTION M Evaluation Method:
| Adjectival Rating |
| Description |
| Acceptable |
| Proposal meets the requirements of the solicitation. |
| Unacceptable |
| Proposal does not meet the requirements of the solicitation. |
To be considered acceptable, the offeror must meet the Minimum Qualifications for the corresponding business type. Offerors that do not demonstrate the Minimum Qualifications identified below will be rated Unacceptable.
4.3.1.3. Minimum Qualifications: To be determined acceptable, the contractor must demonstrate the ability to receive bonding for their corresponding business type at or above the following minimum capacities.
Business Types:
· Small Business
· $10M minimum single bonding capacity
· $25M aggregate bonding capacity
· Other than Small Business
· $25M minimum single bonding capacity
· $50M aggregate bonding capacity
· Foreign Firms
· Foreign firms working exclusively outside the United States and its outlying areas, are exempt from this requirement where there are different standards for bonding. Firms that do not submit bonding information must represent that they do not intend to propose on work in the United States or outlying areas on Attachment L-02 Contract Data Sheet. Foreign Firms that do not provide bonding information will be determined as not responsible at the task order level for any task order that requires performance and payment bonds. Performance and Payment bonds will be required for task orders whose performance is within the United States or its outlying areas. Outlying areas is defined in FAR 2.101.
Surety letters must be from an approved surety listed with the Department of Treasury. The list of approved sureties can be found at http://www.fiscal.treasury.gov/fsreports/ref/suretyBnd/c570_a-z.htm. Letters must be notarized and signed by someone who can represent the surety. Letters signed by agents are unacceptable unless accompanied by a Power of Attorney granting proper authority to the agent.
4.3.2. TECHNICAL FACTOR 2 - CORPORATE EXPERIENCE AND CORPORATE KEY PERSONNEL Comment by COCKERILL, KATIE B GG-13 USAF AFMC AFLCMC/HNCKP: Comment from Brindle: I still believe these read better when Section L simply says, “See Section M for Evaluation Factors, to include proposal submission requirements and evaluation methodology. Then put it all in a neat and tidy bow – Definitions, what to submit in Factor 1, how we’ll evaluate Factor 1, what to submit in Factor 2, how we’ll evaluate Factor 2, etc…don’;t forget the source selection guide definitions. Comment by COCKERILL, KATIE B GG-13 USAF AFMC AFLCMC/HNCKP: Based on comments from policy, I believe they want two distinct sections. Comment by COCKERILL, KATIE B GG-13 USAF AFMC AFLCMC/HNCKP: Comment from Brindle: I still believe these read better when Section L simply says, “See Section M for Evaluation Factors, to include proposal submission requirements and evaluation methodology. Then put it all in a neat and tidy bow – Definitions, what to submit in Factor 1, how we’ll evaluate Factor 1, what to submit in Factor 2, how we’ll evaluate Factor 2, etc…don’;t forget the source selection guide definitions. Comment by COCKERILL, KATIE B GG-13 USAF AFMC AFLCMC/HNCKP: Based on comments from policy, I believe they want two distinct sections.
4.3.2.1. SECTION L Submission Requirement: Offerors shall provide a narrative/ complete the form at L-XX in accordance with the categories identified below, to demonstrate the extent and breadth of the Prime’s DoD POL construction and repair experience and the qualifications of the Corporate personnel. All Corporate Key Personnel must be employed by the Prime offeror (or in the case of Joint Ventures, Corporate Key Personnel must be employed by one of the Joint Venture entities). The offeror is responsible for ensuring enough detail is provided for the Government to evaluate adherence to the minimum qualifications. Offeror’s corporate key personnel qualifications shall be submitted in accordance with Attachment L-04B Qualifications of Corporate and On-site Key Personnel and shall be cross referenced in Attachment L-04A Key Personnel Matrix.
4.3.2.2. SECTION M Evaluation Method:
| Adjectival Rating |
| Description |
| Acceptable |
| Proposal meets the requirements of the solicitation. |
| Unacceptable |
| Proposal does not meet the requirements of the solicitation. |
To be considered acceptable, the offeror must meet the corresponding Minimum Qualifications for each category below. Offerors that do not demonstrate the Minimum Qualifications identified below for all categories will be rated Unacceptable.
4.3.2.2.1. Category 1- Corporate Experience Submission Requirement: Offerors shall provide a narrative/form, not to exceed one page per project, that summarizes their DoD POL Wetted System Repairs experience as a Prime Contractor. The narrative/form shall describe THREE specific projects, each with the following minimum characteristics.
a. Performed by the Offeror as a Prime Contractor.
b. Demonstrate DoD POL Wetted System Repairs on DoD POL Facilities completed within five years from the date this RFP was issued. See above for definitions of “DoD POL Wetted System Repairs”, “DoD POL Facilities,” and “completed projects”.
c. The value for wetted system repairs on each completed project meets or exceeds $500,000. Example: Where a project contains secondary containment, cathodic protection, and fill stand repairs, the value of the fill stand repairs, by itself, must meet or exceed the $500,000.
The narrative must clearly indicate that the Offeror served as the Prime Contractor and directly provided Program Management, Project Management, and onsite Superintendent and Quality Control support for the projects provided. Projects completed using teaming partners or subcontracted corporate and/or on-site key personnel will not be considered acceptable.
4.3.2.2.2. Minimum Qualifications - Corporate Experience: Offeror’s must demonstrate at least THREE projects completed (beneficial occupancy established) within the last five years from the date the RFP was issued. All projects must meet the definition of DoD POL Wetted System Repairs for DoD POL Facilities and have a wetted system repair value of $500,000 or higher. Projects must have been performed by the Prime Offeror as a Prime Contractor – Projects performed by Teaming Partners or Major Subcontractors will not be considered and may render this factor unacceptable. For Joint-Venture Offerors, at least one project must have been completed as a Prime Contractor by each entity in the Joint Venture. Comment by HAWLEY, KIRSTEN R CIV USAF AFMC AFICA/KA (ACE): KRH: Appears to be missing 5.3.2 in this list. Recommend updating.
4.3.2.3. Category 2 - Program Manager: The Program Manager is responsible for the firm’s overall DoD POL program. DoD POL Project Managers, Corporate QC Manager, and Corporate Safety Manager shall report to the Program Manager for DoD POL-related efforts. The Offeror shall submit a 1-page narrative that summarizes the experience of the Program Manager, to include a general description of DoD Construction Management experience to demonstrate the type, duration, and role of the Program Manager, and a detailed description of the types of DoD POL Wetted System Repairs completed, to include completion dates and the location (DoD installation) of the work.
4.3.2.4. Minimum Qualifications – Program Manager: The Program Manager must demonstrate a minimum of 10 years of experience actively working in DoD Construction Management, either as a Project Manager, Construction Manager/Superintendent, or QC Manager. The Program Manager must also have completed at least TWO DoD POL Wetted System Repairs projects of at least $500,000 in a PM, CM/Superintendent, or QC Manager role.
4.3.2.5. Category 3 - Project Manager: While it is anticipated that most firms will have more than one DoD POL Project Manager, for purposes of this evaluation, the contractor must provide one Project Manager to evaluate. A Project Manager is responsible for the execution of individual DoD POL construction projects. The Offeror shall submit a 1-page narrative that summarizes narrative shall summarize the experience of the Project Manager, to include a generalized description of experience as a Project manager for DoD construction projects to substantiate five years of experience, as well as a detailed description of the types of DoD POL Wetted System Repairs completed, to include completion dates/ Beneficial Occupancy Date (BOD) and the location (DoD installation) of the work. All experience must represent construction on a DoD installation.
4.3.2.6. Minimum Qualifications- Project Manager: The Project Manager must demonstrate a minimum of FIVE years of experience as a Project Manager for DoD construction projects. Experience in any other role, to include Construction Manager/Superintendent or QC Manager will not be considered acceptable. The Project Manager must also have served as Project Manager for at least TWO DoD POL Wetted System Repairs projects of at least $500,000. The projects must have been completed within the past five years from the date the RFP was issued, and the Project Manager must have served in the Project Manager role for the entire duration of the project.
4.3.2.7. Category 4 - Corporate QC Manager: The Corporate QC Manager is responsible for the firm’s overall QC program, providing oversight and guidance to on-site DoD POL Quality Control Managers and associated projects. The Corporate QC Manager also provides quality assurance of the firm’s quality control program. The Corporate QC Manager reports all DoD POL quality control-related issues and concerns to the Program Manager. The Offeror shall submit a 1-page narrative that summarizes narrative shall summarize the experience of the QC Manager, to include a description of the types of DoD construction projects completed, completion dates, and the location (DoD installation) of the work. All experience must represent construction on a DoD installation.
4.3.2.8. Minimum Qualifications – Corporate QC Manager: The Corporate QC Manager must demonstrate a minimum of TEN years of experience as an On-site and/or Corporate Quality Control Manager for DoD construction projects. Experience does not need to be for DoD POL system repairs but must be for DoD construction projects.
4.3.2.9. Category 5 - Corporate Safety Manager: The Corporate Safety Manager is responsible for the firm’s overall Safety program, providing oversight and guidance to on-site Site Safety and Health (SSHO) Managers and associated projects. The Corporate Safety Manager also provides quality assurance of the firm’s overall safety program. The Corporate QC Manager reports all DoD POL quality control-related issues and concerns to the Program Manager. The Offeror shall submit a 1-page narrative that summarizes narrative shall summarize the experience of the Safety Manager, to include a description of the types of DoD construction projects completed, completion dates, and the location (DoD installation) of the work. All experience must represent construction on a DoD installation.
4.3.2.10. Minimum Qualifications - Corporate Safety Manager: The Corporate Safety Manager must demonstrate a minimum of TEN years of experience as an On-site and/or Corporate Safety Manager for DoD construction projects. Experience does not need to be for DoD POL system repairs but must be for DoD construction projects.
4.3.2.11. Technical Factor 2 Note: Offerors shall ensure the experience and qualifications of corporate experience and personnel submitted provide enough information for the Government to determine the extent of the Offeror’s experience, and use of in-house (organic) resources for program and project management/oversight/quality control.
4.3.3. Technical Factor 3 – Qualification of Key Field Personnel Comment by HAWLEY, KIRSTEN R CIV USAF AFMC AFICA/KA (ACE): KRH: Recommend updating formating to be consistent with Technical Factor 2 above (This doesn't stand out as much).
4.3.3.1. Section L: Submission Requirements
Offerors shall first identify the pool(s) for which they want to be considered and submit onsite key personnel information for each desired pool. Available pools include the Generalized DoD POL Wetted System Repair Pool, the API 653 Tank Repair Pool, and/or the Hydrant System Repair Pool. Offerors that are considered Acceptable for the API 653 Tank Repair Pool or the Hydrant System Repair Pool will automatically be considered Acceptable for the Generalized DoD POL Wetted System Repair Pool. Accordingly, offerors do not have to submit key personnel qualifications for the Generalized DoD POL Wetted System Repair Pool if they are confident they will meet the minimum requirements for either of the other two pools. Offeror’s on-site key personnel qualifications shall be submitted in accordance with Attachment L-04B Qualifications of Corporate and On-site Key Personnel and shall be cross referenced in Attachment L-04A Key Personnel Matrix. An offeror may submit key field personnel only for the General DoD POL Wetted Systems Repair Pool if they do not wish to participate in the other two specialized pools.
4.3.3.2. FOR EACH DESIRED POOL, Offerors shall provide a narrative, not-to-exceed one page per position, for the below Onsite Key Personnel. Offeror shall provide at least TWO qualified Site Superintendents/SSHO and TWO qualified Onsite Quality Control Managers (QCM). The same Site Superintendents/SSHO can be submitted for more than one Pool, but submitted Site Superintendents/SSHO cannot also be submitted for the role of QCM in any pool. Conversely, the same QCMs can be submitted for more than one Pool, but submitted QCMs cannot be submitted for the role of Superintendent in any pool. All Onsite Key Personnel must be employed by the Prime Offeror (or in the case of Joint Ventures, key personnel must be employed by one of the Joint Venture entities). The offeror is responsible for ensuring enough detail is provided for the Government to evaluate adherence to the minimum qualifications.
4.3.3.3. SECTION M: Evaluation Method
Qualifications of Key Field Personnel.
4.3.3.4. This technical factor will use the following ratings for evaluation:
| Adjectival Rating |
| Description |
| Acceptable |
| Proposal meets the requirements of the solicitation. |
| Unacceptable |
| Proposal does not meet the requirements of the solicitation. |
To be considered acceptable in any given pool, Offerors must:
ONE - Be able to provide TWO qualified Site Superintendents/SSHO and TWO qualified Onsite Quality Control Managers (QCM).
AND
TWO- The key personnel must meet the Minimum Qualifications described within each pool below; and the projects submitted for each key person must also meet the definitions provided for each pool and have been completed within five years from the date this RFP was issued.
Offerors that are considered Acceptable for the API 653 Tank Repair Pool or the Hydrant System Repair Pool will automatically be considered Acceptable for the Generalized DoD POL Wetted Repair Pool. The following three examples of evaluation demonstrate some of the multiple ways this technical factor may be evaluated:
| General Pool |
| API 653 |
| Hydrants |
| Super/SSHO |
| Not submitted |
| A |
| A |
| Super/SSHO |
| Not submitted |
| A |
| U |
| QCM |
| Not submitted |
| A |
| A |
| QCM |
| Not submitted |
| A |
| U |
| RATING PER POOL |
| A |
| A |
| U |
| TECH FACTOR 3 RATING |
| ACCEPTABLE |
| Contract Award Includes: |
| General |
| API 653 |
| Not Included |
| General Pool |
| API 653 |
| Hydrants |
| Super/SSHO |
| A |
| U |
| U |
| Super/SSHO |
| A |
| A |
| U |
| QCM |
| A |
| U |
| A |
| QCM |
| A |
| U |
| A |
| RATING PER POOL |
| A |
| U |
| U |
| TECH FACTOR 3 RATING |
| ACCEPTABLE |
| Contract Award Includes: |
| General |
| Not Included |
| Not Included |
| General Pool |
| API 653 |
| Hydrants |
| Super/SSHO |
| Not submitted |
| A |
| A |
| Super/SSHO |
| Not submitted |
| A |
| U |
| QCM |
| Not submitted |
| A |
| A |
| QCM |
| Not submitted |
| U |
| U |
| RATING PER POOL |
| U |
| U |
| U |
| TECH FACTOR 3 RATING |
| UNACCEPTABLE |
| Contract Award Includes: |
| No Award |
| No Award |
| No Award |
Further, while the same Site Superintendents/SSHO can be submitted for more than one Pool, if a submitted Site Superintendents/SSHO is also submitted for the role of QCM in any pool, the Factor will be considered Unacceptable. Similarly, while the same QCMs can be submitted for more than one Pool, if a QCM is also submitted for the role of Superintendent in any pool, the Factor will be considered Unacceptable. To be considered acceptable, the offeror must provide two separate and qualified teams, each consisting of an independent Superintendent/SSHO and QCM (a total of four available onsite personnel). All Onsite Key Personnel must be currently employed by the Prime Offeror (or in the case of Joint Ventures, key personnel must be currently employed by one of the Joint Venture entities). Promises of future Prime Contractor employment will not be considered acceptable – submitted personnel must be currently employed by the Prime Offeror (or in the case of a Joint Venture, one of the Joint Venture entities).
Offerors that are considered Acceptable for the API 653 Tank Repair Pool or the Hydrant System Repair Pool will automatically be considered Acceptable for the Generalized DoD POL Wetted Repair Pool. Offerors that receive an acceptable rating in the Generalized DoD POL Wetted Repair Pool will receive an acceptable rating overall for this factor. An offeror that does not receive an acceptable rating in the Generalized DoD POL Wetted Repair Pool will be rated as unacceptable for this technical factor.
For the offeror to participate in task order solicitations within a specialty pool, the offeror must receive an acceptable rating for that pool in this Fuels MATOC evaluation. The award document will identify the pools in which the contractor is qualified to participate.
Offerors that do not demonstrate the Minimum Qualifications or do not provide the required number of personnel will be rated Unacceptable for that pool.
4.3.3.5 GENERAL DOD POL WETTED REPAIR POOL (See definition of “DoD POL Wetted System Repairs” above to ensure the projects submitted for each key personnel are substantial enough to meet the definition provided.)
4.3.3.5.1.. Site Superintendent/SSHO Description: The Site Superintendent has the onsite authority to act for the contractor and is responsible for the onsite coordination, management, and execution of all onsite activities. The Site Superintendent is also dual-hatted to cover the duties of the Site Safety and Health Officer.
4.3.3.5.2. Minimum Qualifications: Each Site Superintendent must demonstrate a minimum of 5 years of experience as an onsite DoD Construction Superintendent. Roles as a Project Manager, QC Manager, or any other position will not be considered. The narrative shall summarize the experience of each Site Superintendent, to include a generalized description of experience as a Site Superintendent for DoD construction projects to substantiate five years of experience.
Site Superintendents must also serve as SSHO and thus the narrative shall document that each superintendent has completed the 30-Hour OSHA Construction Safety Course within the last five years from the date the RFP was issued and demonstrate at least one year of full time onsite SSHO experience working on DoD Construction projects (a dual-hatted role as SSHO is acceptable). Site Superintendents must have the credentials of a SSHO to be considered Acceptable.
Each Site Superintendent’s qualifications must demonstrate at least TWO DoD POL Wetted System Repairs projects of at least $500,000 each. The projects must have been completed within the past five years from the date the RFP was issued, and each site superintendent must have served in the site superintendent role for the entire field duration of the project, from mobilization through BOD. The narrative must include a detailed description of completed projects that demonstrate that they were primarily for DoD POL Wetted System Repairs, to include completion dates (BOD) and the location (DoD installation) of the work. All experience must represent construction on a DoD installation.
4.3.3.5.3. Onsite Quality Control Manager (QCM) Description: The Onsite Quality Control Manager is responsible for the contractor’s three-phase quality control program, to include the accuracy of the project QC Plan, accuracy and timeliness of daily QC Reports and site test reports, accuracy of all material submittals, ensuring all delivered/installed materials are those that were approved through the submittal process, and the quality of craftsmanship/construction in accordance with governing criteria.
4.3.3.5.4. Minimum Qualifications: The Onsite Quality Control Manager (QCM) must demonstrate a minimum of 5 years of experience as an onsite DoD Construction QCM. Roles as a Project Manager, Superintendent, or any other position will not be considered. The QCM must also have served as onsite QCM for at least TWO DoD POL Wetted System Repairs projects of at least $500,000 each. The projects must have been completed within the past five years from the date the RFP was issued, and the onsite QCM must have served in the onsite QCM role for the entire field duration of the project, from mobilization through BOD.
The narrative shall summarize the experience of the onsite QCM, to include a generalized description of experience as an Onsite QCM for DoD construction projects to substantiate five years of experience, as well as a detailed description of the completed projects that demonstrate that they were primarily for DoD POL Wetted System Repairs, to include completion dates (BOD) and the location (DoD installation) of the work. All experience must represent construction on a DoD installation. Comment by HAYHURST, MELISSA H CIV USAF AFICC 772 ESS/PKC: Do we need to define?
4.3.3.6. SPECIALIZED API 653 TANK REPAIR POOL (See definition of “API 653 Tank Repair Projects” above to ensure the projects submitted are substantial enough to meet the definition provided.)
4.3.3.6.1. Site Superintendent/SSHO Description: The Site Superintendent has the onsite authority to act for the contractor and is responsible for the onsite coordination, management, and execution of all onsite activities. The Site Superintendent is also dual-hatted to cover the duties of the Site Safety and Health Officer.
4.3.3.6.2. Minimum Qualifications: Each Site Superintendent must demonstrate a minimum of 5 years of experience as a onsite DoD Construction Superintendent. Roles as a Project Manager, QC Manager, or any other position will not be considered. The narrative shall summarize the experience of each Site Superintendent, to include a generalized description of experience as an On-Site Superintendent for DoD construction projects to substantiate five years of experience.
Site Superintendents must also serve as SSHO and thus the narrative shall document that each superintendent has completed the 30-Hour OSHA Construction Safety Course within the last five years from the date the RFP was issued, and demonstrate at least one year of full time onsite SSHO experience working on DoD Construction projects (a dual-hatted role as SSHO is acceptable). Site Superintendents must have the credentials of a SSHO to be considered Acceptable.
Each Site Superintendent’s qualifications must demonstrate at least TWO DoD POL API 653 tank repair projects of at least $500,000. The projects must have been completed within the past five years from the date the RFP was issued, and each site superintendent must have served in the site superintendent role for the entire field duration of the project, from mobilization through BOD. The narrative must include detailed descriptions of the completed projects that demonstrate that they were primarily for API 653 tank repairs, to include completion dates (BOD) and the location (DoD installation) of the work. All experience must represent construction on a DoD installation.
4.3.3.6.3. Onsite Quality Control Manager (QCM) Description: The Onsite Quality Control Manager is responsible for the contractor’s three-phase quality control program, to include the accuracy of the project QC Plan, accuracy and timeliness of daily QC Reports and site test reports, accuracy of all material submittals, ensuring all delivered/installed materials are those that were approved through the submittal process, and the quality of craftsmanship/construction in accordance with governing criteria.
4.3.3.6.4. Minimum Qualifications: The Onsite Quality Control Manager (QCM) must demonstrate a minimum of 5 years of experience as an onsite DoD Construction QCM. Roles as a Project Manager, Superintendent, or any other position will not be considered. The QCM must also have served as onsite QCM for at least TWO API 653 tank repair projects of at least $500,000 each. The projects must have been completed within the past five years from the date the RFP was issued, and the onsite QCM must have served in the onsite QCM role for the entire field duration of the project, from mobilization through BOD.
The narrative shall summarize the experience of the onsite QCM, to include a generalized description of experience as an Onsite QCM for DoD construction projects to substantiate five years of experience, as well as a detailed description of the completed projects that demonstrate they were primarily for API 653 tank repairs, to include completion dates (BOD) and the location (DoD installation) of the work. All experience must represent construction on a DoD installation.
4.3.3.7. SPECIALIZED HYDRANT SYSTEM REPAIR POOL: See definition of “Hydrant System Repair Projects” above to ensure the projects submitted are substantial enough to meet the definition provided.
4.3.3.7.1. Site Superintendent/SSHO: The Site Superintendent has the onsite authority to act for the contractor and is responsible for the onsite coordination, management, and execution of all onsite activities. The Site Superintendent is also dual-hatted to cover the duties of the Site Safety and Health Officer.
4.3.3.7.2. Minimum Qualifications: Each Site Superintendent must demonstrate a minimum of 5 years of experience as a onsite DoD Construction Superintendent. Roles as a Project Manager, QC Manager, or any other position will not be considered. The narrative shall summarize the experience of each Site Superintendent, to include a generalized description of experience as an On-Site Superintendent for DoD construction projects to substantiate five years of experience.
Site Superintendents must also serve as SSHO and thus the narrative shall document that each superintendent has completed the 30-Hour OSHA Construction Safety Course within the last five years from the date the RFP was issued, and demonstrate at least one year of full time onsite SSHO experience working on DoD Construction projects (a dual-hatted role as SSHO is acceptable). Site Superintendents must have the credentials of a SSHO to be considered Acceptable.
Each Site Superintendent’s qualifications must demonstrate at least TWO DoD POL Hydrant System Repair Projects of at least $500,000.